- Location
- Gateshead, Tyne and Wear
- Main postcode district
- NE8
- Nearby (straight line)
- Newcastle upon Tyne (1 mile), Felling (1 mile) and Gosforth (3 miles)
- Survey and quote
- Free, with a fixed written quote
An inflatable dock shelter is a dock shelter with air-filled fabric cushions at the top and sides of the opening, kept deflated and close to the building until a trailer has reversed in. A fan then inflates the cushions so they press against the trailer roof and sides, giving a close seal that adapts to different trailer widths and heights, and deflates again before the trailer leaves.
How does this suit sites in Gateshead?
When a chilled dock in Gateshead sees condensation and ice around the door, the seal at the trailer is often where improvement starts. Operators replacing foam seals in Gateshead that keep wearing out against ill-fitting trailers may find an inflatable shelter suffers far less rubbing.
Frozen food stores in Gateshead loading trailers of varying sizes can use inflatable shelters to keep warm outside air away from the open door.
We keep the process simple for sites in Gateshead. A free survey tells us what the dock needs; a fixed written quote tells you what it will cost and what is included. We then organise the installation, with specialist engineers under our management and a programme agreed around your shifts. Night and weekend work is available by arrangement. Before we leave, the new equipment is tested, demonstrated and handed over with its documentation.
One feature of the freight network near Gateshead is worth a mention: the Team Valley Trading Estate is one of the largest trading estates in the North East. Busy or quiet, a dock needs equipment sized for the vehicles it receives.
What is involved in installing an inflatable dock shelter?
Installing an inflatable shelter involves fixing a steel frame to the building around the dock door, mounting the cushions and fan, and wiring the controls, usually over one to two days per bay.
- The wall is checked and fixing points or a subframe prepared.
- The frame is fixed from powered access equipment in the yard.
- Top and side cushions are fitted, with protective covers where specified.
- The fan unit is mounted and the control panel wired, including interlocks to the door, leveller or restraint.
- Inflation, deflation and cushion retraction are tested with a trailer in the bay.
You will need to provide a clear yard area in front of the bay, take the bay out of use and arrange a power supply near the door, or ask us to include one. At cold stores we plan the work with the dock door kept closed, so the store stays at temperature while the shelter goes up outside.
How does an inflatable shelter work with the dock door and leveller?
An inflatable shelter is the first step in the dock sequence: it seals around the trailer before the door opens and only deflates once the door has closed. Getting that order right is what makes it effective.
- The trailer reverses onto the bumpers, guided by dock lights and wheel guides.
- The trailer is secured by restraint or key control, and the outside light shows red.
- The cushions inflate around the top and sides of the trailer.
- With the trailer sealed, the door opens and the leveller is deployed.
- After loading, the leveller is stored and the door closed.
- The cushions deflate and retract, and the light turns green.
Deflated cushions must sit clear of the door and leveller, and internal straps or weights pull them back so trailers do not catch them. Interlocks make each step depend on the last, so staff cannot open the door onto an unsealed trailer.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- Yard gradient and the slope of the approach to the dock
- Access for deliveries, cranes or lifting equipment during installation
- Headroom above the opening and which track type will suit it
- Age and condition of the equipment already in place
- Wall and steel structure for door, shelter and bumper fixings
- Lighting inside trailers and at the dock face
Options to discuss
Top cushion only
A single inflatable cushion across the top of the opening, paired with fixed side pads or curtains, for docks where trailer heights vary more than widths.
Protective outer covers
Hard-wearing covers over the cushions that shield the fabric from weather, sunlight and trailer contact, extending cushion life on exposed docks.
Which rules apply in England?
Workplace safety in England is regulated by HSE. For a loading bay in Gateshead, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.
Questions about inflatable dock shelters in Gateshead
How long does installation take at a site in Gateshead?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
Is the site survey in Gateshead free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
Which building and safety rules apply to a site in Gateshead?
It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Gateshead, we check what applies at survey and design to it.
Can a punctured cushion be repaired?
Small punctures and tears can usually be patched, and a badly damaged cushion can be replaced on its own without changing the frame or fan. Repairs are carried out on a chargeable visit, with the price agreed before anyone attends.
Do the cushions touch the trailer as it reverses in?
No, the cushions stay deflated and pulled back against the building while the trailer reverses in, so there is no rubbing as it docks. They inflate only once the trailer is in position and secured, which reduces wear on the fabric compared with foam seals and curtain shelters.
Inflatable dock shelters near Gateshead
Distances are measured from Gateshead. Nearby towns we cover include Newcastle upon Tyne (1 mile), Felling (1 mile) and Gosforth (3 miles), and other towns in the area are covered too.
Other loading bay services in Gateshead
Full guide to inflatable dock shelters · Everything we do in Gateshead
Get in touch about loading bay doors and dock equipment in Gateshead: call, email or use the quote tool.
