Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Wallsend

Loading houses in Wallsend

When you need loading houses in Wallsend or anywhere else in Tyne and Wear, we organise the job end to end and keep disruption to your loading operation as low as we can.

Guide £14,500–£32,000 per house ex VATFree site surveyNE28
Location
Wallsend, Tyne and Wear
Main postcode district
NE28
Nearby (straight line)
Hebburn (1 mile), Jarrow (2 miles) and Felling (3 miles)
Survey and quote
Free, with a fixed written quote
Loading houses, in short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

What matters for loading houses in Wallsend?

Any loading house proposed in Wallsend needs its planning and building control position checked, which we look at during the site survey before quoting. Racked warehouses around Wallsend that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead.

Chilled stores near Wallsend sometimes favour loading houses because the building door closes at the wall line, keeping the cold envelope sealed when no trailer is docked.

Our part of the job in Wallsend is to survey, quote and manage; the fitting itself is done by specialist installation engineers working under our management. The survey and the written quote are free. Once the fixed price is accepted, we agree dates that work around your deliveries and shifts, including out-of-hours working where needed. Every installation is tested before handover, and you receive the documentation for each item fitted.

Can a loading house be added to an existing building?

Yes, loading houses are often added to existing buildings, provided the floor is at or near dock height and the wall can take a suitable opening. Adding docks without breaking out the floor is one of the main reasons operators choose them.

At survey we check:

  • the floor height inside against the yard level outside;
  • whether an existing door opening can be used, or a new one formed in the cladding or masonry;
  • drains, ducts and other buried services where foundations will go;
  • the space trailers need to manoeuvre, and whether an angled house would work better;
  • any planning or building control approval the project may need.

Where the existing door is in good condition and suits the new layout, it can sometimes be kept. If your building has floors at yard level, a wider loading bay conversion may be the better route.

What is a loading house made of?

A loading house is a steel frame clad in insulated composite panels, with a dock leveller built into its floor and a shelter or seal across its front. It is made to suit your building, trailers and yard rather than bought off the shelf.

  • Frame: galvanised or painted steel, supported on legs or a sub-frame that sits on concrete foundations.
  • Walls and roof: insulated composite panels, usually colour-matched to the building cladding, with guttering to carry rainwater away.
  • Floor and leveller: a steel deck with a hydraulic swing-lip or telescopic-lip leveller set into it.
  • Front: a retractable or inflatable shelter or a foam seal, with bumpers below to take trailer impact.
  • Building door: an insulated sectional door in the original wall opening, closing the building when no trailer is docked.
  • Extras: internal lighting, dock lights and traffic lights as required.

The insulated envelope reduces the heat or chill lost around the trailer compared with an open dock.

Guide price, Wallsend
£14,500–£32,000 per house, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What we look at on site

  • Age and condition of the equipment already in place
  • Working hours, shift patterns and windows for out-of-hours work
  • How drivers are prevented from pulling away too early
  • Temperature requirements for chilled, frozen or ambient goods
  • Headroom above the opening and which track type will suit it
  • Drainage on recessed or sloping dock approaches

Options to discuss

Leveller choice

A hydraulic swing-lip leveller for general trailer loading, or a telescopic-lip leveller for precise placement, end-loading and trailers that cannot be reversed tight to the dock.

Angled loading house

Set at an angle to the wall so trailers approach on a diagonal, useful on narrow yards and sometimes allowing more bays to fit along a single elevation.

Which rules apply in England?

Lift tables and dock lifts in Wallsend may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.

Questions about loading houses in Wallsend

Will you deal with building control and planning for a project in Wallsend?

We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.

Can you work outside our normal operating hours in Wallsend?

Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.

Can you work alongside our main contractor on a new build in Wallsend?

Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.

How long does a loading house take to install?

The programme depends mainly on foundation works and manufacturing lead times, and we set it out in writing with the quote. On site, foundations must cure before the frame goes up, and the rest of the work follows in sequence. We agree dates with you so other bays can keep working.

What door is used with a loading house?

The building wall behind a loading house usually has an insulated sectional door, which closes the building at the wall line when no trailer is docked. An existing door can sometimes be kept if it is in good condition. In England, replacement doors need to meet the Approved Document L limiting U-value for large doors.

Loading houses near Wallsend

Close neighbours of Wallsend with their own pages here: Hebburn (1 mile), Jarrow (2 miles) and Felling (3 miles). Choose one to see coverage details for that town.

Other loading bay services in Wallsend

Full guide to loading houses · Everything we do in Wallsend

Send a few photos of the dock and a short description of the problem, and we will come back to you about your Wallsend site.

Call freeGet a quote