Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Dock safety · Horley

Dock bumpers in Horley

If your site in Horley needs dock bumpers, we can help, whether the dock serves a cold store, a parcel operation, a food factory or a trade counter.

Guide £120–£480 per bumper ex VATFree site surveyRH6
Location
Horley, Surrey
Main postcode district
RH6
Nearby (straight line)
Crawley (4 miles), Redhill (5 miles) and Reigate (5 miles)
Survey and quote
Free, with a fixed written quote
Dock bumpers, in short

Dock bumpers are rubber or rubber-and-steel buffers fixed to the face of a loading dock, either side of the leveller, to absorb the impact of reversing vehicles. They hold the trailer a set distance from the building, protect the dock wall, leveller and door, and help a dock seal or shelter compress evenly. Most bays use two bumpers, replaced as they wear.

Is this right for your site in Horley?

Multi-tenant estates in Horley often see new occupants arrive with different fleets, and bumpers set up for one tenant's trailers may not suit the next. When a landlord in Horley re-lets a unit, replacing tired bumpers is a modest cost that protects the leveller and dock wall for the incoming tenant.

Sites near Horley handling a mix of articulated trailers, rigid vehicles and vans may need taller bumpers or a second lower pair to protect the dock face.

It starts with a free site survey in Horley, where we measure the openings, check the dock and talk through how the bay is used. You then receive a fixed written quote. Once you accept, we manage the job: specialist installation engineers carry out the work under our management, planned around your deliveries, and out-of-hours working can be arranged. At handover we test everything with you and leave the documentation.

Where should dock bumpers be positioned on the dock face?

Dock bumpers are normally fixed either side of the leveller, at a height that catches the rear of the trailer before anything else touches the building.

  • Height: typical UK dock height is around 1,200 mm, but trailer bed heights vary from roughly 900 to 1,600 mm, so bumpers must cover the range of vehicles you receive.
  • Projection: bumpers commonly stand about 100 mm proud of the dock face. Too little and trailers hit the wall; too much and a swing lip of about 400 to 500 mm may not reach far enough on to the trailer bed.
  • Spacing: bumpers should line up with the trailer chassis and sit clear of the leveller lip.
  • Seals and shelters: projection controls how far a dock seal compresses, so it is set with the seal depth in mind.

Pairing bumpers with steel wheel guides helps drivers reverse square, so both bumpers take an equal share of each impact.

When should dock bumpers be replaced?

Dock bumpers should be replaced when the rubber is worn close to the steel backing, split, missing layers or loose on its fixings. At that point the bumper no longer stops the trailer before it reaches the dock wall or leveller.

Common signs include:

  • Rubber worn into a curve or step where trailer chassis rub against it.
  • Laminated layers missing or bowed out between the steel angles.
  • Loose bolts, cracked concrete or rust staining around the fixings.
  • Uneven compression on a dock seal, showing trailers are sitting off-square.

Replace bumpers in pairs where possible, so the trailer is held square and both sides compress evenly. Steel-faced designs with replaceable faces can often be refreshed by changing the face plate alone, which keeps costs down on very busy bays.

Guide price, Horley
£120–£480 per bumper, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

Survey checklist for your dock

  • Escape routes and pedestrian doors close to the bay
  • Age and condition of the equipment already in place
  • Gaps around trailers where heated or chilled air escapes
  • Drainage on recessed or sloping dock approaches
  • Power supply at each bay, including three-phase availability
  • Asbestos register and any other site hazard information

Options to discuss

Vertical sliding bumpers

A face that rides up and down with the trailer instead of rubbing against it, reducing wear on very high-throughput docks.

Steel-faced bumpers

A rubber body behind a steel face plate that resists scuffing as the trailer bed moves during loading. Suited to busy bays with heavy forklift traffic.

Regulations and approvals in England

Sites in Horley fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.

Questions about dock bumpers in Horley

Do you remove and dispose of the old equipment?

Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Horley, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.

Which building and safety rules apply to a site in Horley?

It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Horley, we check what applies at survey and design to it.

Can you work outside our normal operating hours in Horley?

Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.

Are dock bumpers included in a complete bay package?

Yes. When we supply a complete loading bay, dock bumpers are specified alongside the leveller, door and shelter or seal so that projection, height and seal compression all work together. Bumpers can also be ordered with wheel guides and dock lights as part of a smaller safety upgrade on an existing bay.

Do you replace dock bumpers without changing other equipment?

Yes. Bumper replacement is often a standalone job, and we can fit new bumpers to existing docks without touching the door, leveller or shelter. If we notice other wear on site, such as a damaged seal or a struck leveller lip, we note it for you.

Dock bumpers near Horley

Businesses outside Horley may find their nearest town in this list: Crawley (4 miles), Redhill (5 miles) and Reigate (5 miles). Each page covers doors, docks, repairs and servicing.

Other loading bay services in Horley

Full guide to dock bumpers · Everything we do in Horley

For a written price on loading bay work in Horley, request a quote and include photos of the bay if you can.

Call freeGet a quote