Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Feltham

Loading houses in Feltham

We offer help with loading houses to businesses in Feltham and across Greater London, whether the bay handles a few deliveries a week or trailers around the clock.

Guide £14,500–£32,000 per house ex VATFree site surveyTW13
Location
Feltham, Greater London
Main postcode district
TW13
Nearby (straight line)
Ashford (2 miles), Hounslow (3 miles) and Sunbury-on-Thames (3 miles)
Survey and quote
Free, with a fixed written quote
Loading houses, in short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

How does this suit sites in Feltham?

Chilled stores near Feltham sometimes favour loading houses because the building door closes at the wall line, keeping the cold envelope sealed when no trailer is docked. Where a yard in Feltham is narrow, an angled loading house lets trailers approach on a diagonal and can sometimes fit more bays along one wall.

Units in Feltham with floors at dock height but no room for an internal leveller pit are typical candidates for an external loading house.

We do not give a fixed price without seeing the site. A free survey in Feltham lets us check the details that affect the job, and the written quote that follows is a fixed price for the agreed scope. We plan the work around your operation, arrange out-of-hours access if you need it and manage specialist installation engineers throughout. Handover includes testing, a demonstration and the paperwork you need for your records.

Worth knowing if you run a loading operation from Feltham or nearby: Heathrow's logistics and air-cargo cluster is close by. When specifying a bay, the trailer mix and dock height are what count.

Does a loading house need planning permission or building approval?

A loading house can need planning permission, because it is a new external structure, so we check this at survey rather than assuming it is not needed. The answer depends on the site, the size of the house and any planning conditions already on the building.

Forming a new opening in the building wall is a structural alteration that may need approval. In England and Wales that means Building Regulations approval, in Scotland a building warrant, and in Northern Ireland building control approval.

Energy rules can also apply to the door in the building wall. In England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. Wales, Scotland and Northern Ireland have their own energy rules, and we confirm the figure that applies to your nation and project.

The leveller inside the house is specified to BS EN 1398:2009, the dock leveller safety standard. Our guide to loading houses explained goes through the approvals in more detail.

What happens on site when a loading house is installed?

Installing a loading house takes the bay out of use from the foundation works to commissioning, but the building can stay secure because the existing wall and door remain until late in the job.

  1. Foundations: concrete pads or footings are formed in the yard and left to cure.
  2. Erection: the steel frame is lifted into place, usually by crane, and fixed to the foundations and building.
  3. Cladding and equipment: panels, leveller, shelter or seal, bumpers and lights are fitted.
  4. Door and electrics: the building door is fitted or adapted and the leveller and lights connected.
  5. Commissioning: everything is tested with a trailer before handover.

We ask you to provide yard space for the crane and deliveries, any drawings of drains or buried services, a power supply, and clear arrangements for keeping vehicles and people away from the lifting zone. Neighbouring bays may need to close briefly while the crane is working.

Guide price, Feltham
£14,500–£32,000 per house, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What does the free survey cover?

  • Wind exposure at the dock, which affects door and shelter choice
  • Escape routes and pedestrian doors close to the bay
  • Age and condition of the equipment already in place
  • How drivers are prevented from pulling away too early
  • How often each door cycles during a typical shift
  • Dock height and the mix of trailers you load

Options to discuss

Leveller choice

A hydraulic swing-lip leveller for general trailer loading, or a telescopic-lip leveller for precise placement, end-loading and trailers that cannot be reversed tight to the dock.

Angled loading house

Set at an angle to the wall so trailers approach on a diagonal, useful on narrow yards and sometimes allowing more bays to fit along a single elevation.

Planning, building control and safety law in England

Lift tables and dock lifts in Feltham may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.

Questions about loading houses in Feltham

How long does installation take at a site in Feltham?

It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.

Do you cover Feltham for loading houses?

Yes. We take on loading houses for businesses in Feltham and across Greater London. We survey the site, provide a fixed written quote and manage the installation, with specialist installation engineers working under our management. Visits are arranged in advance at a time that suits your operation, and the same single contact stays with the job through to handover.

How do you price loading houses for a site in Feltham?

Guide budgets for supply and fit are £14,500 to £32,000 per house, excluding VAT. The figure moves with size, insulation, the operator, electrics, access, any pit or groundworks and out-of-hours working. Where levellers are involved, the guide assumes an existing, sound pit. After the free survey you receive a fixed written quote, and that is the price for the agreed scope.

Does a loading house need planning permission?

A loading house can need planning permission because it is a new external structure, and we check this at survey for every project. Forming a new opening in the wall may also need Building Regulations approval, a building warrant in Scotland or building control approval in Northern Ireland, depending on where the site is.

What door is used with a loading house?

The building wall behind a loading house usually has an insulated sectional door, which closes the building at the wall line when no trailer is docked. An existing door can sometimes be kept if it is in good condition. In England, replacement doors need to meet the Approved Document L limiting U-value for large doors.

Loading houses near Feltham

We also cover towns near Feltham, including Ashford (2 miles), Hounslow (3 miles) and Sunbury-on-Thames (3 miles). Each has its own page with the same services and process.

Other loading bay services in Feltham

Full guide to loading houses · Everything we do in Feltham

Have photos of the door, leveller or shelter? Send them with your enquiry and we can give a clearer answer for your Feltham site.

Call freeGet a quote