- Location
- Brighton, East Sussex
- Main postcode district
- BN2
- Nearby (straight line)
- Hove (1 mile), Portslade (3 miles) and Rottingdean (4 miles)
- Survey and quote
- Free, with a fixed written quote
An inflatable dock shelter is a dock shelter with air-filled fabric cushions at the top and sides of the opening, kept deflated and close to the building until a trailer has reversed in. A fan then inflates the cushions so they press against the trailer roof and sides, giving a close seal that adapts to different trailer widths and heights, and deflates again before the trailer leaves.
Where does this fit at a dock in Brighton?
Specifying a new temperature-controlled warehouse in Brighton is the ideal time to design inflatable shelters in with the doors and levellers, so controls are integrated from the start. Operators replacing foam seals in Brighton that keep wearing out against ill-fitting trailers may find an inflatable shelter suffers far less rubbing.
Pharmaceutical distributors around Brighton working to tight temperature limits may want the close seal an inflatable shelter gives during every load.
We never ask you to commit before you have a fixed price. A free survey at your Brighton site comes first, followed by a written quote. When the order goes ahead, we plan the installation around your operation, book any out-of-hours working you need and manage the specialist installation engineers on site. The job ends with a full test, a run-through for the people who will use the equipment and a set of handover documents.
How much does an inflatable dock shelter cost?
An inflatable dock shelter typically costs £6,800 to £12,800 per shelter, excluding VAT, supply and fit. It costs more than a curtain shelter or foam seal because of its cushions, fan and controls, and the closer seal it gives.
Costs are driven mainly by:
- Size: door width and height, and the range of trailers to be sealed.
- Cushion layout: a top cushion only, or top and side cushions.
- Fan and controls: standalone push-button control or full integration with the door, leveller and restraint.
- Frame and covers: the steel frame and any protective outer curtains.
- Cold store features: insulated frames or heating where ice is a concern.
- Site work: wall fixings, power supply, powered access equipment and removal of an old shelter or seal.
We fix the price in the written quote after a free site survey, which also confirms whether your trailer range suits an inflatable shelter.
What is involved in installing an inflatable dock shelter?
Installing an inflatable shelter involves fixing a steel frame to the building around the dock door, mounting the cushions and fan, and wiring the controls, usually over one to two days per bay.
- The wall is checked and fixing points or a subframe prepared.
- The frame is fixed from powered access equipment in the yard.
- Top and side cushions are fitted, with protective covers where specified.
- The fan unit is mounted and the control panel wired, including interlocks to the door, leveller or restraint.
- Inflation, deflation and cushion retraction are tested with a trailer in the bay.
You will need to provide a clear yard area in front of the bay, take the bay out of use and arrange a power supply near the door, or ask us to include one. At cold stores we plan the work with the dock door kept closed, so the store stays at temperature while the shelter goes up outside.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What we look at on site
- Working hours, shift patterns and windows for out-of-hours work
- Control positions, isolators and any existing interlocks
- Lighting inside trailers and at the dock face
- Forklift and pallet truck loads crossing the leveller platform
- Condition of any existing leveller pit, kerb angles and pit drainage
- Age and condition of the equipment already in place
Options to discuss
Interlocked controls
Controls linked to the door, leveller and restraint so the shelter inflates before the door opens and deflates only once it has closed.
Protective outer covers
Hard-wearing covers over the cushions that shield the fabric from weather, sunlight and trailer contact, extending cushion life on exposed docks.
What do the rules in England mean for the work?
Sites in Brighton fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.
Questions about inflatable dock shelters in Brighton
Will you deal with building control and planning for a project in Brighton?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
Can you work alongside our main contractor on a new build in Brighton?
Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.
Can you work outside our normal operating hours in Brighton?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
Can a punctured cushion be repaired?
Small punctures and tears can usually be patched, and a badly damaged cushion can be replaced on its own without changing the frame or fan. Repairs are carried out on a chargeable visit, with the price agreed before anyone attends.
What happens to an inflatable shelter if the power fails?
If the power fails, the fan stops and the cushions gradually deflate, so the trailer can leave once loading has been brought to a safe end. At a cold store, the dock door should be closed by hand where possible to protect the store. We explain the power failure routine at handover.
Inflatable dock shelters near Brighton
Sites close to Brighton get the same service, including those in Hove (1 mile), Portslade (3 miles) and Rottingdean (4 miles), with every job run the same way.
Other loading bay services in Brighton
Full guide to inflatable dock shelters · Everything we do in Brighton
If a loading bay in Brighton needs attention, call us or send photos and details online.
