- Location
- Lochgilphead, Argyll and Bute
- Main postcode district
- PA31
- Nearby (straight line)
- Dunoon (20 miles), Oban (26 miles) and Greenock (27 miles)
- Survey and quote
- Free, with a fixed written quote
A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.
What matters for loading houses in Lochgilphead?
Chilled stores near Lochgilphead sometimes favour loading houses because the building door closes at the wall line, keeping the cold envelope sealed when no trailer is docked. For older buildings in Lochgilphead with a raised floor and little internal space by the wall, an external house can provide a modern hydraulic dock without major alterations.
Any loading house proposed in Lochgilphead needs its planning and building control position checked, which we look at during the site survey before quoting.
We keep the process simple for sites in Lochgilphead. A free survey tells us what the dock needs; a fixed written quote tells you what it will cost and what is included. We then organise the installation, with specialist engineers under our management and a programme agreed around your shifts. Night and weekend work is available by arrangement. Before we leave, the new equipment is tested, demonstrated and handed over with its documentation.
How much does a loading house cost?
A loading house typically costs £14,500 to £32,000 per house, supplied and installed, excluding VAT. That covers the insulated structure with its leveller and shelter or seal; the figure for your site depends on size, layout and what has to happen to the building and yard.
What moves the price:
- Size and layout: straight houses are simpler than angled ones, and larger houses use more steel and panel.
- Leveller type: telescopic-lip levellers cost more than swing-lip.
- Front sealing: inflatable shelters cost more than retractable shelters or foam seals.
- Foundations: ground conditions and buried services decide the size of pads or footings.
- Building works: forming or enlarging the wall opening, and a new insulated door if needed.
- Electrics and access: supply to the leveller and lights, crane access and any out-of-hours working.
These are guide budgets. After a free site survey we send a written quote that is the fixed price. VAT is added at the standard rate.
When is a loading house better than an internal dock?
A loading house is usually the better option when the building floor is already at dock height but there is no practical way to form a leveller pit inside. It moves the whole dock outside the wall, leaving the internal floor clear.
- No room inside: racking, production lines or mezzanines sit right up to the wall.
- Difficult slab: the floor slab carries services or is unsuited to breaking out for a pit.
- Thermal control: the building door closes at the wall line, so the leveller sits outside the heated or chilled space when no trailer is docked.
- Security: the building can be closed at the wall line while the house itself stays open to the yard.
- Narrow yards: an angled house lets trailers approach on a diagonal and can fit more bays along one wall.
Where the building floor is at yard level, a loading house alone will not solve the height difference, and a recessed approach or lift table is usually needed instead.
The same published guide range applies across Scotland; access, out-of-hours working and site conditions are confirmed at the free survey.
Survey checklist for your dock
- Escape routes and pedestrian doors close to the bay
- Wheel guide positions and yard markings for reversing vehicles
- Gaps around trailers where heated or chilled air escapes
- Whether planning, building control or a building warrant may be needed
- Access for deliveries, cranes or lifting equipment during installation
- Traffic routes for vehicles and separation of pedestrians
Options to discuss
Straight loading house
Set square to the building wall, the simplest layout where the yard has room for trailers to reverse straight in. Usually the most economical arrangement for one or more bays.
Angled loading house
Set at an angle to the wall so trailers approach on a diagonal, useful on narrow yards and sometimes allowing more bays to fit along a single elevation.
Regulations and approvals in Scotland
In Scotland, building work such as forming a new opening or a dock leveller pit may need a building warrant from the local authority before it starts. For sites in Lochgilphead, external structures such as loading houses or canopies may also need planning permission from the council. We check what applies at survey and factor any approvals into the programme.
For Lochgilphead, installation work is planned in advance rather than on a routine round. The survey and quote are free; where we can, we group installation visits with other work nearby, and any travel and accommodation costs for fitting are set out clearly in the quote.
Questions about loading houses in Lochgilphead
Can you work alongside our main contractor on a new build in Lochgilphead?
Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.
Do you remove and dispose of the old equipment?
Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Lochgilphead, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.
Will you deal with building control and planning for a project in Lochgilphead?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
What door is used with a loading house?
The building wall behind a loading house usually has an insulated sectional door, which closes the building at the wall line when no trailer is docked. An existing door can sometimes be kept if it is in good condition. In England, replacement doors need to meet the Approved Document L limiting U-value for large doors.
How long does a loading house take to install?
The programme depends mainly on foundation works and manufacturing lead times, and we set it out in writing with the quote. On site, foundations must cure before the frame goes up, and the rest of the work follows in sequence. We agree dates with you so other bays can keep working.
Loading houses near Lochgilphead
If your site is not in Lochgilphead itself, it may be near one of these: Dunoon (20 miles), Oban (26 miles) and Greenock (27 miles). Pick the closest.
Other loading bay services in Lochgilphead
Full guide to loading houses · Everything we do in Lochgilphead
For a written price on loading bay work in Lochgilphead, request a quote and include photos of the bay if you can.
