- Location
- Lancing, West Sussex
- Main postcode districts
- BN15 and BN43
- Nearby (straight line)
- Shoreham-by-Sea (2 miles), Worthing (2 miles) and Portslade (5 miles)
- Survey and quote
- Free, with a fixed written quote
A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.
How does this suit sites in Lancing?
Where ground conditions in Lancing make a deep recessed dock costly, a pit-mounted or surface-mounted lift table can be the more practical option. Sites in Lancing replacing an ageing dock lift should look at its LOLER examination history, as repeated defects can signal that replacement is due.
Food, drink and pharmaceutical sites around Lancing that need clean, controlled loading points may prefer a lift table with bellows enclosing the scissor mechanism.
We do not give a fixed price without seeing the site. A free survey in Lancing lets us check the details that affect the job, and the written quote that follows is a fixed price for the agreed scope. We plan the work around your operation, arrange out-of-hours access if you need it and manage specialist installation engineers throughout. Handover includes testing, a demonstration and the paperwork you need for your records.
Should a dock lift be pit-mounted or surface-mounted?
A pit-mounted dock lift is best where pallet trucks need to roll straight on at ground level, while a surface-mounted lift suits sites where digging a pit is impractical or the lift may move later. Both raise goods to trailer height; the difference is how you get on at the bottom.
- Pit-mounted: the lift sits in a concrete pit so the platform is flush with the yard when lowered. Pallet trucks drive straight on. The pit needs drainage, and forming it is a structural job that may need building control approval.
- Surface-mounted: the lift stands on the existing floor and a short ramp leads on to the platform at its lowest height. No excavation, quicker to install and easier to relocate, but the ramp takes space and can be harder work with heavy loads.
Ground conditions, drainage, available space and the weight of your typical load usually decide it. We set out both options at survey where either would work.
What inspections does a scissor lift table need under LOLER?
A scissor lift table is lifting equipment, so it needs a thorough examination under the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) at least every 12 months. If it lifts people, such as an operator riding with a pallet truck, the interval is every 6 months, unless a competent person draws up a written examination scheme instead. Which applies depends on the equipment and how it is used; your insurer or competent person will confirm.
In Northern Ireland the equivalent is LOLER (Northern Ireland) 1999, and the regulator is HSENI rather than HSE.
Thorough examination is separate from routine maintenance. The lift is also work equipment under PUWER, so it must be maintained in a safe condition between examinations.
We specify lift tables to BS EN 1570-1:2024, the current safety standard for lifting tables, and explain the examination regime at handover. Planned loading bay servicing can be arranged to fit around the examination dates.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What we look at on site
- Temperature requirements for chilled, frozen or ambient goods
- How drivers are prevented from pulling away too early
- Wheel guide positions and yard markings for reversing vehicles
- Wind exposure at the dock, which affects door and shelter choice
- Lighting inside trailers and at the dock face
- Working hours, shift patterns and windows for out-of-hours work
Options to discuss
Pit-mounted dock lift
Set in a concrete pit so the platform lowers flush with the yard, letting pallet trucks drive straight on. The best choice for frequent, heavy loading at a fixed door.
Surface-mounted lift table
Stands on the existing floor with a short ramp on to the platform at its lowest height. No excavation, a quicker install and easier to relocate later.
Regulations and approvals in England
Sites in Lancing fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.
Questions about scissor lift tables in Lancing
Which building and safety rules apply to a site in Lancing?
It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Lancing, we check what applies at survey and design to it.
Is the site survey in Lancing free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
Can you work outside our normal operating hours in Lancing?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
Can a scissor lift table be installed outdoors?
Yes, scissor lift tables are often installed outdoors at the loading door. Outdoor lifts need a drained pit or a suitable base, weather-resistant finishes and controls, and sometimes a canopy over the loading area. A canopy is an external structure that may need planning permission, which we check at survey.
Can a forklift drive on to a scissor lift table?
Only if the lift has been designed and rated for forklift traffic. Most loading bay lift tables are built for pallet trucks, and a forklift's weight and wheel loads need a much heavier platform and mechanism. Tell us how you load at survey so the lift is specified correctly.
Scissor lift tables near Lancing
Businesses outside Lancing may find their nearest town in this list: Shoreham-by-Sea (2 miles), Worthing (2 miles) and Portslade (5 miles). Each page covers doors, docks, repairs and servicing.
Other loading bay services in Lancing
Full guide to scissor lift tables · Everything we do in Lancing
Tell us what is happening at your Lancing dock, what equipment is there and when it is used, and we will suggest the right next step.
