- Location
- Gateshead, Tyne and Wear
- Main postcode district
- NE8
- Nearby (straight line)
- Newcastle upon Tyne (1 mile), Felling (1 mile) and Gosforth (3 miles)
- Survey and quote
- Free, with a fixed written quote
A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.
Where does this fit at a dock in Gateshead?
Each lift table enquiry from Gateshead is surveyed and quoted in the same way as any other UK site, with groundworks for a pit priced separately. Where ground conditions in Gateshead make a deep recessed dock costly, a pit-mounted or surface-mounted lift table can be the more practical option.
Town-centre and retail sites around Gateshead with little yard space often choose a dock lift because a recessed approach ramp would take up too much room.
We never ask you to commit before you have a fixed price. A free survey at your Gateshead site comes first, followed by a written quote. When the order goes ahead, we plan the installation around your operation, book any out-of-hours working you need and manage the specialist installation engineers on site. The job ends with a full test, a run-through for the people who will use the equipment and a set of handover documents.
Worth knowing if you run a loading operation from Gateshead or nearby: the Team Valley Trading Estate is one of the largest trading estates in the North East. When specifying a bay, the trailer mix and dock height are what count.
What happens on site when a dock lift is installed?
Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.
- Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
- Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
- Power and controls: the power pack and control station are connected to the supply confirmed at survey.
- Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
- Handover: operators are shown how to use it, and the documents and examination regime are explained.
We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.
Should a dock lift be pit-mounted or surface-mounted?
A pit-mounted dock lift is best where pallet trucks need to roll straight on at ground level, while a surface-mounted lift suits sites where digging a pit is impractical or the lift may move later. Both raise goods to trailer height; the difference is how you get on at the bottom.
- Pit-mounted: the lift sits in a concrete pit so the platform is flush with the yard when lowered. Pallet trucks drive straight on. The pit needs drainage, and forming it is a structural job that may need building control approval.
- Surface-mounted: the lift stands on the existing floor and a short ramp leads on to the platform at its lowest height. No excavation, quicker to install and easier to relocate, but the ramp takes space and can be harder work with heavy loads.
Ground conditions, drainage, available space and the weight of your typical load usually decide it. We set out both options at survey where either would work.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What do we check at the survey?
- Escape routes and pedestrian doors close to the bay
- Headroom above the opening and which track type will suit it
- Age and condition of the equipment already in place
- Yard gradient and the slope of the approach to the dock
- Drainage on recessed or sloping dock approaches
- Working hours, shift patterns and windows for out-of-hours work
Options to discuss
Bridge plate
A hinged plate on the platform end that rests on the trailer bed during loading, bridging the gap so pallet trucks can cross smoothly between lift and trailer.
Guard rails and gates
Fixed rails and gated sides around the platform, arranged to suit the goods and how operators and pallet trucks move on and off the lift.
Which rules apply in England?
Workplace safety in England is regulated by HSE. For a loading bay in Gateshead, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.
Questions about scissor lift tables in Gateshead
Which building and safety rules apply to a site in Gateshead?
It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Gateshead, we check what applies at survey and design to it.
How do you price scissor lift tables for a site in Gateshead?
Guide budgets for supply and fit are £9,500 to £28,000 per lift, excluding VAT. The figure moves with size, insulation, the operator, electrics, access, any pit or groundworks and out-of-hours working. Where levellers are involved, the guide assumes an existing, sound pit. After the free survey you receive a fixed written quote, and that is the price for the agreed scope.
Is the site survey in Gateshead free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
Can a forklift drive on to a scissor lift table?
Only if the lift has been designed and rated for forklift traffic. Most loading bay lift tables are built for pallet trucks, and a forklift's weight and wheel loads need a much heavier platform and mechanism. Tell us how you load at survey so the lift is specified correctly.
Can people ride on a dock lift?
Some lift tables are designed to carry an operator with the load, and others are for goods only. If the lift carries people, LOLER thorough examinations are typically needed every 6 months rather than every 12, unless a written examination scheme sets a different interval. Your insurer or competent person will confirm.
Scissor lift tables near Gateshead
We also cover towns near Gateshead, including Newcastle upon Tyne (1 mile), Felling (1 mile) and Gosforth (3 miles). Each has its own page with the same services and process.
Other loading bay services in Gateshead
Full guide to scissor lift tables · Everything we do in Gateshead
Use the quote tool to tell us about the doors, levellers or shelters at your Gateshead site, and we will be in touch to arrange the next step.