- Location
- Lancaster, Lancashire
- Main postcode district
- LA1
- Nearby (straight line)
- Morecambe (3 miles), Heysham (4 miles) and Fleetwood (12 miles)
- Survey and quote
- Free, with a fixed written quote
An inflatable dock shelter is a dock shelter with air-filled fabric cushions at the top and sides of the opening, kept deflated and close to the building until a trailer has reversed in. A fan then inflates the cushions so they press against the trailer roof and sides, giving a close seal that adapts to different trailer widths and heights, and deflates again before the trailer leaves.
Is this right for your site in Lancaster?
Mixed fleets arriving at a cold store in Lancaster, from rigids to double-deck trailers, are exactly the situation inflatable cushions are designed for. Specifying a new temperature-controlled warehouse in Lancaster is the ideal time to design inflatable shelters in with the doors and levellers, so controls are integrated from the start.
Operators replacing foam seals in Lancaster that keep wearing out against ill-fitting trailers may find an inflatable shelter suffers far less rubbing.
We keep the process simple for sites in Lancaster. A free survey tells us what the dock needs; a fixed written quote tells you what it will cost and what is included. We then organise the installation, with specialist engineers under our management and a programme agreed around your shifts. Night and weekend work is available by arrangement. Before we leave, the new equipment is tested, demonstrated and handed over with its documentation.
What maintenance does an inflatable dock shelter need?
An inflatable shelter needs regular checks on its fabric, fan and controls, because a puncture or a weak fan stops it sealing properly. Planned servicing catches most faults before they affect the cold chain.
- Cushion fabric: inspect for punctures, abrasion and failed seams, and patch or replace cushions as needed.
- Fan unit: check filters, motor and airflow so the cushions inflate fully and promptly.
- Retraction system: straps, weights or springs must pull the cushions back clear of the trailer.
- Controls and interlocks: confirm the sequence with the door, leveller and restraint still works.
- Frame and fixings: look for impact damage and corrosion.
Snow and ice on the top cushion can stop it retracting, so a check before winter is worthwhile. Service and repair visits are chargeable, and the price is agreed before anyone attends.
How does an inflatable shelter work with the dock door and leveller?
An inflatable shelter is the first step in the dock sequence: it seals around the trailer before the door opens and only deflates once the door has closed. Getting that order right is what makes it effective.
- The trailer reverses onto the bumpers, guided by dock lights and wheel guides.
- The trailer is secured by restraint or key control, and the outside light shows red.
- The cushions inflate around the top and sides of the trailer.
- With the trailer sealed, the door opens and the leveller is deployed.
- After loading, the leveller is stored and the door closed.
- The cushions deflate and retract, and the light turns green.
Deflated cushions must sit clear of the door and leveller, and internal straps or weights pull them back so trailers do not catch them. Interlocks make each step depend on the last, so staff cannot open the door onto an unsealed trailer.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What do we check at the survey?
- Whether planning, building control or a building warrant may be needed
- Control positions, isolators and any existing interlocks
- Forklift and pallet truck loads crossing the leveller platform
- Power supply at each bay, including three-phase availability
- How often each door cycles during a typical shift
- Escape routes and pedestrian doors close to the bay
Options to discuss
Top cushion only
A single inflatable cushion across the top of the opening, paired with fixed side pads or curtains, for docks where trailer heights vary more than widths.
Three-sided inflatable
Top and side cushions that inflate around the trailer for the closest seal, the usual choice for chilled and frozen docks with mixed trailers.
Planning, building control and safety law in England
Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Lancaster. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.
Questions about inflatable dock shelters in Lancaster
Will you deal with building control and planning for a project in Lancaster?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
Is the site survey in Lancaster free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
What details do you need from us to quote for inflatable dock shelters?
To get started, send the site address in Lancaster, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.
Will we need to change the rest of the dock?
Usually not. Most inflatable shelters fit around an existing door opening, though the leveller, bumpers and door controls are reviewed so the cushions clear them and the interlocks work. Where the wall cannot carry the frame, a subframe is added. We confirm what is needed at survey.
Do the cushions touch the trailer as it reverses in?
No, the cushions stay deflated and pulled back against the building while the trailer reverses in, so there is no rubbing as it docks. They inflate only once the trailer is in position and secured, which reduces wear on the fabric compared with foam seals and curtain shelters.
Inflatable dock shelters near Lancaster
The same survey, quote and repair service is available in towns around Lancaster, such as Morecambe (3 miles), Heysham (4 miles) and Fleetwood (12 miles).
Other loading bay services in Lancaster
Full guide to inflatable dock shelters · Everything we do in Lancaster
Tell us what is happening at your Lancaster dock, what equipment is there and when it is used, and we will suggest the right next step.
