- Location
- Shirley, West Midlands
- Main postcode district
- B90
- Nearby (straight line)
- Solihull (2 miles), Birmingham (6 miles) and Washwood Heath (6 miles)
- Survey and quote
- Free, with a fixed written quote
A swing-lip dock leveller is a hydraulic ramp set into a pit at the dock edge, with a hinged steel lip along its front. When a trailer is docked the platform rises, the lip swings out, and the platform lowers until the lip rests on the trailer bed, forming a bridge for forklifts and pallet trucks. The lip is typically about 400 to 500 mm long.
What matters for swing-lip dock levellers in Shirley?
Mixed bays at a site in Shirley, where some trailers have tail lifts and others do not, may suit a combination of swing-lip and telescopic levellers. Operators in Shirley who have added electric pallet trucks to their fleet may find an existing leveller too short, making a longer platform worth considering.
Fitting out a new warehouse in Shirley with pre-formed pits makes swing-lip levellers a straightforward choice for most general loading from day one.
A single contact at Loading Bay Doors handles your project in Shirley from start to finish. The free site survey and fixed written quote come first, with no obligation to proceed. We then book the installation for times that suit the operation, including out of hours by arrangement, and manage the specialist engineers on site. At the end we commission and test the equipment, walk your team through it and provide the documentation.
Do dock levellers have to be inspected by law?
Yes, dock levellers are work equipment and must be kept in a safe condition and inspected where deterioration could lead to danger. The law and the regulator depend on where the site is.
- Great Britain: the Provision and Use of Work Equipment Regulations 1998 (PUWER), enforced by HSE.
- Northern Ireland: PUWER (Northern Ireland) 1999, enforced by HSENI.
- Inspection interval: engineering insurers commonly inspect dock levellers under PUWER at 12-month intervals.
- LOLER: most levellers are treated as work equipment under PUWER, but one designed or used to lift people may fall under LOLER, or LOLER (Northern Ireland) 1999, with 6-monthly thorough examination. It depends on the equipment and how it is used; your insurer or competent person will confirm.
- Standard: BS EN 1398:2009 sets the safety requirements for dock levellers. It is current and under review.
Our inspection guide explains what an examiner looks at.
How much does a swing-lip dock leveller cost?
A swing-lip dock leveller typically costs £5,200 to £8,800 per leveller, excluding VAT, supply and fit, assuming it goes into an existing, sound pit. New pits, pit repairs, concrete and groundworks are priced separately after survey.
Within that range, the price is driven by:
- Platform length: longer platforms give a gentler gradient but cost more.
- Width and capacity: wider decks and higher load ratings use heavier steel and cylinders.
- Lip length: a longer lip reaches further onto the trailer bed.
- Insulation and sealing: insulated platforms and pit seals for chilled buildings.
- Controls and interlocks: links to the door, restraint or traffic lights.
- Removal and access: taking out the old unit, lifting equipment for delivery and out-of-hours work.
If the pit edge steel is damaged or the pit is out of square, we tell you at survey and price the repair as a separate item, so the leveller price stays clear. The written quote is then the fixed price for the work described.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What do we check at the survey?
- Power supply at each bay, including three-phase availability
- Lighting inside trailers and at the dock face
- Control positions, isolators and any existing interlocks
- Condition of any existing leveller pit, kerb angles and pit drainage
- Wall and steel structure for door, shelter and bumper fixings
- Asbestos register and any other site hazard information
Options to discuss
Interlocked controls
Control panels linked to the dock door, vehicle restraint or traffic lights so the leveller can only be operated when the dock is safe.
Insulated leveller
An insulated platform with perimeter seals around the pit that reduces cold loss through the floor of the bay at chilled and frozen docks.
Which rules apply in England?
Workplace safety in England is regulated by HSE. For a loading bay in Shirley, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.
Questions about swing-lip dock levellers in Shirley
Is the site survey in Shirley free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
Do you remove and dispose of the old equipment?
Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Shirley, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.
Will you deal with building control and planning for a project in Shirley?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
Can a new leveller fit our old pit?
Usually, yes. Levellers are made in standard sizes and many can be supplied to suit an existing pit, but the pit must be square, sound and deep enough. We measure the pit and check the edge steel at survey, and if adjustment or repair is needed we price it separately.
Can a swing-lip leveller be used as a ramp to the yard?
No, a leveller should only be used to bridge a docked trailer. The lip and toe guards are designed to work with a trailer bed in place, and the platform is not built as a ramp down to yard level. Where you need ground-level access, a separate door or a lift table is the safer answer.
Swing-lip dock levellers near Shirley
If your site is not in Shirley itself, it may be near one of these: Solihull (2 miles), Birmingham (6 miles) and Washwood Heath (6 miles). Pick the closest.
Other loading bay services in Shirley
Full guide to swing-lip dock levellers · Everything we do in Shirley
Get in touch about loading bay doors and dock equipment in Shirley: call, email or use the quote tool.
