Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Gateshead

Loading houses in Gateshead

We take enquiries about loading houses from businesses in Gateshead and across Tyne and Wear, and manage each job from the first conversation to completion, with specialist engineers working under our management.

Guide £14,500–£32,000 per house ex VATFree site surveyNE8
Location
Gateshead, Tyne and Wear
Main postcode district
NE8
Nearby (straight line)
Newcastle upon Tyne (1 mile), Felling (1 mile) and Gosforth (3 miles)
Survey and quote
Free, with a fixed written quote
Loading houses, in short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

Is this right for your site in Gateshead?

For older buildings in Gateshead with a raised floor and little internal space by the wall, an external house can provide a modern hydraulic dock without major alterations. Chilled stores near Gateshead sometimes favour loading houses because the building door closes at the wall line, keeping the cold envelope sealed when no trailer is docked.

Any loading house proposed in Gateshead needs its planning and building control position checked, which we look at during the site survey before quoting.

We do not give a fixed price without seeing the site. A free survey in Gateshead lets us check the details that affect the job, and the written quote that follows is a fixed price for the agreed scope. We plan the work around your operation, arrange out-of-hours access if you need it and manage specialist installation engineers throughout. Handover includes testing, a demonstration and the paperwork you need for your records.

A note on the freight picture around Gateshead and beyond: the Team Valley Trading Estate is one of the largest trading estates in the North East. Whatever traffic your own site handles, specify the dock to suit it.

Does a loading house need planning permission or building approval?

A loading house can need planning permission, because it is a new external structure, so we check this at survey rather than assuming it is not needed. The answer depends on the site, the size of the house and any planning conditions already on the building.

Forming a new opening in the building wall is a structural alteration that may need approval. In England and Wales that means Building Regulations approval, in Scotland a building warrant, and in Northern Ireland building control approval.

Energy rules can also apply to the door in the building wall. In England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. Wales, Scotland and Northern Ireland have their own energy rules, and we confirm the figure that applies to your nation and project.

The leveller inside the house is specified to BS EN 1398:2009, the dock leveller safety standard. Our guide to loading houses explained goes through the approvals in more detail.

What happens on site when a loading house is installed?

Installing a loading house takes the bay out of use from the foundation works to commissioning, but the building can stay secure because the existing wall and door remain until late in the job.

  1. Foundations: concrete pads or footings are formed in the yard and left to cure.
  2. Erection: the steel frame is lifted into place, usually by crane, and fixed to the foundations and building.
  3. Cladding and equipment: panels, leveller, shelter or seal, bumpers and lights are fitted.
  4. Door and electrics: the building door is fitted or adapted and the leveller and lights connected.
  5. Commissioning: everything is tested with a trailer before handover.

We ask you to provide yard space for the crane and deliveries, any drawings of drains or buried services, a power supply, and clear arrangements for keeping vehicles and people away from the lifting zone. Neighbouring bays may need to close briefly while the crane is working.

Guide price, Gateshead
£14,500–£32,000 per house, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What do we check at the survey?

  • Escape routes and pedestrian doors close to the bay
  • Power supply at each bay, including three-phase availability
  • Gaps around trailers where heated or chilled air escapes
  • Control positions, isolators and any existing interlocks
  • Access for deliveries, cranes or lifting equipment during installation
  • Dock height and the mix of trailers you load

Options to discuss

Straight loading house

Set square to the building wall, the simplest layout where the yard has room for trailers to reverse straight in. Usually the most economical arrangement for one or more bays.

Shelter or seal front

A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.

What do the rules in England mean for the work?

Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Gateshead. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.

Questions about loading houses in Gateshead

Do you cover Gateshead for loading houses?

Yes. We take on loading houses for businesses in Gateshead and across Tyne and Wear. We survey the site, provide a fixed written quote and manage the installation, with specialist installation engineers working under our management. Visits are arranged in advance at a time that suits your operation, and the same single contact stays with the job through to handover.

What warranty comes with new loading bay equipment?

New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Gateshead site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.

Do you remove and dispose of the old equipment?

Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Gateshead, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.

Does a loading house need planning permission?

A loading house can need planning permission because it is a new external structure, and we check this at survey for every project. Forming a new opening in the wall may also need Building Regulations approval, a building warrant in Scotland or building control approval in Northern Ireland, depending on where the site is.

Is a loading house cheaper than forming an internal pit?

Not always. A loading house includes a whole steel structure, so the equipment cost is higher, but it avoids breaking out the slab and losing internal floor space. The best comparison is made at survey, taking account of racking, services under the floor and how the building will be used.

Loading houses near Gateshead

We also cover towns near Gateshead, including Newcastle upon Tyne (1 mile), Felling (1 mile) and Gosforth (3 miles). Each has its own page with the same services and process.

Other loading bay services in Gateshead

Full guide to loading houses · Everything we do in Gateshead

Whether it is a new bay or a fault on an existing one, call us or request a quote for your site in Gateshead.

Call freeGet a quote