Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Tynemouth

Loading houses in Tynemouth

Businesses in Tynemouth and the rest of Tyne and Wear can come to us for loading houses, with one point of contact who stays with the job from first enquiry to sign-off.

Guide £14,500–£32,000 per house ex VATFree site surveyNE30
Location
Tynemouth, Tyne and Wear
Main postcode district
NE30
Nearby (straight line)
North Shields (1 mile), South Shields (1 mile) and Whitley Bay (2 miles)
Survey and quote
Free, with a fixed written quote
Loading houses, in short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

Is this right for your site in Tynemouth?

Units in Tynemouth with floors at dock height but no room for an internal leveller pit are typical candidates for an external loading house. Developers bringing forward industrial units in Tynemouth can specify loading houses at design stage, keeping the internal slab clear for whichever tenant takes the unit.

Racked warehouses around Tynemouth that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead.

Step one is a survey at your site in Tynemouth, which costs nothing and carries no obligation. Step two is a written quote with a fixed price and a clear scope. Step three is installation, scheduled around your operation and carried out by specialist installation engineers working under our management, including evenings or weekends if agreed. Step four is handover, when the equipment is tested in front of you and the paperwork is passed over.

Can a loading house be added to an existing building?

Yes, loading houses are often added to existing buildings, provided the floor is at or near dock height and the wall can take a suitable opening. Adding docks without breaking out the floor is one of the main reasons operators choose them.

At survey we check:

  • the floor height inside against the yard level outside;
  • whether an existing door opening can be used, or a new one formed in the cladding or masonry;
  • drains, ducts and other buried services where foundations will go;
  • the space trailers need to manoeuvre, and whether an angled house would work better;
  • any planning or building control approval the project may need.

Where the existing door is in good condition and suits the new layout, it can sometimes be kept. If your building has floors at yard level, a wider loading bay conversion may be the better route.

Does a loading house need planning permission or building approval?

A loading house can need planning permission, because it is a new external structure, so we check this at survey rather than assuming it is not needed. The answer depends on the site, the size of the house and any planning conditions already on the building.

Forming a new opening in the building wall is a structural alteration that may need approval. In England and Wales that means Building Regulations approval, in Scotland a building warrant, and in Northern Ireland building control approval.

Energy rules can also apply to the door in the building wall. In England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. Wales, Scotland and Northern Ireland have their own energy rules, and we confirm the figure that applies to your nation and project.

The leveller inside the house is specified to BS EN 1398:2009, the dock leveller safety standard. Our guide to loading houses explained goes through the approvals in more detail.

Guide price, Tynemouth
£14,500–£32,000 per house, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What we look at on site

  • Asbestos register and any other site hazard information
  • Scope to convert ground-level doors into docks or add lift tables
  • Working hours, shift patterns and windows for out-of-hours work
  • Control positions, isolators and any existing interlocks
  • Headroom above the opening and which track type will suit it
  • Yard gradient and the slope of the approach to the dock

Options to discuss

Leveller choice

A hydraulic swing-lip leveller for general trailer loading, or a telescopic-lip leveller for precise placement, end-loading and trailers that cannot be reversed tight to the dock.

Shelter or seal front

A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.

Regulations and approvals in England

In England, Approved Document L (2021) sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. That shapes door specification for sites in Tynemouth, so we confirm the requirement for your project and check what applies at survey before recommending a door.

Questions about loading houses in Tynemouth

Do you cover Tynemouth for loading houses?

Yes. We take on loading houses for businesses in Tynemouth and across Tyne and Wear. We survey the site, provide a fixed written quote and manage the installation, with specialist installation engineers working under our management. Visits are arranged in advance at a time that suits your operation, and the same single contact stays with the job through to handover.

How do you price loading houses for a site in Tynemouth?

Guide budgets for supply and fit are £14,500 to £32,000 per house, excluding VAT. The figure moves with size, insulation, the operator, electrics, access, any pit or groundworks and out-of-hours working. Where levellers are involved, the guide assumes an existing, sound pit. After the free survey you receive a fixed written quote, and that is the price for the agreed scope.

What warranty comes with new loading bay equipment?

New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Tynemouth site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.

What door is used with a loading house?

The building wall behind a loading house usually has an insulated sectional door, which closes the building at the wall line when no trailer is docked. An existing door can sometimes be kept if it is in good condition. In England, replacement doors need to meet the Approved Document L limiting U-value for large doors.

Can a loading house be used for a cold store?

Yes. Loading houses suit chilled and frozen operations because the building door closes at the wall line, keeping the cold space sealed when no trailer is docked. The panels, door and shelter or seal are specified to suit the temperatures involved, which we confirm at survey.

Loading houses near Tynemouth

Sites close to Tynemouth get the same service, including those in North Shields (1 mile), South Shields (1 mile) and Whitley Bay (2 miles), with every job run the same way.

Other loading bay services in Tynemouth

Full guide to loading houses · Everything we do in Tynemouth

Call us or request a quote online to talk through loading bay work at your site in Tynemouth.

Call freeGet a quote