An inflatable dock shelter is a dock shelter with air-filled fabric cushions at the top and sides of the opening, kept deflated and close to the building until a trailer has reversed in. A fan then inflates the cushions so they press against the trailer roof and sides, giving a close seal that adapts to different trailer widths and heights, and deflates again before the trailer leaves.
Is this right for your site in Bedfordshire?
Fresh produce cooled at a packhouse in Bedfordshire stays colder during loading when the gap around the trailer is sealed by inflated cushions. Pharmaceutical distributors around Bedfordshire working to tight temperature limits may want the close seal an inflatable shelter gives during every load.
Mixed fleets arriving at a cold store in Bedfordshire, from rigids to double-deck trailers, are exactly the situation inflatable cushions are designed for.
How does an installation in Bedfordshire work? First, a free, no-obligation survey to measure up and understand the operation. Next, a fixed written quote. Then a programme agreed with you, so the work fits around deliveries, with out-of-hours slots if needed. The installation itself is carried out by specialist engineers who answer to us, and it finishes with testing, a walk-through for your staff and a handover pack.
What maintenance does an inflatable dock shelter need?
An inflatable shelter needs regular checks on its fabric, fan and controls, because a puncture or a weak fan stops it sealing properly. Planned servicing catches most faults before they affect the cold chain.
- Cushion fabric: inspect for punctures, abrasion and failed seams, and patch or replace cushions as needed.
- Fan unit: check filters, motor and airflow so the cushions inflate fully and promptly.
- Retraction system: straps, weights or springs must pull the cushions back clear of the trailer.
- Controls and interlocks: confirm the sequence with the door, leveller and restraint still works.
- Frame and fixings: look for impact damage and corrosion.
Snow and ice on the top cushion can stop it retracting, so a check before winter is worthwhile. Service and repair visits are chargeable, and the price is agreed before anyone attends.
What is involved in installing an inflatable dock shelter?
Installing an inflatable shelter involves fixing a steel frame to the building around the dock door, mounting the cushions and fan, and wiring the controls, usually over one to two days per bay.
- The wall is checked and fixing points or a subframe prepared.
- The frame is fixed from powered access equipment in the yard.
- Top and side cushions are fitted, with protective covers where specified.
- The fan unit is mounted and the control panel wired, including interlocks to the door, leveller or restraint.
- Inflation, deflation and cushion retraction are tested with a trailer in the bay.
You will need to provide a clear yard area in front of the bay, take the bay out of use and arrange a power supply near the door, or ask us to include one. At cold stores we plan the work with the dock door kept closed, so the store stays at temperature while the shelter goes up outside.
Towns we cover in Bedfordshire
We take enquiries about inflatable dock shelters from across Bedfordshire. These are the towns with their own pages:
Budget range for supply and fit. The written quote after a free survey is the fixed price. All guide prices.
Regulations and approvals in England
Workplace safety in England is regulated by HSE. For a loading bay in Bedfordshire, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.
Questions
How long does installation take at a site in Bedfordshire?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
Will you deal with building control and planning for a project in Bedfordshire?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
Do the cushions touch the trailer as it reverses in?
No, the cushions stay deflated and pulled back against the building while the trailer reverses in, so there is no rubbing as it docks. They inflate only once the trailer is in position and secured, which reduces wear on the fabric compared with foam seals and curtain shelters.
Will we need to change the rest of the dock?
Usually not. Most inflatable shelters fit around an existing door opening, though the leveller, bumpers and door controls are reviewed so the cushions clear them and the interlocks work. Where the wall cannot carry the frame, a subframe is added. We confirm what is needed at survey.
Other services in Bedfordshire
Full guide to inflatable dock shelters · All loading bay services in Bedfordshire

