- Location
- Egham, Surrey
- Main postcode district
- TW20
- Nearby (straight line)
- Staines (2 miles), Ashford (4 miles) and Windsor (4 miles)
- Survey and quote
- Free, with a fixed written quote
A complete loading bay installation is the supply and fitting of every item a dock needs as one coordinated package: typically an insulated door, a dock leveller, a shelter or seal, bumpers, wheel guides, a dock light and traffic lights or interlocks. One party manages the design, sequence and commissioning, so the parts fit together and work as a single system.
Why do sites in Egham choose this?
Warehouses near Egham handling mixed trailer types can specify different levellers bay by bay within one package while keeping a common control and maintenance standard. Developers building new distribution sheds in Egham can hand the whole dock package to one specialist, reducing the risk of gaps between the door, leveller and shelter trades.
Main contractors working on warehouse schemes around Egham need pit drawings and embed details early, which a complete bay package provides at design stage.
We keep the process simple for sites in Egham. A free survey tells us what the dock needs; a fixed written quote tells you what it will cost and what is included. We then organise the installation, with specialist engineers under our management and a programme agreed around your shifts. Night and weekend work is available by arrangement. Before we leave, the new equipment is tested, demonstrated and handed over with its documentation.
What regulations and standards apply to a new loading bay?
A new loading bay has to meet door safety law, work equipment law and, for the door, energy rules. The main references are:
- Doors: regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992 (Northern Ireland: the 1993 equivalent). Upward-opening doors need a device to stop them falling back, and powered doors need features to prevent trapping. Doors are made to BS EN 13241, with powered door safety covered by BS EN 12453.
- Levellers: BS EN 1398:2009, the dock leveller safety standard.
- All dock equipment: PUWER 1998, or PUWER (Northern Ireland) 1999, requiring suitable, maintained and inspected work equipment.
- Drive-away: HSE guidance (HSG136) says there should be safeguards against early drive-away, such as traffic lights, restraints or key control.
- Energy: in England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access doors. Other nations have their own rules, and we confirm the figure for your project.
Equipment in Great Britain may carry UKCA or CE marking; in Northern Ireland, CE or CE with UKNI.
Why buy the door, leveller and shelter as one package?
Buying the door, leveller and shelter as one package gives a single point of responsibility for how the bay works as a whole. When three suppliers each fit their own item, the gaps between them are nobody's job.
Typical problems a package avoids:
- a shelter head curtain that does not line up with the door header;
- a leveller width that does not suit the door opening or the trailers;
- bumper projection that leaves the dock seal too loose or crushed flat;
- door and leveller controls that cannot be interlocked because they were never designed to talk to each other;
- several handover packs and service schedules for one bay.
A package also makes multi-bay sites consistent. Every bay works the same way, staff learn one routine, and planned maintenance can cover the whole dock in one visit. For new warehouses it gives the main contractor one specialist to coordinate with instead of several.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
Survey checklist for your dock
- Power supply at each bay, including three-phase availability
- How often each door cycles during a typical shift
- Wheel guide positions and yard markings for reversing vehicles
- Access for deliveries, cranes or lifting equipment during installation
- Drainage on recessed or sloping dock approaches
- Wind exposure at the dock, which affects door and shelter choice
Options to discuss
Safety pack add-on
Vehicle restraint, inside and outside traffic lights and interlocks between door, leveller and restraint, added to any bay specification as part of the same package.
High-throughput bay
A faster door, telescopic-lip leveller and vehicle restraint with interlocked traffic lights, for docks handling many trailers a day and where drive-away risk is high.
Planning, building control and safety law in England
Workplace safety in England is regulated by HSE. For a loading bay in Egham, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.
Questions about complete loading bay installations in Egham
Is VAT included in your guide prices for complete loading bay installations?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Surrey as everywhere else: for complete loading bay installations, it is £13,500 to £26,000 per bay, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
Do you remove and dispose of the old equipment?
Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Egham, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.
How long does installation take at a site in Egham?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
Can you replace a whole bay in an operating warehouse?
Yes. In a live building we replace one bay at a time, keeping the opening secure and the neighbouring bays working. The order and timing of each bay are agreed with you so the dock keeps enough capacity throughout the works.
What is included in a complete loading bay package?
A complete loading bay package typically includes the door, leveller, shelter or seal, bumpers, wheel guides and a dock light. Vehicle restraints, traffic lights and interlocks can be added. Pits, concrete and groundworks are priced separately unless agreed otherwise, and the quote lists exactly what is included.
Complete loading bay installation near Egham
Looking beyond Egham? Our pages for Staines (2 miles), Ashford (4 miles) and Windsor (4 miles) describe the same loading bay services and how to get in touch.
Other loading bay services in Egham
Full guide to complete loading bay installations · Everything we do in Egham
Start your enquiry for Egham through the quote tool. A few photos and approximate sizes help us respond with something useful.
