Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Westbury

Scissor lift tables in Westbury

Enquiries about scissor lift tables from Westbury go straight to our team, who will ask a few practical questions about the bay before arranging the next step with you.

Guide £9,500–£28,000 per lift ex VATFree site surveyBA13
Location
Westbury, Wiltshire
Main postcode district
BA13
Nearby (straight line)
Warminster (4 miles), Trowbridge (4 miles) and Frome (6 miles)
Survey and quote
Free, with a fixed written quote
Scissor lift tables, in short

A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.

Is this right for your site in Westbury?

Businesses in Westbury receiving both vans and articulated trailers through one doorway can use a lift table to serve every bed height from the same opening. Older industrial buildings in Westbury built with ground-level doors only can use a scissor lift table to load trailers without excavating the yard.

Each lift table enquiry from Westbury is surveyed and quoted in the same way as any other UK site, with groundworks for a pit priced separately.

How does an installation in Westbury work? First, a free, no-obligation survey to measure up and understand the operation. Next, a fixed written quote. Then a programme agreed with you, so the work fits around deliveries, with out-of-hours slots if needed. The installation itself is carried out by specialist engineers who answer to us, and it finishes with testing, a walk-through for your staff and a handover pack.

Should a dock lift be pit-mounted or surface-mounted?

A pit-mounted dock lift is best where pallet trucks need to roll straight on at ground level, while a surface-mounted lift suits sites where digging a pit is impractical or the lift may move later. Both raise goods to trailer height; the difference is how you get on at the bottom.

  • Pit-mounted: the lift sits in a concrete pit so the platform is flush with the yard when lowered. Pallet trucks drive straight on. The pit needs drainage, and forming it is a structural job that may need building control approval.
  • Surface-mounted: the lift stands on the existing floor and a short ramp leads on to the platform at its lowest height. No excavation, quicker to install and easier to relocate, but the ramp takes space and can be harder work with heavy loads.

Ground conditions, drainage, available space and the weight of your typical load usually decide it. We set out both options at survey where either would work.

What happens on site when a dock lift is installed?

Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.

  1. Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
  2. Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
  3. Power and controls: the power pack and control station are connected to the supply confirmed at survey.
  4. Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
  5. Handover: operators are shown how to use it, and the documents and examination regime are explained.

We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.

Guide price, Westbury
£9,500–£28,000 per lift, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What does the free survey cover?

  • Working hours, shift patterns and windows for out-of-hours work
  • Clear opening width and height for each door
  • Scope to convert ground-level doors into docks or add lift tables
  • Access for deliveries, cranes or lifting equipment during installation
  • Yard gradient and the slope of the approach to the dock
  • Control positions, isolators and any existing interlocks

Options to discuss

Guard rails and gates

Fixed rails and gated sides around the platform, arranged to suit the goods and how operators and pallet trucks move on and off the lift.

Bridge plate

A hinged plate on the platform end that rests on the trailer bed during loading, bridging the gap so pallet trucks can cross smoothly between lift and trailer.

What do the rules in England mean for the work?

Sites in Westbury fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.

Questions about scissor lift tables in Westbury

Can you work outside our normal operating hours in Westbury?

Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.

Do you remove and dispose of the old equipment?

Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Westbury, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.

Is VAT included in your guide prices for scissor lift tables?

No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Wiltshire as everywhere else: for scissor lift tables, it is £9,500 to £28,000 per lift, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.

Can people ride on a dock lift?

Some lift tables are designed to carry an operator with the load, and others are for goods only. If the lift carries people, LOLER thorough examinations are typically needed every 6 months rather than every 12, unless a written examination scheme sets a different interval. Your insurer or competent person will confirm.

What capacity of dock lift do I need?

A dock lift needs a capacity above the heaviest combined load it will carry, including the goods, the pallet truck and an operator if they ride on it. Loading bay lifts are typically rated somewhere between 2,000 and 6,000 kg. We work out the right rating from your loads at survey.

Scissor lift tables near Westbury

Looking beyond Westbury? Our pages for Warminster (4 miles), Trowbridge (4 miles) and Frome (6 miles) describe the same loading bay services and how to get in touch.

Other loading bay services in Westbury

Full guide to scissor lift tables · Everything we do in Westbury

For a written price on loading bay work in Westbury, request a quote and include photos of the bay if you can.

Call freeGet a quote