Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Accrington

Loading houses in Accrington

For operators in Accrington thinking about loading houses, the starting point is a conversation about the site, the vehicles you load and how the bay is used day to day.

Guide £14,500–£32,000 per house ex VATFree site surveyBB5
Location
Accrington, Lancashire
Main postcode district
BB5
Nearby (straight line)
Haslingden (4 miles), Rawtenstall (5 miles) and Blackburn (5 miles)
Survey and quote
Free, with a fixed written quote
Loading houses, in short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

Why do sites in Accrington choose this?

Developers bringing forward industrial units in Accrington can specify loading houses at design stage, keeping the internal slab clear for whichever tenant takes the unit. Any loading house proposed in Accrington needs its planning and building control position checked, which we look at during the site survey before quoting.

Manufacturing businesses around Accrington adding a dock to an existing building often find a loading house less disruptive than breaking out the slab inside.

We never ask you to commit before you have a fixed price. A free survey at your Accrington site comes first, followed by a written quote. When the order goes ahead, we plan the installation around your operation, book any out-of-hours working you need and manage the specialist installation engineers on site. The job ends with a full test, a run-through for the people who will use the equipment and a set of handover documents.

Does a loading house need planning permission or building approval?

A loading house can need planning permission, because it is a new external structure, so we check this at survey rather than assuming it is not needed. The answer depends on the site, the size of the house and any planning conditions already on the building.

Forming a new opening in the building wall is a structural alteration that may need approval. In England and Wales that means Building Regulations approval, in Scotland a building warrant, and in Northern Ireland building control approval.

Energy rules can also apply to the door in the building wall. In England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. Wales, Scotland and Northern Ireland have their own energy rules, and we confirm the figure that applies to your nation and project.

The leveller inside the house is specified to BS EN 1398:2009, the dock leveller safety standard. Our guide to loading houses explained goes through the approvals in more detail.

Can a loading house be added to an existing building?

Yes, loading houses are often added to existing buildings, provided the floor is at or near dock height and the wall can take a suitable opening. Adding docks without breaking out the floor is one of the main reasons operators choose them.

At survey we check:

  • the floor height inside against the yard level outside;
  • whether an existing door opening can be used, or a new one formed in the cladding or masonry;
  • drains, ducts and other buried services where foundations will go;
  • the space trailers need to manoeuvre, and whether an angled house would work better;
  • any planning or building control approval the project may need.

Where the existing door is in good condition and suits the new layout, it can sometimes be kept. If your building has floors at yard level, a wider loading bay conversion may be the better route.

Guide price, Accrington
£14,500–£32,000 per house, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What does the free survey cover?

  • Condition of any existing leveller pit, kerb angles and pit drainage
  • Age and condition of the equipment already in place
  • Drainage on recessed or sloping dock approaches
  • How drivers are prevented from pulling away too early
  • Wall and steel structure for door, shelter and bumper fixings
  • Working hours, shift patterns and windows for out-of-hours work

Options to discuss

Straight loading house

Set square to the building wall, the simplest layout where the yard has room for trailers to reverse straight in. Usually the most economical arrangement for one or more bays.

Shelter or seal front

A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.

Planning, building control and safety law in England

Sites in Accrington fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.

Questions about loading houses in Accrington

Which building and safety rules apply to a site in Accrington?

It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Accrington, we check what applies at survey and design to it.

How long does installation take at a site in Accrington?

It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.

Do you remove and dispose of the old equipment?

Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Accrington, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.

Can a loading house be used for a cold store?

Yes. Loading houses suit chilled and frozen operations because the building door closes at the wall line, keeping the cold space sealed when no trailer is docked. The panels, door and shelter or seal are specified to suit the temperatures involved, which we confirm at survey.

Does a loading house need planning permission?

A loading house can need planning permission because it is a new external structure, and we check this at survey for every project. Forming a new opening in the wall may also need Building Regulations approval, a building warrant in Scotland or building control approval in Northern Ireland, depending on where the site is.

Loading houses near Accrington

Distances are measured from Accrington. Nearby towns we cover include Haslingden (4 miles), Rawtenstall (5 miles) and Blackburn (5 miles), and other towns in the area are covered too.

Other loading bay services in Accrington

Full guide to loading houses · Everything we do in Accrington

Whether it is a new bay or a fault on an existing one, call us or request a quote for your site in Accrington.

Call freeGet a quote