- Location
- Fleet, Hampshire
- Main postcode districts
- GU51 and GU52
- Nearby (straight line)
- Farnborough (3 miles), Aldershot (4 miles) and Yateley (4 miles)
- Survey and quote
- Free, with a fixed written quote
A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.
How does this suit sites in Fleet?
Each lift table enquiry from Fleet is surveyed and quoted in the same way as any other UK site, with groundworks for a pit priced separately. Older industrial buildings in Fleet built with ground-level doors only can use a scissor lift table to load trailers without excavating the yard.
Food, drink and pharmaceutical sites around Fleet that need clean, controlled loading points may prefer a lift table with bellows enclosing the scissor mechanism.
It starts with a free site survey in Fleet, where we measure the openings, check the dock and talk through how the bay is used. You then receive a fixed written quote. Once you accept, we manage the job: specialist installation engineers carry out the work under our management, planned around your deliveries, and out-of-hours working can be arranged. At handover we test everything with you and leave the documentation.
What inspections does a scissor lift table need under LOLER?
A scissor lift table is lifting equipment, so it needs a thorough examination under the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) at least every 12 months. If it lifts people, such as an operator riding with a pallet truck, the interval is every 6 months, unless a competent person draws up a written examination scheme instead. Which applies depends on the equipment and how it is used; your insurer or competent person will confirm.
In Northern Ireland the equivalent is LOLER (Northern Ireland) 1999, and the regulator is HSENI rather than HSE.
Thorough examination is separate from routine maintenance. The lift is also work equipment under PUWER, so it must be maintained in a safe condition between examinations.
We specify lift tables to BS EN 1570-1:2024, the current safety standard for lifting tables, and explain the examination regime at handover. Planned loading bay servicing can be arranged to fit around the examination dates.
What happens on site when a dock lift is installed?
Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.
- Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
- Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
- Power and controls: the power pack and control station are connected to the supply confirmed at survey.
- Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
- Handover: operators are shown how to use it, and the documents and examination regime are explained.
We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- Scope to convert ground-level doors into docks or add lift tables
- Wind exposure at the dock, which affects door and shelter choice
- Access for deliveries, cranes or lifting equipment during installation
- How often each door cycles during a typical shift
- Asbestos register and any other site hazard information
- Headroom above the opening and which track type will suit it
Options to discuss
Surface-mounted lift table
Stands on the existing floor with a short ramp on to the platform at its lowest height. No excavation, a quicker install and easier to relocate later.
Safety bellows and skirts
A flexible enclosure around the scissor mechanism that keeps hands, feet and debris out of shear and crush points, and helps keep the mechanism clean.
Regulations and approvals in England
Lift tables and dock lifts in Fleet may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.
Questions about scissor lift tables in Fleet
Is VAT included in your guide prices for scissor lift tables?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Hampshire as everywhere else: for scissor lift tables, it is £9,500 to £28,000 per lift, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
Do you cover Fleet for scissor lift tables?
Yes. We take on scissor lift tables for businesses in Fleet and across Hampshire. We survey the site, provide a fixed written quote and manage the installation, with specialist installation engineers working under our management. Visits are arranged in advance at a time that suits your operation, and the same single contact stays with the job through to handover.
Will you deal with building control and planning for a project in Fleet?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
What capacity of dock lift do I need?
A dock lift needs a capacity above the heaviest combined load it will carry, including the goods, the pallet truck and an operator if they ride on it. Loading bay lifts are typically rated somewhere between 2,000 and 6,000 kg. We work out the right rating from your loads at survey.
Does a scissor lift table need a pit?
No, a scissor lift table does not always need a pit. Surface-mounted lifts stand on the existing floor with a short ramp at the bottom. A pit lets the platform sit flush with the yard so pallet trucks roll straight on, which suits frequent or heavy loading. We recommend one or the other at survey.
Scissor lift tables near Fleet
We also cover towns near Fleet, including Farnborough (3 miles), Aldershot (4 miles) and Yateley (4 miles). Each has its own page with the same services and process.
Other loading bay services in Fleet
Full guide to scissor lift tables · Everything we do in Fleet
For a written price on loading bay work in Fleet, request a quote and include photos of the bay if you can.
