Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Greenock

Loading houses in Greenock

From a single bay to a full row of docks, we can help with loading houses in Greenock and at sites elsewhere in Renfrewshire and Inverclyde.

Guide £14,500–£32,000 per house ex VATFree site surveyPA15, PA16
Location
Greenock, Renfrewshire and Inverclyde
Main postcode districts
PA15 and PA16
Nearby (straight line)
Helensburgh (4 miles), Dunoon (6 miles) and Vale of Leven (7 miles)
Survey and quote
Free, with a fixed written quote
Loading houses, in short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

How does this suit sites in Greenock?

Developers bringing forward industrial units in Greenock can specify loading houses at design stage, keeping the internal slab clear for whichever tenant takes the unit. Where a yard in Greenock is narrow, an angled loading house lets trailers approach on a diagonal and can sometimes fit more bays along one wall.

Units in Greenock with floors at dock height but no room for an internal leveller pit are typical candidates for an external loading house.

Step one is a survey at your site in Greenock, which costs nothing and carries no obligation. Step two is a written quote with a fixed price and a clear scope. Step three is installation, scheduled around your operation and carried out by specialist installation engineers working under our management, including evenings or weekends if agreed. Step four is handover, when the equipment is tested in front of you and the paperwork is passed over.

Can a loading house be added to an existing building?

Yes, loading houses are often added to existing buildings, provided the floor is at or near dock height and the wall can take a suitable opening. Adding docks without breaking out the floor is one of the main reasons operators choose them.

At survey we check:

  • the floor height inside against the yard level outside;
  • whether an existing door opening can be used, or a new one formed in the cladding or masonry;
  • drains, ducts and other buried services where foundations will go;
  • the space trailers need to manoeuvre, and whether an angled house would work better;
  • any planning or building control approval the project may need.

Where the existing door is in good condition and suits the new layout, it can sometimes be kept. If your building has floors at yard level, a wider loading bay conversion may be the better route.

How much does a loading house cost?

A loading house typically costs £14,500 to £32,000 per house, supplied and installed, excluding VAT. That covers the insulated structure with its leveller and shelter or seal; the figure for your site depends on size, layout and what has to happen to the building and yard.

What moves the price:

  • Size and layout: straight houses are simpler than angled ones, and larger houses use more steel and panel.
  • Leveller type: telescopic-lip levellers cost more than swing-lip.
  • Front sealing: inflatable shelters cost more than retractable shelters or foam seals.
  • Foundations: ground conditions and buried services decide the size of pads or footings.
  • Building works: forming or enlarging the wall opening, and a new insulated door if needed.
  • Electrics and access: supply to the leveller and lights, crane access and any out-of-hours working.

These are guide budgets. After a free site survey we send a written quote that is the fixed price. VAT is added at the standard rate.

Guide price, Greenock
£14,500–£32,000 per house, ex VAT

The same published guide range applies across Scotland; access, out-of-hours working and site conditions are confirmed at the free survey.

What does the free survey cover?

  • Clear opening width and height for each door
  • Temperature requirements for chilled, frozen or ambient goods
  • Drainage on recessed or sloping dock approaches
  • Escape routes and pedestrian doors close to the bay
  • Whether planning, building control or a building warrant may be needed
  • Working hours, shift patterns and windows for out-of-hours work

Options to discuss

Leveller choice

A hydraulic swing-lip leveller for general trailer loading, or a telescopic-lip leveller for precise placement, end-loading and trailers that cannot be reversed tight to the dock.

Shelter or seal front

A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.

Which rules apply in Scotland?

HSE is the workplace safety regulator in Scotland. At a loading bay in Greenock, doors need to satisfy regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, dock equipment must be kept safe under PUWER, and drivers must be prevented from pulling away too early. We check what applies at survey.

Questions about loading houses in Greenock

Do you remove and dispose of the old equipment?

Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Greenock, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.

Can you work alongside our main contractor on a new build in Greenock?

Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.

How long does installation take at a site in Greenock?

It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.

Can a loading house be used for a cold store?

Yes. Loading houses suit chilled and frozen operations because the building door closes at the wall line, keeping the cold space sealed when no trailer is docked. The panels, door and shelter or seal are specified to suit the temperatures involved, which we confirm at survey.

Is a loading house cheaper than forming an internal pit?

Not always. A loading house includes a whole steel structure, so the equipment cost is higher, but it avoids breaking out the slab and losing internal floor space. The best comparison is made at survey, taking account of racking, services under the floor and how the building will be used.

Loading houses near Greenock

Distances are measured from Greenock. Nearby towns we cover include Helensburgh (4 miles), Dunoon (6 miles) and Vale of Leven (7 miles), and other towns in the area are covered too.

Other loading bay services in Greenock

Full guide to loading houses · Everything we do in Greenock

If a loading bay in Greenock needs attention, call us or send photos and details online.

Call freeGet a quote