Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Park Royal

Loading houses in Park Royal

Our approach to loading houses in Park Royal matches the way we work across Greater London: understand the dock first, agree the scope in writing, then manage the job through to a tested handover.

Guide £14,500–£32,000 per house ex VATFree site surveyNW10
Location
Park Royal, Greater London
Main postcode district
NW10
Nearby (straight line)
Acton (1 mile), Wembley (2 miles) and Greenford (3 miles)
Survey and quote
Free, with a fixed written quote
Loading houses, in short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

Is this right for your site in Park Royal?

Any loading house proposed in Park Royal needs its planning and building control position checked, which we look at during the site survey before quoting. Units in Park Royal with floors at dock height but no room for an internal leveller pit are typical candidates for an external loading house.

Racked warehouses around Park Royal that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead.

We keep the process simple for sites in Park Royal. A free survey tells us what the dock needs; a fixed written quote tells you what it will cost and what is included. We then organise the installation, with specialist engineers under our management and a programme agreed around your shifts. Night and weekend work is available by arrangement. Before we leave, the new equipment is tested, demonstrated and handed over with its documentation.

Context for sites in and around Park Royal, briefly: this is London's largest industrial estate. Wherever a dock sits, the same questions apply about doors, levellers, sealing and vehicle safety.

What happens on site when a loading house is installed?

Installing a loading house takes the bay out of use from the foundation works to commissioning, but the building can stay secure because the existing wall and door remain until late in the job.

  1. Foundations: concrete pads or footings are formed in the yard and left to cure.
  2. Erection: the steel frame is lifted into place, usually by crane, and fixed to the foundations and building.
  3. Cladding and equipment: panels, leveller, shelter or seal, bumpers and lights are fitted.
  4. Door and electrics: the building door is fitted or adapted and the leveller and lights connected.
  5. Commissioning: everything is tested with a trailer before handover.

We ask you to provide yard space for the crane and deliveries, any drawings of drains or buried services, a power supply, and clear arrangements for keeping vehicles and people away from the lifting zone. Neighbouring bays may need to close briefly while the crane is working.

Can a loading house be added to an existing building?

Yes, loading houses are often added to existing buildings, provided the floor is at or near dock height and the wall can take a suitable opening. Adding docks without breaking out the floor is one of the main reasons operators choose them.

At survey we check:

  • the floor height inside against the yard level outside;
  • whether an existing door opening can be used, or a new one formed in the cladding or masonry;
  • drains, ducts and other buried services where foundations will go;
  • the space trailers need to manoeuvre, and whether an angled house would work better;
  • any planning or building control approval the project may need.

Where the existing door is in good condition and suits the new layout, it can sometimes be kept. If your building has floors at yard level, a wider loading bay conversion may be the better route.

Guide price, Park Royal
£14,500–£32,000 per house, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What do we check at the survey?

  • Condition of any existing leveller pit, kerb angles and pit drainage
  • How drivers are prevented from pulling away too early
  • Temperature requirements for chilled, frozen or ambient goods
  • Headroom above the opening and which track type will suit it
  • Bumper position and wear or damage on the dock face
  • Access for deliveries, cranes or lifting equipment during installation

Options to discuss

Leveller choice

A hydraulic swing-lip leveller for general trailer loading, or a telescopic-lip leveller for precise placement, end-loading and trailers that cannot be reversed tight to the dock.

Shelter or seal front

A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.

Planning, building control and safety law in England

Sites in Park Royal fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.

Questions about loading houses in Park Royal

What warranty comes with new loading bay equipment?

New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Park Royal site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.

Do you remove and dispose of the old equipment?

Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Park Royal, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.

Is VAT included in your guide prices for loading houses?

No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Greater London as everywhere else: for loading houses, it is £14,500 to £32,000 per house, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.

What door is used with a loading house?

The building wall behind a loading house usually has an insulated sectional door, which closes the building at the wall line when no trailer is docked. An existing door can sometimes be kept if it is in good condition. In England, replacement doors need to meet the Approved Document L limiting U-value for large doors.

How long does a loading house take to install?

The programme depends mainly on foundation works and manufacturing lead times, and we set it out in writing with the quote. On site, foundations must cure before the frame goes up, and the rest of the work follows in sequence. We agree dates with you so other bays can keep working.

Loading houses near Park Royal

We also cover towns near Park Royal, including Acton (1 mile), Wembley (2 miles) and Greenford (3 miles). Each has its own page with the same services and process.

Other loading bay services in Park Royal

Full guide to loading houses · Everything we do in Park Royal

Request a quote for your loading bay in Park Royal, attaching photos of the dock, the equipment and any damage.

Call freeGet a quote