Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Shelters and seals · Farnborough

Inflatable dock shelters in Farnborough

In Farnborough, as in other parts of Hampshire, we offer inflatable dock shelters with clear communication, careful planning and work organised around your operation.

Guide £6,800–£12,800 per shelter ex VATFree site surveyGU11
Location
Farnborough, Hampshire
Main postcode district
GU11
Nearby (straight line)
Camberley (3 miles), Aldershot (3 miles) and Fleet (3 miles)
Survey and quote
Free, with a fixed written quote
Inflatable dock shelters, in short

An inflatable dock shelter is a dock shelter with air-filled fabric cushions at the top and sides of the opening, kept deflated and close to the building until a trailer has reversed in. A fan then inflates the cushions so they press against the trailer roof and sides, giving a close seal that adapts to different trailer widths and heights, and deflates again before the trailer leaves.

What should sites in Farnborough consider?

When a chilled dock in Farnborough sees condensation and ice around the door, the seal at the trailer is often where improvement starts. Fresh produce cooled at a packhouse in Farnborough stays colder during loading when the gap around the trailer is sealed by inflated cushions.

Operators replacing foam seals in Farnborough that keep wearing out against ill-fitting trailers may find an inflatable shelter suffers far less rubbing.

Step one is a survey at your site in Farnborough, which costs nothing and carries no obligation. Step two is a written quote with a fixed price and a clear scope. Step three is installation, scheduled around your operation and carried out by specialist installation engineers working under our management, including evenings or weekends if agreed. Step four is handover, when the equipment is tested in front of you and the paperwork is passed over.

What is involved in installing an inflatable dock shelter?

Installing an inflatable shelter involves fixing a steel frame to the building around the dock door, mounting the cushions and fan, and wiring the controls, usually over one to two days per bay.

  1. The wall is checked and fixing points or a subframe prepared.
  2. The frame is fixed from powered access equipment in the yard.
  3. Top and side cushions are fitted, with protective covers where specified.
  4. The fan unit is mounted and the control panel wired, including interlocks to the door, leveller or restraint.
  5. Inflation, deflation and cushion retraction are tested with a trailer in the bay.

You will need to provide a clear yard area in front of the bay, take the bay out of use and arrange a power supply near the door, or ask us to include one. At cold stores we plan the work with the dock door kept closed, so the store stays at temperature while the shelter goes up outside.

What maintenance does an inflatable dock shelter need?

An inflatable shelter needs regular checks on its fabric, fan and controls, because a puncture or a weak fan stops it sealing properly. Planned servicing catches most faults before they affect the cold chain.

  • Cushion fabric: inspect for punctures, abrasion and failed seams, and patch or replace cushions as needed.
  • Fan unit: check filters, motor and airflow so the cushions inflate fully and promptly.
  • Retraction system: straps, weights or springs must pull the cushions back clear of the trailer.
  • Controls and interlocks: confirm the sequence with the door, leveller and restraint still works.
  • Frame and fixings: look for impact damage and corrosion.

Snow and ice on the top cushion can stop it retracting, so a check before winter is worthwhile. Service and repair visits are chargeable, and the price is agreed before anyone attends.

Guide price, Farnborough
£6,800–£12,800 per shelter, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

Survey checklist for your dock

  • Wheel guide positions and yard markings for reversing vehicles
  • Asbestos register and any other site hazard information
  • Control positions, isolators and any existing interlocks
  • Dock height and the mix of trailers you load
  • Escape routes and pedestrian doors close to the bay
  • Bumper position and wear or damage on the dock face

Options to discuss

Protective outer covers

Hard-wearing covers over the cushions that shield the fabric from weather, sunlight and trailer contact, extending cushion life on exposed docks.

Three-sided inflatable

Top and side cushions that inflate around the trailer for the closest seal, the usual choice for chilled and frozen docks with mixed trailers.

Regulations and approvals in England

Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Farnborough. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.

Questions about inflatable dock shelters in Farnborough

Is the site survey in Farnborough free?

Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.

How long does installation take at a site in Farnborough?

It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.

Is VAT included in your guide prices for inflatable dock shelters?

No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Hampshire as everywhere else: for inflatable dock shelters, it is £6,800 to £12,800 per shelter, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.

Do the cushions touch the trailer as it reverses in?

No, the cushions stay deflated and pulled back against the building while the trailer reverses in, so there is no rubbing as it docks. They inflate only once the trailer is in position and secured, which reduces wear on the fabric compared with foam seals and curtain shelters.

Will we need to change the rest of the dock?

Usually not. Most inflatable shelters fit around an existing door opening, though the leveller, bumpers and door controls are reviewed so the cushions clear them and the interlocks work. Where the wall cannot carry the frame, a subframe is added. We confirm what is needed at survey.

Inflatable dock shelters near Farnborough

Sites close to Farnborough get the same service, including those in Camberley (3 miles), Aldershot (3 miles) and Fleet (3 miles), with every job run the same way.

Other loading bay services in Farnborough

Full guide to inflatable dock shelters · Everything we do in Farnborough

Send a few photos of the dock and a short description of the problem, and we will come back to you about your Farnborough site.

Call freeGet a quote