- Location
- Stretford, Greater Manchester
- Main postcode district
- M32
- Nearby (straight line)
- Urmston (2 miles), Sale (2 miles) and Eccles (2 miles)
- Survey and quote
- Free, with a fixed written quote
A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.
Why do sites in Stretford choose this?
For older buildings in Stretford with a raised floor and little internal space by the wall, an external house can provide a modern hydraulic dock without major alterations. Racked warehouses around Stretford that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead.
Where a yard in Stretford is narrow, an angled loading house lets trailers approach on a diagonal and can sometimes fit more bays along one wall.
Your loading bay stays our responsibility from the survey to the handover. In Stretford, the survey and written quote are free, and the quoted price is fixed for the agreed scope. Installation is carried out by specialist engineers working under our management, at times planned with you to protect your loading schedule. Out-of-hours work is available by arrangement. We finish by testing the equipment and handing over its documentation.
A note on the freight picture around Stretford and beyond: Trafford Park, one of the largest industrial estates in Europe, is next door. Whatever traffic your own site handles, specify the dock to suit it.
When is a loading house better than an internal dock?
A loading house is usually the better option when the building floor is already at dock height but there is no practical way to form a leveller pit inside. It moves the whole dock outside the wall, leaving the internal floor clear.
- No room inside: racking, production lines or mezzanines sit right up to the wall.
- Difficult slab: the floor slab carries services or is unsuited to breaking out for a pit.
- Thermal control: the building door closes at the wall line, so the leveller sits outside the heated or chilled space when no trailer is docked.
- Security: the building can be closed at the wall line while the house itself stays open to the yard.
- Narrow yards: an angled house lets trailers approach on a diagonal and can fit more bays along one wall.
Where the building floor is at yard level, a loading house alone will not solve the height difference, and a recessed approach or lift table is usually needed instead.
How much does a loading house cost?
A loading house typically costs £14,500 to £32,000 per house, supplied and installed, excluding VAT. That covers the insulated structure with its leveller and shelter or seal; the figure for your site depends on size, layout and what has to happen to the building and yard.
What moves the price:
- Size and layout: straight houses are simpler than angled ones, and larger houses use more steel and panel.
- Leveller type: telescopic-lip levellers cost more than swing-lip.
- Front sealing: inflatable shelters cost more than retractable shelters or foam seals.
- Foundations: ground conditions and buried services decide the size of pads or footings.
- Building works: forming or enlarging the wall opening, and a new insulated door if needed.
- Electrics and access: supply to the leveller and lights, crane access and any out-of-hours working.
These are guide budgets. After a free site survey we send a written quote that is the fixed price. VAT is added at the standard rate.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What we look at on site
- Forklift and pallet truck loads crossing the leveller platform
- Bumper position and wear or damage on the dock face
- Lighting inside trailers and at the dock face
- Traffic routes for vehicles and separation of pedestrians
- Asbestos register and any other site hazard information
- Dock height and the mix of trailers you load
Options to discuss
Leveller choice
A hydraulic swing-lip leveller for general trailer loading, or a telescopic-lip leveller for precise placement, end-loading and trailers that cannot be reversed tight to the dock.
Shelter or seal front
A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.
Which rules apply in England?
Sites in Stretford fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.
Questions about loading houses in Stretford
Can you work outside our normal operating hours in Stretford?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
Will you deal with building control and planning for a project in Stretford?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
Can you work alongside our main contractor on a new build in Stretford?
Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.
Can a loading house be used for a cold store?
Yes. Loading houses suit chilled and frozen operations because the building door closes at the wall line, keeping the cold space sealed when no trailer is docked. The panels, door and shelter or seal are specified to suit the temperatures involved, which we confirm at survey.
How long does a loading house take to install?
The programme depends mainly on foundation works and manufacturing lead times, and we set it out in writing with the quote. On site, foundations must cure before the frame goes up, and the rest of the work follows in sequence. We agree dates with you so other bays can keep working.
Loading houses near Stretford
Close neighbours of Stretford with their own pages here: Urmston (2 miles), Sale (2 miles) and Eccles (2 miles). Choose one to see coverage details for that town.
Other loading bay services in Stretford
Full guide to loading houses · Everything we do in Stretford
Start your enquiry for Stretford through the quote tool. A few photos and approximate sizes help us respond with something useful.
