Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Ware

Scissor lift tables in Ware

Businesses in Ware and the rest of Hertfordshire can come to us for scissor lift tables, with one point of contact who stays with the job from first enquiry to sign-off.

Guide £9,500–£28,000 per lift ex VATFree site surveySG12
Location
Ware, Hertfordshire
Main postcode district
SG12
Nearby (straight line)
Hertford (2 miles), Hoddesdon (3 miles) and Harlow (6 miles)
Survey and quote
Free, with a fixed written quote
Scissor lift tables, in short

A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.

What matters for scissor lift tables in Ware?

Split-level buildings near Ware sometimes use scissor lift tables internally to move pallets between floor levels without relying on forklifts and ramps. Businesses in Ware receiving both vans and articulated trailers through one doorway can use a lift table to serve every bed height from the same opening.

Food, drink and pharmaceutical sites around Ware that need clean, controlled loading points may prefer a lift table with bellows enclosing the scissor mechanism.

It starts with a free site survey in Ware, where we measure the openings, check the dock and talk through how the bay is used. You then receive a fixed written quote. Once you accept, we manage the job: specialist installation engineers carry out the work under our management, planned around your deliveries, and out-of-hours working can be arranged. At handover we test everything with you and leave the documentation.

What happens on site when a dock lift is installed?

Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.

  1. Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
  2. Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
  3. Power and controls: the power pack and control station are connected to the supply confirmed at survey.
  4. Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
  5. Handover: operators are shown how to use it, and the documents and examination regime are explained.

We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.

What safety features should a loading bay lift table have?

A loading bay lift table should protect people from the scissor mechanism, stop if anything is trapped under the platform, and stop people or loads falling from the edges. Lift tables are specified to BS EN 1570-1:2024, and common features include:

  • Toe guards: trip bars or sensitive edges around the platform underside that stop the lift descending on contact.
  • Safety bellows or skirts: a flexible enclosure that keeps hands, feet and debris out of shear and crush points.
  • Guard rails and gates: on open sides, sized to how people and pallet trucks move on and off.
  • Bridge plate: a hinged plate that rests on the trailer bed to bridge the gap.
  • Hold-to-run controls: the lift only moves while the button is held, with a stop button within reach.
  • Hydraulic protection: valves that stop the platform dropping if a hose fails.
  • Maintenance props: supports that hold the platform up safely during servicing.
Guide price, Ware
£9,500–£28,000 per lift, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What do we check at the survey?

  • Condition of any existing leveller pit, kerb angles and pit drainage
  • Wheel guide positions and yard markings for reversing vehicles
  • Lighting inside trailers and at the dock face
  • Traffic routes for vehicles and separation of pedestrians
  • Age and condition of the equipment already in place
  • Temperature requirements for chilled, frozen or ambient goods

Options to discuss

Pit-mounted dock lift

Set in a concrete pit so the platform lowers flush with the yard, letting pallet trucks drive straight on. The best choice for frequent, heavy loading at a fixed door.

Guard rails and gates

Fixed rails and gated sides around the platform, arranged to suit the goods and how operators and pallet trucks move on and off the lift.

Which rules apply in England?

Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Ware. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.

Questions about scissor lift tables in Ware

What warranty comes with new loading bay equipment?

New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Ware site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.

How long does installation take at a site in Ware?

It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.

Do you remove and dispose of the old equipment?

Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Ware, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.

Can a forklift drive on to a scissor lift table?

Only if the lift has been designed and rated for forklift traffic. Most loading bay lift tables are built for pallet trucks, and a forklift's weight and wheel loads need a much heavier platform and mechanism. Tell us how you load at survey so the lift is specified correctly.

Can a scissor lift table be installed outdoors?

Yes, scissor lift tables are often installed outdoors at the loading door. Outdoor lifts need a drained pit or a suitable base, weather-resistant finishes and controls, and sometimes a canopy over the loading area. A canopy is an external structure that may need planning permission, which we check at survey.

Scissor lift tables near Ware

Distances are measured from Ware. Nearby towns we cover include Hertford (2 miles), Hoddesdon (3 miles) and Harlow (6 miles), and other towns in the area are covered too.

Other loading bay services in Ware

Full guide to scissor lift tables · Everything we do in Ware

For a written price on loading bay work in Ware, request a quote and include photos of the bay if you can.

Call freeGet a quote