- Location
- Oban, Argyll and Bute
- Main postcode district
- PA34
- Nearby (straight line)
- Lochgilphead (26 miles)
- Survey and quote
- Free, with a fixed written quote
A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.
Where does this fit at a dock in Oban?
Developers bringing forward industrial units in Oban can specify loading houses at design stage, keeping the internal slab clear for whichever tenant takes the unit. Manufacturing businesses around Oban adding a dock to an existing building often find a loading house less disruptive than breaking out the slab inside.
For older buildings in Oban with a raised floor and little internal space by the wall, an external house can provide a modern hydraulic dock without major alterations.
It starts with a free site survey in Oban, where we measure the openings, check the dock and talk through how the bay is used. You then receive a fixed written quote. Once you accept, we manage the job: specialist installation engineers carry out the work under our management, planned around your deliveries, and out-of-hours working can be arranged. At handover we test everything with you and leave the documentation.
Does a loading house need planning permission or building approval?
A loading house can need planning permission, because it is a new external structure, so we check this at survey rather than assuming it is not needed. The answer depends on the site, the size of the house and any planning conditions already on the building.
Forming a new opening in the building wall is a structural alteration that may need approval. In England and Wales that means Building Regulations approval, in Scotland a building warrant, and in Northern Ireland building control approval.
Energy rules can also apply to the door in the building wall. In England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. Wales, Scotland and Northern Ireland have their own energy rules, and we confirm the figure that applies to your nation and project.
The leveller inside the house is specified to BS EN 1398:2009, the dock leveller safety standard. Our guide to loading houses explained goes through the approvals in more detail.
What happens on site when a loading house is installed?
Installing a loading house takes the bay out of use from the foundation works to commissioning, but the building can stay secure because the existing wall and door remain until late in the job.
- Foundations: concrete pads or footings are formed in the yard and left to cure.
- Erection: the steel frame is lifted into place, usually by crane, and fixed to the foundations and building.
- Cladding and equipment: panels, leveller, shelter or seal, bumpers and lights are fitted.
- Door and electrics: the building door is fitted or adapted and the leveller and lights connected.
- Commissioning: everything is tested with a trailer before handover.
We ask you to provide yard space for the crane and deliveries, any drawings of drains or buried services, a power supply, and clear arrangements for keeping vehicles and people away from the lifting zone. Neighbouring bays may need to close briefly while the crane is working.
The same published guide range applies across Scotland; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- Traffic routes for vehicles and separation of pedestrians
- Temperature requirements for chilled, frozen or ambient goods
- Bumper position and wear or damage on the dock face
- Yard gradient and the slope of the approach to the dock
- Headroom above the opening and which track type will suit it
- Forklift and pallet truck loads crossing the leveller platform
Options to discuss
Shelter or seal front
A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.
Leveller choice
A hydraulic swing-lip leveller for general trailer loading, or a telescopic-lip leveller for precise placement, end-loading and trailers that cannot be reversed tight to the dock.
Regulations and approvals in Scotland
Lift tables at Scottish sites are lifting equipment under LOLER, which means thorough examination at least every 12 months, or every 6 months if people are lifted, depending on the equipment and its use. For a site in Oban, your insurer or competent person will confirm the interval, and we check what applies at survey.
We cover Oban by arrangement. The survey and written quote stay free: for remote and island sites we often start from your photos, drawings and a video call, then confirm measurements on site. Travel and any accommodation needed for the installation are shown as separate lines in the fixed quote.
Questions about loading houses in Oban
Is the site survey in Oban free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
Can you work outside our normal operating hours in Oban?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
What warranty comes with new loading bay equipment?
New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Oban site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.
Can a loading house be used for a cold store?
Yes. Loading houses suit chilled and frozen operations because the building door closes at the wall line, keeping the cold space sealed when no trailer is docked. The panels, door and shelter or seal are specified to suit the temperatures involved, which we confirm at survey.
How long does a loading house take to install?
The programme depends mainly on foundation works and manufacturing lead times, and we set it out in writing with the quote. On site, foundations must cure before the frame goes up, and the rest of the work follows in sequence. We agree dates with you so other bays can keep working.
Loading houses near Oban
Sites close to Oban get the same service, including those in Lochgilphead (26 miles), with every job run the same way.
Other loading bay services in Oban
Full guide to loading houses · Everything we do in Oban
Use the quote tool to tell us about the doors, levellers or shelters at your Oban site, and we will be in touch to arrange the next step.
