Dock traffic lights are red and green signals mounted outside and inside a loading bay to tell the driver and dock staff when it is safe to move or load. Interlocks are control links that stop equipment operating out of sequence, for example preventing the door opening until the trailer is restrained, or the leveller operating until the door is fully open.
Is this right for your site in Bedfordshire?
If a site in Bedfordshire has had door panels damaged by levellers raised too early, a leveller-to-door interlock is a straightforward fix to consider. Food and chilled operations around Bedfordshire with inflatable shelters often add interlocks so the shelter only inflates once a trailer is docked and restrained.
Sites around Bedfordshire that run night shifts often find traffic lights easier for drivers to read than staff waving or knocking on the cab door.
We never ask you to commit before you have a fixed price. A free survey at your Bedfordshire site comes first, followed by a written quote. When the order goes ahead, we plan the installation around your operation, book any out-of-hours working you need and manage the specialist installation engineers on site. The job ends with a full test, a run-through for the people who will use the equipment and a set of handover documents.
How much do dock traffic lights and interlocks cost?
Dock traffic lights and interlocks typically cost £650 to £3,400 per bay, supplied and fitted, excluding VAT. A pair of manually switched LED signals sits at the lower end, while a full interlock panel linking door, leveller, restraint and shelter sits towards the top.
What moves the price:
- Level of control: standalone lights, door-linked lights or a full interlocked sequence.
- Existing control panels: modern door and leveller panels often accept interlocks directly; older panels may need replacing with a combined bay panel.
- Sensors: door position switches, trailer presence sensors and restraint signals each add parts and wiring.
- Cable runs: distances between lights, panels and the power supply.
- Number of bays and timing: repeat bays reduce the cost per bay, while out-of-hours working adds to it.
These are guide budgets. After a free site survey we send a written quote, and that quote is the fixed price. VAT is added at the standard rate.
Which interlocks should a loading bay have?
The most useful loading bay interlocks stop the door opening until the trailer is in place or restrained, and stop the leveller operating until the door is fully open. Beyond that, the right set depends on the equipment fitted and your risk assessment.
- Door to restraint: the door cannot open until the restraint is engaged or a trailer is detected.
- Leveller to door: the leveller cannot be raised until the door is fully open, which prevents the lip hitting door panels.
- Door to leveller: the door cannot close until the leveller is back in its parked position.
- Restraint release: the restraint only releases once the door is closed and the leveller parked.
- Shelter to trailer: an inflatable shelter only inflates when a trailer is docked.
On a bay without a restraint, a trailer presence sensor can take its place in the door logic, although it confirms a trailer is there rather than holding it. Combining interlocks with vehicle restraints gives the strongest protection against drive-away.
Towns we cover in Bedfordshire
We take enquiries about dock traffic lights and interlocks from across Bedfordshire. These are the towns with their own pages:
Budget range for supply and fit. The written quote after a free survey is the fixed price. All guide prices.
What do the rules in England mean for the work?
Sites in Bedfordshire fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.
Questions
What details do you need from us to quote for dock traffic lights and interlocks?
To get started, send the site address in Bedfordshire, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.
Do you remove and dispose of the old equipment?
Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Bedfordshire, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.
Will interlocks slow down my loading operation?
Interlocks add a fixed sequence, but each step takes only moments and staff soon get used to it. In practice many sites find the sequence saves time overall, because there are fewer arguments about when to open the door and less damage from levellers being raised into part-open doors.
Do traffic lights and interlocks need maintenance?
Yes. Lights, sensors and interlocks should be checked at each planned service visit, including testing the full sequence and confirming that steps attempted out of order are blocked. As part of the dock equipment they fall under PUWER, which requires work equipment to be maintained in a safe condition.
Other services in Bedfordshire
Full guide to dock traffic lights and interlocks · All loading bay services in Bedfordshire

