Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Alton

Scissor lift tables in Alton

If your site in Alton needs scissor lift tables, we can help, whether the dock serves a cold store, a parcel operation, a food factory or a trade counter.

Guide £9,500–£28,000 per lift ex VATFree site surveyGU34
Location
Alton, Hampshire
Main postcode district
GU34
Nearby (straight line)
Bordon (5 miles), Farnham (9 miles) and Basingstoke (9 miles)
Survey and quote
Free, with a fixed written quote
Scissor lift tables, in short

A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.

How does this suit sites in Alton?

Each lift table enquiry from Alton is surveyed and quoted in the same way as any other UK site, with groundworks for a pit priced separately. Sites in Alton replacing an ageing dock lift should look at its LOLER examination history, as repeated defects can signal that replacement is due.

Split-level buildings near Alton sometimes use scissor lift tables internally to move pallets between floor levels without relying on forklifts and ramps.

Here is what happens after you contact us about a site in Alton. We arrange a free survey, measure up and send a fixed written quote. If you go ahead, we manage the whole job, including ordering, delivery and coordination with your site team. Specialist installation engineers working under our management do the fitting, at times built around your loading schedule, with out-of-hours work by arrangement. Testing and handover documents close the job.

What happens on site when a dock lift is installed?

Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.

  1. Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
  2. Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
  3. Power and controls: the power pack and control station are connected to the supply confirmed at survey.
  4. Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
  5. Handover: operators are shown how to use it, and the documents and examination regime are explained.

We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.

What safety features should a loading bay lift table have?

A loading bay lift table should protect people from the scissor mechanism, stop if anything is trapped under the platform, and stop people or loads falling from the edges. Lift tables are specified to BS EN 1570-1:2024, and common features include:

  • Toe guards: trip bars or sensitive edges around the platform underside that stop the lift descending on contact.
  • Safety bellows or skirts: a flexible enclosure that keeps hands, feet and debris out of shear and crush points.
  • Guard rails and gates: on open sides, sized to how people and pallet trucks move on and off.
  • Bridge plate: a hinged plate that rests on the trailer bed to bridge the gap.
  • Hold-to-run controls: the lift only moves while the button is held, with a stop button within reach.
  • Hydraulic protection: valves that stop the platform dropping if a hose fails.
  • Maintenance props: supports that hold the platform up safely during servicing.
Guide price, Alton
£9,500–£28,000 per lift, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What we look at on site

  • Control positions, isolators and any existing interlocks
  • Bumper position and wear or damage on the dock face
  • Temperature requirements for chilled, frozen or ambient goods
  • Working hours, shift patterns and windows for out-of-hours work
  • Power supply at each bay, including three-phase availability
  • How often each door cycles during a typical shift

Options to discuss

Surface-mounted lift table

Stands on the existing floor with a short ramp on to the platform at its lowest height. No excavation, a quicker install and easier to relocate later.

Guard rails and gates

Fixed rails and gated sides around the platform, arranged to suit the goods and how operators and pallet trucks move on and off the lift.

Regulations and approvals in England

Sites in Alton fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.

Questions about scissor lift tables in Alton

Is VAT included in your guide prices for scissor lift tables?

No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Hampshire as everywhere else: for scissor lift tables, it is £9,500 to £28,000 per lift, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.

Is the site survey in Alton free?

Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.

What warranty comes with new loading bay equipment?

New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Alton site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.

Can a forklift drive on to a scissor lift table?

Only if the lift has been designed and rated for forklift traffic. Most loading bay lift tables are built for pallet trucks, and a forklift's weight and wheel loads need a much heavier platform and mechanism. Tell us how you load at survey so the lift is specified correctly.

Does a scissor lift table need a pit?

No, a scissor lift table does not always need a pit. Surface-mounted lifts stand on the existing floor with a short ramp at the bottom. A pit lets the platform sit flush with the yard so pallet trucks roll straight on, which suits frequent or heavy loading. We recommend one or the other at survey.

Scissor lift tables near Alton

Sites close to Alton get the same service, including those in Bordon (5 miles), Farnham (9 miles) and Basingstoke (9 miles), with every job run the same way.

Other loading bay services in Alton

Full guide to scissor lift tables · Everything we do in Alton

Get in touch about loading bay doors and dock equipment in Alton: call, email or use the quote tool.

Call freeGet a quote