Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Hertford

Scissor lift tables in Hertford

Getting scissor lift tables right at a working dock in Hertford means thinking about the vehicles, the goods, the shift pattern and the people who use the bay.

Guide £9,500–£28,000 per lift ex VATFree site surveySG13
Location
Hertford, Hertfordshire
Main postcode district
SG13
Nearby (straight line)
Ware (2 miles), Hoddesdon (4 miles) and Welwyn Garden City (6 miles)
Survey and quote
Free, with a fixed written quote
Scissor lift tables, in short

A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.

What matters for scissor lift tables in Hertford?

Food, drink and pharmaceutical sites around Hertford that need clean, controlled loading points may prefer a lift table with bellows enclosing the scissor mechanism. Businesses in Hertford receiving both vans and articulated trailers through one doorway can use a lift table to serve every bed height from the same opening.

Where ground conditions in Hertford make a deep recessed dock costly, a pit-mounted or surface-mounted lift table can be the more practical option.

Step one is a survey at your site in Hertford, which costs nothing and carries no obligation. Step two is a written quote with a fixed price and a clear scope. Step three is installation, scheduled around your operation and carried out by specialist installation engineers working under our management, including evenings or weekends if agreed. Step four is handover, when the equipment is tested in front of you and the paperwork is passed over.

Should a dock lift be pit-mounted or surface-mounted?

A pit-mounted dock lift is best where pallet trucks need to roll straight on at ground level, while a surface-mounted lift suits sites where digging a pit is impractical or the lift may move later. Both raise goods to trailer height; the difference is how you get on at the bottom.

  • Pit-mounted: the lift sits in a concrete pit so the platform is flush with the yard when lowered. Pallet trucks drive straight on. The pit needs drainage, and forming it is a structural job that may need building control approval.
  • Surface-mounted: the lift stands on the existing floor and a short ramp leads on to the platform at its lowest height. No excavation, quicker to install and easier to relocate, but the ramp takes space and can be harder work with heavy loads.

Ground conditions, drainage, available space and the weight of your typical load usually decide it. We set out both options at survey where either would work.

How much does a scissor lift table cost?

A scissor lift table for a loading bay typically costs £9,500 to £28,000 per lift, supplied and installed, excluding VAT. Smaller surface-mounted lifts sit towards the lower end; large, high-capacity pit lifts with gates and bridge plates sit towards the top.

What moves the price:

  • Capacity: dock lifts are typically rated somewhere between 2,000 and 6,000 kg, and heavier ratings need a stronger mechanism.
  • Platform size and travel: larger platforms and greater lift heights cost more.
  • Mounting: pit-mounted or surface-mounted with a ramp.
  • Safety equipment: bellows or skirts, toe guards, rails, gates and bridge plates.
  • Electrics and access: supply to the power pack, delivery access and out-of-hours working.

Forming a pit, drainage and other groundworks are priced separately after survey. Following a free site survey, the written quote is the fixed price. VAT is added at the standard rate.

Guide price, Hertford
£9,500–£28,000 per lift, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What we look at on site

  • Wheel guide positions and yard markings for reversing vehicles
  • Clear opening width and height for each door
  • Access for deliveries, cranes or lifting equipment during installation
  • How drivers are prevented from pulling away too early
  • Headroom above the opening and which track type will suit it
  • Condition of any existing leveller pit, kerb angles and pit drainage

Options to discuss

Guard rails and gates

Fixed rails and gated sides around the platform, arranged to suit the goods and how operators and pallet trucks move on and off the lift.

Safety bellows and skirts

A flexible enclosure around the scissor mechanism that keeps hands, feet and debris out of shear and crush points, and helps keep the mechanism clean.

What do the rules in England mean for the work?

Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Hertford. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.

Questions about scissor lift tables in Hertford

What warranty comes with new loading bay equipment?

New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Hertford site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.

Can you work outside our normal operating hours in Hertford?

Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.

Will you deal with building control and planning for a project in Hertford?

We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.

How often does a lift table need servicing?

A lift table needs routine maintenance as well as its LOLER thorough examinations. Many sites combine the two so the lift is serviced shortly before each examination. The right maintenance frequency depends on how heavily the lift is used, and we agree it with you at handover.

Can a forklift drive on to a scissor lift table?

Only if the lift has been designed and rated for forklift traffic. Most loading bay lift tables are built for pallet trucks, and a forklift's weight and wheel loads need a much heavier platform and mechanism. Tell us how you load at survey so the lift is specified correctly.

Scissor lift tables near Hertford

Businesses outside Hertford may find their nearest town in this list: Ware (2 miles), Hoddesdon (4 miles) and Welwyn Garden City (6 miles). Each page covers doors, docks, repairs and servicing.

Other loading bay services in Hertford

Full guide to scissor lift tables · Everything we do in Hertford

Whether it is a new bay or a fault on an existing one, call us or request a quote for your site in Hertford.

Call freeGet a quote