- Location
- Exeter, Devon
- Main postcode district
- EX2
- Nearby (straight line)
- Exmouth (9 miles), Tiverton (12 miles) and Newton Abbot (14 miles)
- Survey and quote
- Free, with a fixed written quote
A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.
What should sites in Exeter consider?
Sites in Exeter replacing an ageing dock lift should look at its LOLER examination history, as repeated defects can signal that replacement is due. Food, drink and pharmaceutical sites around Exeter that need clean, controlled loading points may prefer a lift table with bellows enclosing the scissor mechanism.
Split-level buildings near Exeter sometimes use scissor lift tables internally to move pallets between floor levels without relying on forklifts and ramps.
We keep the process simple for sites in Exeter. A free survey tells us what the dock needs; a fixed written quote tells you what it will cost and what is included. We then organise the installation, with specialist engineers under our management and a programme agreed around your shifts. Night and weekend work is available by arrangement. Before we leave, the new equipment is tested, demonstrated and handed over with its documentation.
What inspections does a scissor lift table need under LOLER?
A scissor lift table is lifting equipment, so it needs a thorough examination under the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) at least every 12 months. If it lifts people, such as an operator riding with a pallet truck, the interval is every 6 months, unless a competent person draws up a written examination scheme instead. Which applies depends on the equipment and how it is used; your insurer or competent person will confirm.
In Northern Ireland the equivalent is LOLER (Northern Ireland) 1999, and the regulator is HSENI rather than HSE.
Thorough examination is separate from routine maintenance. The lift is also work equipment under PUWER, so it must be maintained in a safe condition between examinations.
We specify lift tables to BS EN 1570-1:2024, the current safety standard for lifting tables, and explain the examination regime at handover. Planned loading bay servicing can be arranged to fit around the examination dates.
What happens on site when a dock lift is installed?
Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.
- Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
- Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
- Power and controls: the power pack and control station are connected to the supply confirmed at survey.
- Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
- Handover: operators are shown how to use it, and the documents and examination regime are explained.
We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What we look at on site
- Asbestos register and any other site hazard information
- Traffic routes for vehicles and separation of pedestrians
- Working hours, shift patterns and windows for out-of-hours work
- Whether planning, building control or a building warrant may be needed
- Forklift and pallet truck loads crossing the leveller platform
- Lighting inside trailers and at the dock face
Options to discuss
Guard rails and gates
Fixed rails and gated sides around the platform, arranged to suit the goods and how operators and pallet trucks move on and off the lift.
Pit-mounted dock lift
Set in a concrete pit so the platform lowers flush with the yard, letting pallet trucks drive straight on. The best choice for frequent, heavy loading at a fixed door.
Which rules apply in England?
Sites in Exeter fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.
Questions about scissor lift tables in Exeter
How long does installation take at a site in Exeter?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
Can you work outside our normal operating hours in Exeter?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
Which building and safety rules apply to a site in Exeter?
It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Exeter, we check what applies at survey and design to it.
Can people ride on a dock lift?
Some lift tables are designed to carry an operator with the load, and others are for goods only. If the lift carries people, LOLER thorough examinations are typically needed every 6 months rather than every 12, unless a written examination scheme sets a different interval. Your insurer or competent person will confirm.
What capacity of dock lift do I need?
A dock lift needs a capacity above the heaviest combined load it will carry, including the goods, the pallet truck and an operator if they ride on it. Loading bay lifts are typically rated somewhere between 2,000 and 6,000 kg. We work out the right rating from your loads at survey.
Scissor lift tables near Exeter
Distances are measured from Exeter. Nearby towns we cover include Exmouth (9 miles), Tiverton (12 miles) and Newton Abbot (14 miles), and other towns in the area are covered too.
Other loading bay services in Exeter
Full guide to scissor lift tables · Everything we do in Exeter
Tell us what is happening at your Exeter dock, what equipment is there and when it is used, and we will suggest the right next step.
