Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Dock safety · Oban

Dock traffic lights and interlocks in Oban

Warehouse, factory and trade sites in Oban can bring requests for dock traffic lights and interlocks to us, and we organise the work in a way that suits how the site operates.

Guide £650–£3,400 per bay ex VATFree site surveyPA34
Location
Oban, Argyll and Bute
Main postcode district
PA34
Nearby (straight line)
Lochgilphead (26 miles)
Survey and quote
Free, with a fixed written quote
Dock traffic lights and interlocks, in short

Dock traffic lights are red and green signals mounted outside and inside a loading bay to tell the driver and dock staff when it is safe to move or load. Interlocks are control links that stop equipment operating out of sequence, for example preventing the door opening until the trailer is restrained, or the leveller operating until the door is fully open.

What matters for dock traffic lights and interlocks in Oban?

New warehouses in Oban can have lights and interlocks wired in during the electrical fit-out, avoiding retrofit cabling and keeping every bay on one control standard. Distribution centres near Oban taking trailers from many different hauliers benefit from a signal every driver understands, regardless of language or familiarity with the site.

Whether your unit in Oban has one dock or twenty, the survey looks at each bay's existing controls before we quote a fixed price in writing.

We do not give a fixed price without seeing the site. A free survey in Oban lets us check the details that affect the job, and the written quote that follows is a fixed price for the agreed scope. We plan the work around your operation, arrange out-of-hours access if you need it and manage specialist installation engineers throughout. Handover includes testing, a demonstration and the paperwork you need for your records.

How do inside and outside dock traffic lights work together?

Inside and outside dock lights always show opposite colours: when the driver sees red, dock staff see green, and the other way round. Each light is aimed at a different person, so each one only ever gives one instruction.

  • Outside light, facing the driver: red means stay on the bay because loading is in progress; green means the bay is clear to leave or to reverse on to.
  • Inside light, facing dock staff: green means the trailer is in place and it is safe to open the door and load; red means do not open the door or enter the trailer.

Lights can be switched in three main ways:

  1. Manually, by a switch beside the door, relying on dock staff to change it at the right moment.
  2. By door position, so opening the door automatically turns the outside light red.
  3. By the restraint, so the light only changes when the trailer is physically held.

Which interlocks should a loading bay have?

The most useful loading bay interlocks stop the door opening until the trailer is in place or restrained, and stop the leveller operating until the door is fully open. Beyond that, the right set depends on the equipment fitted and your risk assessment.

  • Door to restraint: the door cannot open until the restraint is engaged or a trailer is detected.
  • Leveller to door: the leveller cannot be raised until the door is fully open, which prevents the lip hitting door panels.
  • Door to leveller: the door cannot close until the leveller is back in its parked position.
  • Restraint release: the restraint only releases once the door is closed and the leveller parked.
  • Shelter to trailer: an inflatable shelter only inflates when a trailer is docked.

On a bay without a restraint, a trailer presence sensor can take its place in the door logic, although it confirms a trailer is there rather than holding it. Combining interlocks with vehicle restraints gives the strongest protection against drive-away.

Guide price, Oban
£650–£3,400 per bay, ex VAT

The same published guide range applies across Scotland; access, out-of-hours working and site conditions are confirmed at the free survey.

What does the free survey cover?

  • Asbestos register and any other site hazard information
  • Dock height and the mix of trailers you load
  • Gaps around trailers where heated or chilled air escapes
  • Wind exposure at the dock, which affects door and shelter choice
  • Whether planning, building control or a building warrant may be needed
  • Headroom above the opening and which track type will suit it

Options to discuss

Trailer presence sensors

Sensors that detect a trailer on the bay, used to switch lights, enable the door or trigger an inflatable shelter where no restraint is fitted.

Door-linked lights

Lights that change automatically with the door position, using a door switch or a signal from the door control panel, so the outside light turns red as the door opens.

Planning, building control and safety law in Scotland

Energy standards for buildings in Scotland are set out in Section 6 of the Building Standards Technical Handbook. For new or replacement loading bay doors in Oban, we confirm the figure that applies to your project and check what applies at survey, rather than relying on rules written for elsewhere in the UK.

Sites in and around Oban are covered by arrangement. There is no charge for the survey or the written quote, and any travel, ferry crossings or overnight stays needed for the installation itself are itemised in the quote, so you see the full price before agreeing.

Questions about dock traffic lights and interlocks in Oban

What warranty comes with new loading bay equipment?

New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Oban site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.

Can you work outside our normal operating hours in Oban?

Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.

How long does installation take at a site in Oban?

It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.

Are dock traffic lights enough on their own to stop drive-away?

Traffic lights on their own are a signal, not a physical barrier, so they depend on drivers obeying them. HSE lists traffic lights among the measures against early drive-away, and many sites combine them with key or paperwork control or with a vehicle restraint. The right combination should come from your workplace transport risk assessment.

Can interlocks be fitted to a manual loading bay door?

Yes. A door position switch fitted to a manual door can confirm when it is fully open or fully closed. That signal lets the traffic lights change automatically and stops the leveller being raised until the door is out of the way.

Dock traffic lights and interlocks near Oban

Sites close to Oban get the same service, including those in Lochgilphead (26 miles), with every job run the same way.

Other loading bay services in Oban

Full guide to dock traffic lights and interlocks · Everything we do in Oban

Use the quote tool to tell us about the doors, levellers or shelters at your Oban site, and we will be in touch to arrange the next step.

Call freeGet a quote