A swing-lip dock leveller is a hydraulic ramp set into a pit at the dock edge, with a hinged steel lip along its front. When a trailer is docked the platform rises, the lip swings out, and the platform lowers until the lip rests on the trailer bed, forming a bridge for forklifts and pallet trucks. The lip is typically about 400 to 500 mm long.
What matters for swing-lip dock levellers in Hampshire?
Mixed bays at a site in Hampshire, where some trailers have tail lifts and others do not, may suit a combination of swing-lip and telescopic levellers. Fitting out a new warehouse in Hampshire with pre-formed pits makes swing-lip levellers a straightforward choice for most general loading from day one.
Chilled food distributors in Hampshire can specify insulated swing-lip levellers with pit seals to cut cold loss through the floor of the bay.
It starts with a free site survey in Hampshire, where we measure the openings, check the dock and talk through how the bay is used. You then receive a fixed written quote. Once you accept, we manage the job: specialist installation engineers carry out the work under our management, planned around your deliveries, and out-of-hours working can be arranged. At handover we test everything with you and leave the documentation.
How much does a swing-lip dock leveller cost?
A swing-lip dock leveller typically costs £5,200 to £8,800 per leveller, excluding VAT, supply and fit, assuming it goes into an existing, sound pit. New pits, pit repairs, concrete and groundworks are priced separately after survey.
Within that range, the price is driven by:
- Platform length: longer platforms give a gentler gradient but cost more.
- Width and capacity: wider decks and higher load ratings use heavier steel and cylinders.
- Lip length: a longer lip reaches further onto the trailer bed.
- Insulation and sealing: insulated platforms and pit seals for chilled buildings.
- Controls and interlocks: links to the door, restraint or traffic lights.
- Removal and access: taking out the old unit, lifting equipment for delivery and out-of-hours work.
If the pit edge steel is damaged or the pit is out of square, we tell you at survey and price the repair as a separate item, so the leveller price stays clear. The written quote is then the fixed price for the work described.
How long should a dock leveller platform be?
A leveller platform should be long enough to keep the slope gentle across the full range of trailer heights you load, because the steepest gradient decides which handling equipment can use it safely. A longer platform spreads the same height difference over a greater distance.
- Know your trailer mix: with a dock typically around 1,200 mm high and trailer beds ranging from roughly 900 to 1,600 mm, the height difference can be considerable.
- Check your equipment: low-clearance electric pallet trucks cope with less gradient than a counterbalance forklift with good ground clearance.
- Common lengths: platforms are commonly made from around 2 to 3.5 m long, with longer units where trailers sit very low or very high.
- Width: a wider platform gives more room when pallets sit close to the trailer sides.
When replacing a unit, the pit size limits what can be fitted, so we measure the pit and record your trailer heights at survey before recommending a length.
Towns we cover in Hampshire
We take enquiries about swing-lip dock levellers from across Hampshire. These are the towns with their own pages:
- Southampton
- Portsmouth
- Basingstoke
- Gosport
- Waterlooville
- Farnborough
- Eastleigh
- Winchester
- Havant
- Andover
- Fareham
- Aldershot
- Fleet
- Totton
- New Milton
- Bordon
- Hythe
- Yateley
- Alton
- Emsworth
- Hedge End
- Bishopstoke
Budget range for supply and fit. The written quote after a free survey is the fixed price. All guide prices.
What do the rules in England mean for the work?
Lift tables and dock lifts in Hampshire may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.
Questions
What details do you need from us to quote for swing-lip dock levellers?
To get started, send the site address in Hampshire, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.
Is the site survey in Hampshire free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
What happens if a trailer pulls away with the lip on its bed?
The platform drops until its safety system stops it. Hydraulic levellers have a velocity fuse that arrests the fall, but the event can still damage the leveller and endanger anyone on it, which is why dock traffic lights, restraints and key control are used to prevent early drive-away.
Do levellers need a three-phase supply?
Most hydraulic dock levellers use a three-phase supply, although some smaller units run on single phase. When replacing like for like, the existing supply can often be reused if it is in good order. We check the supply at survey and include any electrical work in the quote.