- Location
- Hertford, Hertfordshire
- Main postcode district
- SG13
- Nearby (straight line)
- Ware (2 miles), Hoddesdon (4 miles) and Welwyn Garden City (6 miles)
- Survey and quote
- Free, with a fixed written quote
An edge-of-dock leveller is a compact leveller mounted on the front face or top edge of a loading dock, with no pit needed. A short hinged plate and lip bridge the gap between dock and trailer, but it can only cover a small height difference above and below dock level, so it suits sites where trailer bed heights are consistent.
How does this suit sites in Hertford?
Exposed external docks in Hertford call for a galvanised or well-painted edge-of-dock leveller that stands up to the weather all year round. Smaller distribution units in Hertford without dock pits can add a practical loading position with an edge-of-dock leveller fixed straight to the dock face.
On older buildings in Hertford where drains or services run close to the dock, avoiding a pit can make an edge-of-dock leveller the sensible route.
The survey is free, the quote is written and the price is fixed: that is how every installation in Hertford begins. We then manage the work from start to finish. Fitting is carried out by specialist installers under our management, phased so the operation keeps moving, and nights or weekends can be booked by arrangement. On the final day we test the equipment with you and hand over the operating and maintenance information.
Should I choose a mechanical or hydraulic edge-of-dock leveller?
Choose a mechanical edge-of-dock leveller for occasional use and simple sites, and a hydraulic one where the bay is busy or operators need push-button control. Both bridge a similar small height range.
- Mechanical: the operator pulls a lever or handle and the lip lifts and drops onto the bed with spring assistance. No power is needed and there is little to go wrong, but it takes some physical effort.
- Hydraulic: a push button raises the plate and extends the lip, then lowers it onto the trailer. It is easier and quicker for frequent use and can be interlocked with the dock door and traffic lights.
Other choices include plate width, which should suit the wheel track of your pallet trucks and forklifts, and capacity, which must cover the truck and its heaviest load. On exposed external docks, a galvanised or well-painted finish helps the unit cope with rain, frost and road salt.
How is an edge-of-dock leveller fitted to an existing dock?
An edge-of-dock leveller is fixed to the front face or top edge of the dock from the yard side, and installation usually takes around half a day to a day per bay. No digging is involved.
- The dock face is inspected, and damaged concrete or worn edge steel is repaired or replaced first if needed.
- The leveller is positioned centrally on the door opening and bolted or welded in place.
- Bumpers are fitted or repositioned so trailers stop at the right distance from the plate.
- On hydraulic units, the power pack and controls are connected.
- The leveller is tested across its working range.
You will need to keep the yard approach to the bay clear, take the bay out of use and, for hydraulic units, provide a power supply near the door or ask us to include one. Because the work is outside, very wet or freezing weather can affect welding and fixing, so we keep the date flexible where we can.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
Survey checklist for your dock
- Wheel guide positions and yard markings for reversing vehicles
- Bumper position and wear or damage on the dock face
- Wind exposure at the dock, which affects door and shelter choice
- Lighting inside trailers and at the dock face
- Traffic routes for vehicles and separation of pedestrians
- How drivers are prevented from pulling away too early
Options to discuss
Hydraulic edge-of-dock leveller
Push-button operation with a compact power pack, easier for frequent use and able to be interlocked with dock doors and traffic lights.
New edge steel and bumpers
A replacement steel edge angle and correctly positioned bumpers to give a sound fixing and protect the leveller from trailer impact.
Regulations and approvals in England
Lift tables and dock lifts in Hertford may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.
Questions about edge-of-dock levellers in Hertford
How do you price edge-of-dock levellers for a site in Hertford?
Guide budgets for supply and fit are £1,800 to £4,400 per leveller, excluding VAT. The figure moves with size, insulation, the operator, electrics, access, any pit or groundworks and out-of-hours working. Where levellers are involved, the guide assumes an existing, sound pit. After the free survey you receive a fixed written quote, and that is the price for the agreed scope.
Is the site survey in Hertford free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
Can you work outside our normal operating hours in Hertford?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
Is an edge-of-dock leveller better than a loose dock plate?
For regular use, usually yes. A fixed edge-of-dock leveller cannot slide out of position or be dropped, and it does not need carrying between bays. Loose plates still have a place for occasional use, but they bring handling and slipping risks that a fixed unit avoids.
How long does an edge-of-dock leveller take to install?
Usually half a day to a day per bay, as there is no pit to form. Concrete or edge steel repairs add time, and hydraulic units also need connecting to power. We plan the work so the rest of the dock keeps operating while each bay is fitted.
Edge-of-dock levellers near Hertford
Close neighbours of Hertford with their own pages here: Ware (2 miles), Hoddesdon (4 miles) and Welwyn Garden City (6 miles). Choose one to see coverage details for that town.
Other loading bay services in Hertford
Full guide to edge-of-dock levellers · Everything we do in Hertford
Whether it is a new bay or a fault on an existing one, call us or request a quote for your site in Hertford.
