- Location
- Leigh, Greater Manchester
- Main postcode district
- WN7
- Nearby (straight line)
- Tyldesley (2 miles), Newton-le-Willows (5 miles) and Walkden (5 miles)
- Survey and quote
- Free, with a fixed written quote
A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.
Is this right for your site in Leigh?
Chilled stores near Leigh sometimes favour loading houses because the building door closes at the wall line, keeping the cold envelope sealed when no trailer is docked. Units in Leigh with floors at dock height but no room for an internal leveller pit are typical candidates for an external loading house.
Any loading house proposed in Leigh needs its planning and building control position checked, which we look at during the site survey before quoting.
The survey is free, the quote is written and the price is fixed: that is how every installation in Leigh begins. We then manage the work from start to finish. Fitting is carried out by specialist installers under our management, phased so the operation keeps moving, and nights or weekends can be booked by arrangement. On the final day we test the equipment with you and hand over the operating and maintenance information.
How much does a loading house cost?
A loading house typically costs £14,500 to £32,000 per house, supplied and installed, excluding VAT. That covers the insulated structure with its leveller and shelter or seal; the figure for your site depends on size, layout and what has to happen to the building and yard.
What moves the price:
- Size and layout: straight houses are simpler than angled ones, and larger houses use more steel and panel.
- Leveller type: telescopic-lip levellers cost more than swing-lip.
- Front sealing: inflatable shelters cost more than retractable shelters or foam seals.
- Foundations: ground conditions and buried services decide the size of pads or footings.
- Building works: forming or enlarging the wall opening, and a new insulated door if needed.
- Electrics and access: supply to the leveller and lights, crane access and any out-of-hours working.
These are guide budgets. After a free site survey we send a written quote that is the fixed price. VAT is added at the standard rate.
What happens on site when a loading house is installed?
Installing a loading house takes the bay out of use from the foundation works to commissioning, but the building can stay secure because the existing wall and door remain until late in the job.
- Foundations: concrete pads or footings are formed in the yard and left to cure.
- Erection: the steel frame is lifted into place, usually by crane, and fixed to the foundations and building.
- Cladding and equipment: panels, leveller, shelter or seal, bumpers and lights are fitted.
- Door and electrics: the building door is fitted or adapted and the leveller and lights connected.
- Commissioning: everything is tested with a trailer before handover.
We ask you to provide yard space for the crane and deliveries, any drawings of drains or buried services, a power supply, and clear arrangements for keeping vehicles and people away from the lifting zone. Neighbouring bays may need to close briefly while the crane is working.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
Survey checklist for your dock
- Condition of any existing leveller pit, kerb angles and pit drainage
- Bumper position and wear or damage on the dock face
- Whether planning, building control or a building warrant may be needed
- Scope to convert ground-level doors into docks or add lift tables
- Wind exposure at the dock, which affects door and shelter choice
- Gaps around trailers where heated or chilled air escapes
Options to discuss
Leveller choice
A hydraulic swing-lip leveller for general trailer loading, or a telescopic-lip leveller for precise placement, end-loading and trailers that cannot be reversed tight to the dock.
Straight loading house
Set square to the building wall, the simplest layout where the yard has room for trailers to reverse straight in. Usually the most economical arrangement for one or more bays.
Regulations and approvals in England
Sites in Leigh fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.
Questions about loading houses in Leigh
How long does installation take at a site in Leigh?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
Do you cover Leigh for loading houses?
Yes. We take on loading houses for businesses in Leigh and across Greater Manchester. We survey the site, provide a fixed written quote and manage the installation, with specialist installation engineers working under our management. Visits are arranged in advance at a time that suits your operation, and the same single contact stays with the job through to handover.
Will you deal with building control and planning for a project in Leigh?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
Can a loading house be used for a cold store?
Yes. Loading houses suit chilled and frozen operations because the building door closes at the wall line, keeping the cold space sealed when no trailer is docked. The panels, door and shelter or seal are specified to suit the temperatures involved, which we confirm at survey.
Does a loading house need planning permission?
A loading house can need planning permission because it is a new external structure, and we check this at survey for every project. Forming a new opening in the wall may also need Building Regulations approval, a building warrant in Scotland or building control approval in Northern Ireland, depending on where the site is.
Loading houses near Leigh
Nearby places we cover, measured from Leigh, include Tyldesley (2 miles), Newton-le-Willows (5 miles) and Walkden (5 miles). Ask if your own town is missing.
Other loading bay services in Leigh
Full guide to loading houses · Everything we do in Leigh
Ready to talk about a loading bay in Leigh? Call us, or send the details through the quote form.