- Location
- Chorley, Lancashire
- Main postcode district
- PR7
- Nearby (straight line)
- Leyland (4 miles), Darwen (7 miles) and Wigan (7 miles)
- Survey and quote
- Free, with a fixed written quote
A dock seal is a set of fabric-covered foam pads fixed to the building around a loading bay door, usually a head pad and two side pads. When a trailer reverses in, its rear end presses into the foam, which compresses to close the gaps around the trailer body. Seals give a very tight fit but work best when the trailers using the bay are a consistent size.
Is this right for your site in Chorley?
Hygiene-sensitive sites in Chorley, such as food processors, can use dock seals to reduce the gaps through which dust and pests might enter during loading. Before recommending seals for a bay in Chorley, we check how consistent your trailers are, because mixed fleets are usually better served by a shelter.
Where trailers reverse onto a bay in Chorley slightly off-centre, tapered side pads and wheel guides help protect the seal from rubbing.
A single contact at Loading Bay Doors handles your project in Chorley from start to finish. The free site survey and fixed written quote come first, with no obligation to proceed. We then book the installation for times that suit the operation, including out of hours by arrangement, and manage the specialist engineers on site. At the end we commission and test the equipment, walk your team through it and provide the documentation.
How much do dock seals cost?
A set of dock seals typically costs £1,100 to £2,600 per set, excluding VAT, supply and fit. A set is normally a head pad and two side pads for one bay.
The price depends on:
- Pad size and depth: larger openings and deeper foam cost more.
- Head arrangement: a fixed head pad, or a curtain head for varied trailer heights.
- Cover fabric: heavier coated fabric and replaceable wear pleats last longer.
- Pad shape: tapered side pads that guide the trailer and intrude less into the opening.
- Mounting: fixing direct to masonry, to a steel frame, or to brackets that set the projection.
- Site work: removing old seals, adjusting bumpers and powered access equipment.
Where the foam is still sound, new covers can cost less than new pads, and we will say if that is an option. After a free site survey you receive a fixed written price for the work described.
How are dock seals fitted to a loading bay?
Dock seals are fixed to the outside wall around the dock door, normally on brackets or a frame that sets their projection, and a set usually takes a few hours to fit. No power supply is needed.
- The wall is checked for sound fixing points, with a frame or spreader plates added on cladding.
- The head pad and side pads are positioned to suit your trailer width and height.
- Projection is set relative to the bumpers, so trailers compress the foam by the right amount.
- Bumpers are checked and, if worn, replaced at the same time.
- A trailer is docked to confirm an even seal along the head and sides.
From you we need the bay taken out of use, a clear area in the yard for powered access equipment and, ideally, one of your usual trailers available at the end of the job so the fit can be checked under real conditions.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
Survey checklist for your dock
- Control positions, isolators and any existing interlocks
- Headroom above the opening and which track type will suit it
- Traffic routes for vehicles and separation of pedestrians
- Power supply at each bay, including three-phase availability
- Gaps around trailers where heated or chilled air escapes
- Drainage on recessed or sloping dock approaches
Options to discuss
Replaceable wear pleats
Sacrificial fabric strips on the pad faces that take the rubbing from trailers and can be replaced without changing the whole cover.
Tapered side pads
Side pads tapered in section so they guide the trailer in and intrude less into the trailer opening, which extends pad and cover life.
Planning, building control and safety law in England
Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Chorley. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.
Questions about dock seals in Chorley
Can you work outside our normal operating hours in Chorley?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
Is the site survey in Chorley free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
Is VAT included in your guide prices for dock seals?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Lancashire as everywhere else: for dock seals, it is £1,100 to £2,600 per set, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
How can I tell if seal projection is wrong?
Look at the pads with a trailer docked. Daylight around the head or sides suggests too little compression, while pads squashed flat or bulging around the trailer suggest too much. Worn bumpers are a common cause, and both can be checked at a planned service.
Do trailer doors need to be opened before docking against a seal?
Yes, the rear doors are opened and folded back before the trailer reverses onto a seal, so the pads press against the rear of the trailer rather than the doors. Gaps can remain at the door hinges, which is a known limitation of seals compared with shelters.
Dock seals near Chorley
If your site is not in Chorley itself, it may be near one of these: Leyland (4 miles), Darwen (7 miles) and Wigan (7 miles). Pick the closest.
Other loading bay services in Chorley
Full guide to dock seals · Everything we do in Chorley
Phone us to discuss your loading bay in Chorley, or start with the online quote tool if you prefer to send details first.
