Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Reigate

Loading houses in Reigate

Whatever the size of the operation, we can take on loading houses in Reigate, with every job run by us and carried out by specialists we manage directly.

Guide £14,500–£32,000 per house ex VATFree site surveyRH2
Location
Reigate, Surrey
Main postcode district
RH2
Nearby (straight line)
Redhill (2 miles), Horley (5 miles) and Dorking (6 miles)
Survey and quote
Free, with a fixed written quote
Loading houses, in short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

What should sites in Reigate consider?

Chilled stores near Reigate sometimes favour loading houses because the building door closes at the wall line, keeping the cold envelope sealed when no trailer is docked. Racked warehouses around Reigate that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead.

Where a yard in Reigate is narrow, an angled loading house lets trailers approach on a diagonal and can sometimes fit more bays along one wall.

A single contact at Loading Bay Doors handles your project in Reigate from start to finish. The free site survey and fixed written quote come first, with no obligation to proceed. We then book the installation for times that suit the operation, including out of hours by arrangement, and manage the specialist engineers on site. At the end we commission and test the equipment, walk your team through it and provide the documentation.

When is a loading house better than an internal dock?

A loading house is usually the better option when the building floor is already at dock height but there is no practical way to form a leveller pit inside. It moves the whole dock outside the wall, leaving the internal floor clear.

  • No room inside: racking, production lines or mezzanines sit right up to the wall.
  • Difficult slab: the floor slab carries services or is unsuited to breaking out for a pit.
  • Thermal control: the building door closes at the wall line, so the leveller sits outside the heated or chilled space when no trailer is docked.
  • Security: the building can be closed at the wall line while the house itself stays open to the yard.
  • Narrow yards: an angled house lets trailers approach on a diagonal and can fit more bays along one wall.

Where the building floor is at yard level, a loading house alone will not solve the height difference, and a recessed approach or lift table is usually needed instead.

What is a loading house made of?

A loading house is a steel frame clad in insulated composite panels, with a dock leveller built into its floor and a shelter or seal across its front. It is made to suit your building, trailers and yard rather than bought off the shelf.

  • Frame: galvanised or painted steel, supported on legs or a sub-frame that sits on concrete foundations.
  • Walls and roof: insulated composite panels, usually colour-matched to the building cladding, with guttering to carry rainwater away.
  • Floor and leveller: a steel deck with a hydraulic swing-lip or telescopic-lip leveller set into it.
  • Front: a retractable or inflatable shelter or a foam seal, with bumpers below to take trailer impact.
  • Building door: an insulated sectional door in the original wall opening, closing the building when no trailer is docked.
  • Extras: internal lighting, dock lights and traffic lights as required.

The insulated envelope reduces the heat or chill lost around the trailer compared with an open dock.

Guide price, Reigate
£14,500–£32,000 per house, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What do we check at the survey?

  • Working hours, shift patterns and windows for out-of-hours work
  • Temperature requirements for chilled, frozen or ambient goods
  • Access for deliveries, cranes or lifting equipment during installation
  • Headroom above the opening and which track type will suit it
  • How drivers are prevented from pulling away too early
  • Whether planning, building control or a building warrant may be needed

Options to discuss

Straight loading house

Set square to the building wall, the simplest layout where the yard has room for trailers to reverse straight in. Usually the most economical arrangement for one or more bays.

Angled loading house

Set at an angle to the wall so trailers approach on a diagonal, useful on narrow yards and sometimes allowing more bays to fit along a single elevation.

What do the rules in England mean for the work?

Sites in Reigate fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.

Questions about loading houses in Reigate

Do you cover Reigate for loading houses?

Yes. We take on loading houses for businesses in Reigate and across Surrey. We survey the site, provide a fixed written quote and manage the installation, with specialist installation engineers working under our management. Visits are arranged in advance at a time that suits your operation, and the same single contact stays with the job through to handover.

Which building and safety rules apply to a site in Reigate?

It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Reigate, we check what applies at survey and design to it.

How do you price loading houses for a site in Reigate?

Guide budgets for supply and fit are £14,500 to £32,000 per house, excluding VAT. The figure moves with size, insulation, the operator, electrics, access, any pit or groundworks and out-of-hours working. Where levellers are involved, the guide assumes an existing, sound pit. After the free survey you receive a fixed written quote, and that is the price for the agreed scope.

How long does a loading house take to install?

The programme depends mainly on foundation works and manufacturing lead times, and we set it out in writing with the quote. On site, foundations must cure before the frame goes up, and the rest of the work follows in sequence. We agree dates with you so other bays can keep working.

Does a loading house need planning permission?

A loading house can need planning permission because it is a new external structure, and we check this at survey for every project. Forming a new opening in the wall may also need Building Regulations approval, a building warrant in Scotland or building control approval in Northern Ireland, depending on where the site is.

Loading houses near Reigate

If your site is not in Reigate itself, it may be near one of these: Redhill (2 miles), Horley (5 miles) and Dorking (6 miles). Pick the closest.

Other loading bay services in Reigate

Full guide to loading houses · Everything we do in Reigate

Speak to us about your Reigate loading bay. We will ask the right questions, then set out the next step clearly.

Call freeGet a quote