Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Brighton

Scissor lift tables in Brighton

Need scissor lift tables for a warehouse, factory or distribution site in Brighton? Below you will find how we approach the work, what we check on site and the details that help us give you an accurate answer.

Guide £9,500–£28,000 per lift ex VATFree site surveyBN2
Location
Brighton, East Sussex
Main postcode district
BN2
Nearby (straight line)
Hove (1 mile), Portslade (3 miles) and Rottingdean (4 miles)
Survey and quote
Free, with a fixed written quote
Scissor lift tables, in short

A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.

Where does this fit at a dock in Brighton?

Town-centre and retail sites around Brighton with little yard space often choose a dock lift because a recessed approach ramp would take up too much room. Each lift table enquiry from Brighton is surveyed and quoted in the same way as any other UK site, with groundworks for a pit priced separately.

Businesses in Brighton receiving both vans and articulated trailers through one doorway can use a lift table to serve every bed height from the same opening.

We do not give a fixed price without seeing the site. A free survey in Brighton lets us check the details that affect the job, and the written quote that follows is a fixed price for the agreed scope. We plan the work around your operation, arrange out-of-hours access if you need it and manage specialist installation engineers throughout. Handover includes testing, a demonstration and the paperwork you need for your records.

What happens on site when a dock lift is installed?

Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.

  1. Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
  2. Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
  3. Power and controls: the power pack and control station are connected to the supply confirmed at survey.
  4. Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
  5. Handover: operators are shown how to use it, and the documents and examination regime are explained.

We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.

What inspections does a scissor lift table need under LOLER?

A scissor lift table is lifting equipment, so it needs a thorough examination under the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) at least every 12 months. If it lifts people, such as an operator riding with a pallet truck, the interval is every 6 months, unless a competent person draws up a written examination scheme instead. Which applies depends on the equipment and how it is used; your insurer or competent person will confirm.

In Northern Ireland the equivalent is LOLER (Northern Ireland) 1999, and the regulator is HSENI rather than HSE.

Thorough examination is separate from routine maintenance. The lift is also work equipment under PUWER, so it must be maintained in a safe condition between examinations.

We specify lift tables to BS EN 1570-1:2024, the current safety standard for lifting tables, and explain the examination regime at handover. Planned loading bay servicing can be arranged to fit around the examination dates.

Guide price, Brighton
£9,500–£28,000 per lift, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

Survey checklist for your dock

  • Bumper position and wear or damage on the dock face
  • Control positions, isolators and any existing interlocks
  • Wheel guide positions and yard markings for reversing vehicles
  • Age and condition of the equipment already in place
  • Headroom above the opening and which track type will suit it
  • Gaps around trailers where heated or chilled air escapes

Options to discuss

Surface-mounted lift table

Stands on the existing floor with a short ramp on to the platform at its lowest height. No excavation, a quicker install and easier to relocate later.

Safety bellows and skirts

A flexible enclosure around the scissor mechanism that keeps hands, feet and debris out of shear and crush points, and helps keep the mechanism clean.

Which rules apply in England?

Workplace safety in England is regulated by HSE. For a loading bay in Brighton, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.

Questions about scissor lift tables in Brighton

Is the site survey in Brighton free?

Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.

Will you deal with building control and planning for a project in Brighton?

We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.

Can you work outside our normal operating hours in Brighton?

Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.

Can people ride on a dock lift?

Some lift tables are designed to carry an operator with the load, and others are for goods only. If the lift carries people, LOLER thorough examinations are typically needed every 6 months rather than every 12, unless a written examination scheme sets a different interval. Your insurer or competent person will confirm.

Does a scissor lift table need a pit?

No, a scissor lift table does not always need a pit. Surface-mounted lifts stand on the existing floor with a short ramp at the bottom. A pit lets the platform sit flush with the yard so pallet trucks roll straight on, which suits frequent or heavy loading. We recommend one or the other at survey.

Scissor lift tables near Brighton

Other towns within reach of Brighton on our coverage list include Hove (1 mile), Portslade (3 miles) and Rottingdean (4 miles), all covered on the same terms.

Other loading bay services in Brighton

Full guide to scissor lift tables · Everything we do in Brighton

For a written price on loading bay work in Brighton, request a quote and include photos of the bay if you can.

Call freeGet a quote