A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.
What matters for loading houses in Romford?
Chilled stores near Romford sometimes favour loading houses because the building door closes at the wall line, keeping the cold envelope sealed when no trailer is docked. Manufacturing businesses around Romford adding a dock to an existing building often find a loading house less disruptive than breaking out the slab inside.
Any loading house proposed in Romford needs its planning and building control position checked, which we look at during the site survey before quoting.
Keeping the dock running is usually the first concern, so we plan around it. After a free survey of your Romford site and a written quote at a fixed price, we agree when each bay can be released and whether any work should happen out of hours. Specialist installation engineers working under our management then fit the equipment, and we test it and hand over the documentation before the bay goes back into use.
When is a loading house better than an internal dock?
A loading house is usually the better option when the building floor is already at dock height but there is no practical way to form a leveller pit inside. It moves the whole dock outside the wall, leaving the internal floor clear.
- No room inside: racking, production lines or mezzanines sit right up to the wall.
- Difficult slab: the floor slab carries services or is unsuited to breaking out for a pit.
- Thermal control: the building door closes at the wall line, so the leveller sits outside the heated or chilled space when no trailer is docked.
- Security: the building can be closed at the wall line while the house itself stays open to the yard.
- Narrow yards: an angled house lets trailers approach on a diagonal and can fit more bays along one wall.
Where the building floor is at yard level, a loading house alone will not solve the height difference, and a recessed approach or lift table is usually needed instead.
Does a loading house need planning permission or building approval?
A loading house can need planning permission, because it is a new external structure, so we check this at survey rather than assuming it is not needed. The answer depends on the site, the size of the house and any planning conditions already on the building.
Forming a new opening in the building wall is a structural alteration that may need approval. In England and Wales that means Building Regulations approval, in Scotland a building warrant, and in Northern Ireland building control approval.
Energy rules can also apply to the door in the building wall. In England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. Wales, Scotland and Northern Ireland have their own energy rules, and we confirm the figure that applies to your nation and project.
The leveller inside the house is specified to BS EN 1398:2009, the dock leveller safety standard. Our guide to loading houses explained goes through the approvals in more detail.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
Survey checklist for your dock
- Wall and steel structure for door, shelter and bumper fixings
- Gaps around trailers where heated or chilled air escapes
- Headroom above the opening and which track type will suit it
- Forklift and pallet truck loads crossing the leveller platform
- Bumper position and wear or damage on the dock face
- Asbestos register and any other site hazard information
Options to discuss
Straight loading house
Set square to the building wall, the simplest layout where the yard has room for trailers to reverse straight in. Usually the most economical arrangement for one or more bays.
Shelter or seal front
A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.
Regulations and approvals in England
In England, Approved Document L (2021) sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. That shapes door specification for sites in Romford, so we confirm the requirement for your project and check what applies at survey before recommending a door.
Questions about loading houses in Romford
Is VAT included in your guide prices for loading houses?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Greater London as everywhere else: for loading houses, it is £14,500 to £32,000 per house, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
What warranty comes with new loading bay equipment?
New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Romford site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.
What details do you need from us to quote for loading houses?
To get started, send the site address in Romford, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.
How long does a loading house take to install?
The programme depends mainly on foundation works and manufacturing lead times, and we set it out in writing with the quote. On site, foundations must cure before the frame goes up, and the rest of the work follows in sequence. We agree dates with you so other bays can keep working.
Can a loading house be moved later?
Loading houses are bolted steel structures rather than masonry, so in principle they can be dismantled and moved if your needs change. In practice, relocation needs new foundations and an opening at the new position, so it is usually considered only where a house is fairly new and the new position suits it.
Loading houses near Romford
We also cover towns near Romford, including Dagenham (2 miles), Rainham (4 miles) and Ilford (5 miles). Each has its own page with the same services and process.