- Location
- Camberley, Surrey
- Main postcode district
- GU15
- Nearby (straight line)
- Sandhurst (2 miles), Farnborough (3 miles) and Crowthorne (3 miles)
- Survey and quote
- Free, with a fixed written quote
An inflatable dock shelter is a dock shelter with air-filled fabric cushions at the top and sides of the opening, kept deflated and close to the building until a trailer has reversed in. A fan then inflates the cushions so they press against the trailer roof and sides, giving a close seal that adapts to different trailer widths and heights, and deflates again before the trailer leaves.
Is this right for your site in Camberley?
Mixed fleets arriving at a cold store in Camberley, from rigids to double-deck trailers, are exactly the situation inflatable cushions are designed for. Driving rain and wind at an open bay in Camberley can wear cushion fabric, so a protective outer cover is worth considering on exposed docks.
Fresh produce cooled at a packhouse in Camberley stays colder during loading when the gap around the trailer is sealed by inflated cushions.
If you are planning inflatable dock shelters for a site in Camberley, expect four stages. A free survey and fixed written quote come first. We then agree a programme with you, including any out-of-hours work. Specialist installation engineers carry out the installation under our management, with us as your single point of contact. Finally, the equipment is tested, your staff are shown how it works and everything is handed over with its documentation.
How does an inflatable shelter work with the dock door and leveller?
An inflatable shelter is the first step in the dock sequence: it seals around the trailer before the door opens and only deflates once the door has closed. Getting that order right is what makes it effective.
- The trailer reverses onto the bumpers, guided by dock lights and wheel guides.
- The trailer is secured by restraint or key control, and the outside light shows red.
- The cushions inflate around the top and sides of the trailer.
- With the trailer sealed, the door opens and the leveller is deployed.
- After loading, the leveller is stored and the door closed.
- The cushions deflate and retract, and the light turns green.
Deflated cushions must sit clear of the door and leveller, and internal straps or weights pull them back so trailers do not catch them. Interlocks make each step depend on the last, so staff cannot open the door onto an unsealed trailer.
What is involved in installing an inflatable dock shelter?
Installing an inflatable shelter involves fixing a steel frame to the building around the dock door, mounting the cushions and fan, and wiring the controls, usually over one to two days per bay.
- The wall is checked and fixing points or a subframe prepared.
- The frame is fixed from powered access equipment in the yard.
- Top and side cushions are fitted, with protective covers where specified.
- The fan unit is mounted and the control panel wired, including interlocks to the door, leveller or restraint.
- Inflation, deflation and cushion retraction are tested with a trailer in the bay.
You will need to provide a clear yard area in front of the bay, take the bay out of use and arrange a power supply near the door, or ask us to include one. At cold stores we plan the work with the dock door kept closed, so the store stays at temperature while the shelter goes up outside.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- Control positions, isolators and any existing interlocks
- Working hours, shift patterns and windows for out-of-hours work
- Wind exposure at the dock, which affects door and shelter choice
- Traffic routes for vehicles and separation of pedestrians
- Wall and steel structure for door, shelter and bumper fixings
- Age and condition of the equipment already in place
Options to discuss
Protective outer covers
Hard-wearing covers over the cushions that shield the fabric from weather, sunlight and trailer contact, extending cushion life on exposed docks.
Three-sided inflatable
Top and side cushions that inflate around the trailer for the closest seal, the usual choice for chilled and frozen docks with mixed trailers.
What do the rules in England mean for the work?
Workplace safety in England is regulated by HSE. For a loading bay in Camberley, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.
Questions about inflatable dock shelters in Camberley
How long does installation take at a site in Camberley?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
Will you deal with building control and planning for a project in Camberley?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
Is the site survey in Camberley free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
Can a punctured cushion be repaired?
Small punctures and tears can usually be patched, and a badly damaged cushion can be replaced on its own without changing the frame or fan. Repairs are carried out on a chargeable visit, with the price agreed before anyone attends.
Will we need to change the rest of the dock?
Usually not. Most inflatable shelters fit around an existing door opening, though the leveller, bumpers and door controls are reviewed so the cushions clear them and the interlocks work. Where the wall cannot carry the frame, a subframe is added. We confirm what is needed at survey.
Inflatable dock shelters near Camberley
Sites close to Camberley get the same service, including those in Sandhurst (2 miles), Farnborough (3 miles) and Crowthorne (3 miles), with every job run the same way.
Other loading bay services in Camberley
Full guide to inflatable dock shelters · Everything we do in Camberley
Ready to talk about a loading bay in Camberley? Call us, or send the details through the quote form.
