Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Shelters and seals · New Milton

Dock seals in New Milton

We offer help with dock seals to businesses in New Milton and across Hampshire, whether the bay handles a few deliveries a week or trailers around the clock.

Guide £1,100–£2,600 per set ex VATFree site surveyBH25
Location
New Milton, Hampshire
Main postcode district
BH25
Nearby (straight line)
Christchurch (5 miles), Bournemouth (10 miles) and Ferndown (11 miles)
Survey and quote
Free, with a fixed written quote
Dock seals, in short

A dock seal is a set of fabric-covered foam pads fixed to the building around a loading bay door, usually a head pad and two side pads. When a trailer reverses in, its rear end presses into the foam, which compresses to close the gaps around the trailer body. Seals give a very tight fit but work best when the trailers using the bay are a consistent size.

Where does this fit at a dock in New Milton?

Older seals at docks in New Milton that have been left with split covers can soak up rain, becoming heavy and losing their shape over winter. Own-fleet distribution sites in New Milton, where the same trailers arrive day after day, are well suited to foam dock seals and the tight fit they give.

Weather-exposed bays in New Milton gain the most from a well-fitted seal, since wind and rain otherwise find every gap around the trailer.

Here is what happens after you contact us about a site in New Milton. We arrange a free survey, measure up and send a fixed written quote. If you go ahead, we manage the whole job, including ordering, delivery and coordination with your site team. Specialist installation engineers working under our management do the fitting, at times built around your loading schedule, with out-of-hours work by arrangement. Testing and handover documents close the job.

What do workplace transport rules mean for a sealed dock?

A sealed dock still needs safeguards against a trailer leaving early, and the seal, bumpers and other dock equipment must be kept in safe working order. In Great Britain the regulator is HSE; in Northern Ireland it is HSENI.

  • Drive-away: HSE workplace transport guidance (HSG136) and the HSE loading factsheet call for safeguards against drivers driving away too early, including traffic lights, vehicle or trailer restraints, or the person in charge keeping keys or paperwork until it is safe.
  • Trailer creep: because the trailer is pressed into compressed foam, it can ease forward during forklift loading. Restraints and well-set bumpers help keep it in position.
  • Equipment duties: a dock seal forms part of the loading bay's work equipment, so the general duty under PUWER 1998 in Great Britain, or PUWER (Northern Ireland) 1999, to keep equipment suitable and maintained applies.

Torn covers and crushed pads can hide damage to the fixings and wall behind, so seals belong in planned inspections of the dock.

Why does the gap between the seal and the bumpers matter?

The distance between the face of the seal and the face of the bumpers decides how far the trailer compresses the foam, and getting it right is the difference between a good seal and pads that are crushed or leave gaps.

  • Too little projection: the trailer meets the bumpers before it presses the foam enough, leaving gaps at the head and sides.
  • Too much projection: the foam is over-compressed, which crushes the pads, strains the fixings and can push the trailer forward as the foam recovers.
  • Worn bumpers: let trailers travel further than designed, over-compressing the seal every time.

Correct projection depends on the foam depth and your trailers, so we set it at installation and it should be checked at each service. Keeping dock bumpers in good condition protects both the seal and the leveller from repeated impact.

Guide price, New Milton
£1,100–£2,600 per set, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What we look at on site

  • Gaps around trailers where heated or chilled air escapes
  • Wheel guide positions and yard markings for reversing vehicles
  • Asbestos register and any other site hazard information
  • Age and condition of the equipment already in place
  • How often each door cycles during a typical shift
  • Condition of any existing leveller pit, kerb angles and pit drainage

Options to discuss

Tapered side pads

Side pads tapered in section so they guide the trailer in and intrude less into the trailer opening, which extends pad and cover life.

Fixed head pad seal

A head pad and two side pads of set depth, the simplest and tightest arrangement where every trailer using the bay is the same height.

What do the rules in England mean for the work?

Sites in New Milton fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.

Questions about dock seals in New Milton

Will you deal with building control and planning for a project in New Milton?

We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.

What details do you need from us to quote for dock seals?

To get started, send the site address in New Milton, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.

How do you price dock seals for a site in New Milton?

Guide budgets for supply and fit are £1,100 to £2,600 per set, excluding VAT. The figure moves with size, insulation, the operator, electrics, access, any pit or groundworks and out-of-hours working. Where levellers are involved, the guide assumes an existing, sound pit. After the free survey you receive a fixed written quote, and that is the price for the agreed scope.

Do dock seals block access to the trailer?

They can if they are poorly sized. Side pads that sit inside the line of the trailer body intrude into the opening and get in the way of pallets and forklifts. Correctly sized and tapered pads compress against the rear corners and leave the opening clear.

Are dock seals suitable for cold stores?

Yes, for cold stores with consistent trailers a dock seal gives a tight fit at a lower cost than an inflatable shelter. The pads must be kept in good condition, because water in the foam can freeze and stiffen it. Mixed fleets at cold stores are often better served by inflatable shelters.

Dock seals near New Milton

If your site is not in New Milton itself, it may be near one of these: Christchurch (5 miles), Bournemouth (10 miles) and Ferndown (11 miles). Pick the closest.

Other loading bay services in New Milton

Full guide to dock seals · Everything we do in New Milton

Whether it is a new bay or a fault on an existing one, call us or request a quote for your site in New Milton.

Call freeGet a quote