Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Tyldesley

Loading houses in Tyldesley

Enquiries about loading houses from Tyldesley go straight to our team, who will ask a few practical questions about the bay before arranging the next step with you.

Guide £14,500–£32,000 per house ex VATFree site surveyM29
Location
Tyldesley, Greater Manchester
Main postcode district
M29
Nearby (straight line)
Leigh (2 miles), Walkden (3 miles) and Bolton (5 miles)
Survey and quote
Free, with a fixed written quote
Loading houses, in short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

Is this right for your site in Tyldesley?

Chilled stores near Tyldesley sometimes favour loading houses because the building door closes at the wall line, keeping the cold envelope sealed when no trailer is docked. Racked warehouses around Tyldesley that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead.

Where a yard in Tyldesley is narrow, an angled loading house lets trailers approach on a diagonal and can sometimes fit more bays along one wall.

A single contact at Loading Bay Doors handles your project in Tyldesley from start to finish. The free site survey and fixed written quote come first, with no obligation to proceed. We then book the installation for times that suit the operation, including out of hours by arrangement, and manage the specialist engineers on site. At the end we commission and test the equipment, walk your team through it and provide the documentation.

How much does a loading house cost?

A loading house typically costs £14,500 to £32,000 per house, supplied and installed, excluding VAT. That covers the insulated structure with its leveller and shelter or seal; the figure for your site depends on size, layout and what has to happen to the building and yard.

What moves the price:

  • Size and layout: straight houses are simpler than angled ones, and larger houses use more steel and panel.
  • Leveller type: telescopic-lip levellers cost more than swing-lip.
  • Front sealing: inflatable shelters cost more than retractable shelters or foam seals.
  • Foundations: ground conditions and buried services decide the size of pads or footings.
  • Building works: forming or enlarging the wall opening, and a new insulated door if needed.
  • Electrics and access: supply to the leveller and lights, crane access and any out-of-hours working.

These are guide budgets. After a free site survey we send a written quote that is the fixed price. VAT is added at the standard rate.

When is a loading house better than an internal dock?

A loading house is usually the better option when the building floor is already at dock height but there is no practical way to form a leveller pit inside. It moves the whole dock outside the wall, leaving the internal floor clear.

  • No room inside: racking, production lines or mezzanines sit right up to the wall.
  • Difficult slab: the floor slab carries services or is unsuited to breaking out for a pit.
  • Thermal control: the building door closes at the wall line, so the leveller sits outside the heated or chilled space when no trailer is docked.
  • Security: the building can be closed at the wall line while the house itself stays open to the yard.
  • Narrow yards: an angled house lets trailers approach on a diagonal and can fit more bays along one wall.

Where the building floor is at yard level, a loading house alone will not solve the height difference, and a recessed approach or lift table is usually needed instead.

Guide price, Tyldesley
£14,500–£32,000 per house, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What we look at on site

  • Access for deliveries, cranes or lifting equipment during installation
  • Clear opening width and height for each door
  • How often each door cycles during a typical shift
  • Wheel guide positions and yard markings for reversing vehicles
  • Lighting inside trailers and at the dock face
  • Forklift and pallet truck loads crossing the leveller platform

Options to discuss

Shelter or seal front

A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.

Straight loading house

Set square to the building wall, the simplest layout where the yard has room for trailers to reverse straight in. Usually the most economical arrangement for one or more bays.

Which rules apply in England?

Workplace safety in England is regulated by HSE. For a loading bay in Tyldesley, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.

Questions about loading houses in Tyldesley

Can you work outside our normal operating hours in Tyldesley?

Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.

Do you cover Tyldesley for loading houses?

Yes. We take on loading houses for businesses in Tyldesley and across Greater Manchester. We survey the site, provide a fixed written quote and manage the installation, with specialist installation engineers working under our management. Visits are arranged in advance at a time that suits your operation, and the same single contact stays with the job through to handover.

Can you work alongside our main contractor on a new build in Tyldesley?

Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.

Can a loading house be used for a cold store?

Yes. Loading houses suit chilled and frozen operations because the building door closes at the wall line, keeping the cold space sealed when no trailer is docked. The panels, door and shelter or seal are specified to suit the temperatures involved, which we confirm at survey.

What door is used with a loading house?

The building wall behind a loading house usually has an insulated sectional door, which closes the building at the wall line when no trailer is docked. An existing door can sometimes be kept if it is in good condition. In England, replacement doors need to meet the Approved Document L limiting U-value for large doors.

Loading houses near Tyldesley

Other towns within reach of Tyldesley on our coverage list include Leigh (2 miles), Walkden (3 miles) and Bolton (5 miles), all covered on the same terms.

Other loading bay services in Tyldesley

Full guide to loading houses · Everything we do in Tyldesley

Tell us what is happening at your Tyldesley dock, what equipment is there and when it is used, and we will suggest the right next step.

Call freeGet a quote