- Location
- Accrington, Lancashire
- Main postcode district
- BB5
- Nearby (straight line)
- Haslingden (4 miles), Rawtenstall (5 miles) and Blackburn (5 miles)
- Survey and quote
- Free, with a fixed written quote
A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.
Why do sites in Accrington choose this?
Split-level buildings near Accrington sometimes use scissor lift tables internally to move pallets between floor levels without relying on forklifts and ramps. Older industrial buildings in Accrington built with ground-level doors only can use a scissor lift table to load trailers without excavating the yard.
Businesses in Accrington receiving both vans and articulated trailers through one doorway can use a lift table to serve every bed height from the same opening.
Any project involving scissor lift tables at a working site in Accrington takes planning. We survey free of charge, quote a fixed price in writing, and then agree a programme that keeps as much of the dock running as possible. Specialist installation engineers carry out the work under our management, out of hours if that suits you better. On completion we test each item, show your team how it operates and leave the documentation with you.
Should a dock lift be pit-mounted or surface-mounted?
A pit-mounted dock lift is best where pallet trucks need to roll straight on at ground level, while a surface-mounted lift suits sites where digging a pit is impractical or the lift may move later. Both raise goods to trailer height; the difference is how you get on at the bottom.
- Pit-mounted: the lift sits in a concrete pit so the platform is flush with the yard when lowered. Pallet trucks drive straight on. The pit needs drainage, and forming it is a structural job that may need building control approval.
- Surface-mounted: the lift stands on the existing floor and a short ramp leads on to the platform at its lowest height. No excavation, quicker to install and easier to relocate, but the ramp takes space and can be harder work with heavy loads.
Ground conditions, drainage, available space and the weight of your typical load usually decide it. We set out both options at survey where either would work.
What happens on site when a dock lift is installed?
Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.
- Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
- Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
- Power and controls: the power pack and control station are connected to the supply confirmed at survey.
- Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
- Handover: operators are shown how to use it, and the documents and examination regime are explained.
We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
Survey checklist for your dock
- Headroom above the opening and which track type will suit it
- Wheel guide positions and yard markings for reversing vehicles
- Scope to convert ground-level doors into docks or add lift tables
- Bumper position and wear or damage on the dock face
- Forklift and pallet truck loads crossing the leveller platform
- How often each door cycles during a typical shift
Options to discuss
Guard rails and gates
Fixed rails and gated sides around the platform, arranged to suit the goods and how operators and pallet trucks move on and off the lift.
Safety bellows and skirts
A flexible enclosure around the scissor mechanism that keeps hands, feet and debris out of shear and crush points, and helps keep the mechanism clean.
Which rules apply in England?
Lift tables and dock lifts in Accrington may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.
Questions about scissor lift tables in Accrington
Is VAT included in your guide prices for scissor lift tables?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Lancashire as everywhere else: for scissor lift tables, it is £9,500 to £28,000 per lift, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
Can you work outside our normal operating hours in Accrington?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
What warranty comes with new loading bay equipment?
New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Accrington site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.
Can people ride on a dock lift?
Some lift tables are designed to carry an operator with the load, and others are for goods only. If the lift carries people, LOLER thorough examinations are typically needed every 6 months rather than every 12, unless a written examination scheme sets a different interval. Your insurer or competent person will confirm.
Can a scissor lift table be installed outdoors?
Yes, scissor lift tables are often installed outdoors at the loading door. Outdoor lifts need a drained pit or a suitable base, weather-resistant finishes and controls, and sometimes a canopy over the loading area. A canopy is an external structure that may need planning permission, which we check at survey.
Scissor lift tables near Accrington
The same survey, quote and repair service is available in towns around Accrington, such as Haslingden (4 miles), Rawtenstall (5 miles) and Blackburn (5 miles).
Other loading bay services in Accrington
Full guide to scissor lift tables · Everything we do in Accrington
Request a quote for your loading bay in Accrington, attaching photos of the dock, the equipment and any damage.