- Location
- Trowbridge, Wiltshire
- Main postcode district
- BA14
- Nearby (straight line)
- Westbury (4 miles), Melksham (5 miles) and Bath (8 miles)
- Survey and quote
- Free, with a fixed written quote
A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.
Where does this fit at a dock in Trowbridge?
Older industrial buildings in Trowbridge built with ground-level doors only can use a scissor lift table to load trailers without excavating the yard. Food, drink and pharmaceutical sites around Trowbridge that need clean, controlled loading points may prefer a lift table with bellows enclosing the scissor mechanism.
Sites in Trowbridge replacing an ageing dock lift should look at its LOLER examination history, as repeated defects can signal that replacement is due.
Any project involving scissor lift tables at a working site in Trowbridge takes planning. We survey free of charge, quote a fixed price in writing, and then agree a programme that keeps as much of the dock running as possible. Specialist installation engineers carry out the work under our management, out of hours if that suits you better. On completion we test each item, show your team how it operates and leave the documentation with you.
Should a dock lift be pit-mounted or surface-mounted?
A pit-mounted dock lift is best where pallet trucks need to roll straight on at ground level, while a surface-mounted lift suits sites where digging a pit is impractical or the lift may move later. Both raise goods to trailer height; the difference is how you get on at the bottom.
- Pit-mounted: the lift sits in a concrete pit so the platform is flush with the yard when lowered. Pallet trucks drive straight on. The pit needs drainage, and forming it is a structural job that may need building control approval.
- Surface-mounted: the lift stands on the existing floor and a short ramp leads on to the platform at its lowest height. No excavation, quicker to install and easier to relocate, but the ramp takes space and can be harder work with heavy loads.
Ground conditions, drainage, available space and the weight of your typical load usually decide it. We set out both options at survey where either would work.
What happens on site when a dock lift is installed?
Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.
- Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
- Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
- Power and controls: the power pack and control station are connected to the supply confirmed at survey.
- Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
- Handover: operators are shown how to use it, and the documents and examination regime are explained.
We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
Survey checklist for your dock
- How drivers are prevented from pulling away too early
- Wind exposure at the dock, which affects door and shelter choice
- Whether planning, building control or a building warrant may be needed
- Temperature requirements for chilled, frozen or ambient goods
- Traffic routes for vehicles and separation of pedestrians
- Yard gradient and the slope of the approach to the dock
Options to discuss
Bridge plate
A hinged plate on the platform end that rests on the trailer bed during loading, bridging the gap so pallet trucks can cross smoothly between lift and trailer.
Guard rails and gates
Fixed rails and gated sides around the platform, arranged to suit the goods and how operators and pallet trucks move on and off the lift.
Planning, building control and safety law in England
Workplace safety in England is regulated by HSE. For a loading bay in Trowbridge, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.
Questions about scissor lift tables in Trowbridge
Will you deal with building control and planning for a project in Trowbridge?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
How long does installation take at a site in Trowbridge?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
Do you remove and dispose of the old equipment?
Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Trowbridge, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.
Can people ride on a dock lift?
Some lift tables are designed to carry an operator with the load, and others are for goods only. If the lift carries people, LOLER thorough examinations are typically needed every 6 months rather than every 12, unless a written examination scheme sets a different interval. Your insurer or competent person will confirm.
Does a scissor lift table need a pit?
No, a scissor lift table does not always need a pit. Surface-mounted lifts stand on the existing floor with a short ramp at the bottom. A pit lets the platform sit flush with the yard so pallet trucks roll straight on, which suits frequent or heavy loading. We recommend one or the other at survey.
Scissor lift tables near Trowbridge
If your site is not in Trowbridge itself, it may be near one of these: Westbury (4 miles), Melksham (5 miles) and Bath (8 miles). Pick the closest.
Other loading bay services in Trowbridge
Full guide to scissor lift tables · Everything we do in Trowbridge
If a loading bay in Trowbridge needs attention, call us or send photos and details online.