Lifts and loading houses · Tyne and Wear

Loading houses in Tyne and Wear

We cover loading houses across Tyne and Wear, including Newcastle upon Tyne, Sunderland, South Shields and Gateshead. Each job is planned around your operation, managed by us from start to finish and carried out by specialist engineers working under our management.

Guide £14,500–£32,000 per house ex VATFree site surveyEngland
Three external loading houses projecting from a warehouse with dock shelters
In short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

How does this suit sites in Tyne and Wear?

Units in Tyne and Wear with floors at dock height but no room for an internal leveller pit are typical candidates for an external loading house. Developers bringing forward industrial units in Tyne and Wear can specify loading houses at design stage, keeping the internal slab clear for whichever tenant takes the unit.

Any loading house proposed in Tyne and Wear needs its planning and building control position checked, which we look at during the site survey before quoting.

We keep the process simple for sites in Tyne and Wear. A free survey tells us what the dock needs; a fixed written quote tells you what it will cost and what is included. We then organise the installation, with specialist engineers under our management and a programme agreed around your shifts. Night and weekend work is available by arrangement. Before we leave, the new equipment is tested, demonstrated and handed over with its documentation.

When is a loading house better than an internal dock?

A loading house is usually the better option when the building floor is already at dock height but there is no practical way to form a leveller pit inside. It moves the whole dock outside the wall, leaving the internal floor clear.

  • No room inside: racking, production lines or mezzanines sit right up to the wall.
  • Difficult slab: the floor slab carries services or is unsuited to breaking out for a pit.
  • Thermal control: the building door closes at the wall line, so the leveller sits outside the heated or chilled space when no trailer is docked.
  • Security: the building can be closed at the wall line while the house itself stays open to the yard.
  • Narrow yards: an angled house lets trailers approach on a diagonal and can fit more bays along one wall.

Where the building floor is at yard level, a loading house alone will not solve the height difference, and a recessed approach or lift table is usually needed instead.

Does a loading house need planning permission or building approval?

A loading house can need planning permission, because it is a new external structure, so we check this at survey rather than assuming it is not needed. The answer depends on the site, the size of the house and any planning conditions already on the building.

Forming a new opening in the building wall is a structural alteration that may need approval. In England and Wales that means Building Regulations approval, in Scotland a building warrant, and in Northern Ireland building control approval.

Energy rules can also apply to the door in the building wall. In England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. Wales, Scotland and Northern Ireland have their own energy rules, and we confirm the figure that applies to your nation and project.

The leveller inside the house is specified to BS EN 1398:2009, the dock leveller safety standard. Our guide to loading houses explained goes through the approvals in more detail.

Towns we cover in Tyne and Wear

Each of the following towns in Tyne and Wear has its own page on loading houses, covering how we work and what to send us.

Guide price
£14,500–£32,000 per house, ex VAT

Budget range for supply and fit. The written quote after a free survey is the fixed price. All guide prices.

What do the rules in England mean for the work?

Sites in Tyne and Wear fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.

Questions

What warranty comes with new loading bay equipment?

New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Tyne and Wear site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.

How do you price loading houses for a site in Tyne and Wear?

Guide budgets for supply and fit are £14,500 to £32,000 per house, excluding VAT. The figure moves with size, insulation, the operator, electrics, access, any pit or groundworks and out-of-hours working. Where levellers are involved, the guide assumes an existing, sound pit. After the free survey you receive a fixed written quote, and that is the price for the agreed scope.

What door is used with a loading house?

The building wall behind a loading house usually has an insulated sectional door, which closes the building at the wall line when no trailer is docked. An existing door can sometimes be kept if it is in good condition. In England, replacement doors need to meet the Approved Document L limiting U-value for large doors.

Can a loading house be moved later?

Loading houses are bolted steel structures rather than masonry, so in principle they can be dismantled and moved if your needs change. In practice, relocation needs new foundations and an opening at the new position, so it is usually considered only where a house is fairly new and the new position suits it.