- Location
- Egham, Surrey
- Main postcode district
- TW20
- Nearby (straight line)
- Staines (2 miles), Ashford (4 miles) and Windsor (4 miles)
- Survey and quote
- Free, with a fixed written quote
An edge-of-dock leveller is a compact leveller mounted on the front face or top edge of a loading dock, with no pit needed. A short hinged plate and lip bridge the gap between dock and trailer, but it can only cover a small height difference above and below dock level, so it suits sites where trailer bed heights are consistent.
Why do sites in Egham choose this?
Companies running their own vehicles in Egham, where every trailer has a known bed height, are well placed to use edge-of-dock levellers instead of pit units. Wholesalers and trade suppliers in Egham adding a second loading position can often do so economically with an edge-of-dock unit.
Smaller distribution units in Egham without dock pits can add a practical loading position with an edge-of-dock leveller fixed straight to the dock face.
Any project involving edge-of-dock levellers at a working site in Egham takes planning. We survey free of charge, quote a fixed price in writing, and then agree a programme that keeps as much of the dock running as possible. Specialist installation engineers carry out the work under our management, out of hours if that suits you better. On completion we test each item, show your team how it operates and leave the documentation with you.
Where does an edge-of-dock leveller work best?
An edge-of-dock leveller works best where trailer heights are consistent, a pit is impractical, or the budget rules out a pit leveller. It is a practical choice for many smaller operations and for adding capacity at larger ones.
- Leased units: where the lease or landlord does not allow a pit to be cut into the slab.
- Dedicated fleets: sites loading their own vehicles of a known bed height.
- Extra bays: adding loading positions at a dock where most bays already have pit levellers.
- Difficult slabs: where drainage, services or the structure would make a pit costly.
- Low-volume docks: occasional deliveries that do not justify a pit leveller.
Our guide on how to choose a dock leveller compares edge-of-dock, swing-lip and telescopic units in more detail, including the trailer and equipment questions to answer before deciding.
Do edge-of-dock levellers need the same inspections as pit levellers?
Yes, an edge-of-dock leveller is work equipment just like a pit leveller, so it must be kept in a safe condition and inspected where deterioration could lead to danger. Its small size does not exempt it.
- Great Britain: PUWER 1998 applies, with HSE as the regulator.
- Northern Ireland: PUWER (Northern Ireland) 1999 applies, with HSENI as the regulator.
- Insurer inspections: engineering insurers commonly inspect dock levellers under PUWER at 12-month intervals, so ask your insurer to confirm edge-of-dock units are on the schedule.
- Standard: the dock leveller safety standard is BS EN 1398:2009, which is current and under review.
- Trapping points: HSE guidance notes that guards or skirting may be needed on dock levellers where something could be caught, so hinge areas and plate edges are checked.
Mechanical units rely on springs and hinges that wear, so an inspection should cover these as carefully as the hydraulics on a powered unit.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What we look at on site
- How drivers are prevented from pulling away too early
- Gaps around trailers where heated or chilled air escapes
- Dock height and the mix of trailers you load
- How often each door cycles during a typical shift
- Power supply at each bay, including three-phase availability
- Working hours, shift patterns and windows for out-of-hours work
Options to discuss
New edge steel and bumpers
A replacement steel edge angle and correctly positioned bumpers to give a sound fixing and protect the leveller from trailer impact.
Hydraulic edge-of-dock leveller
Push-button operation with a compact power pack, easier for frequent use and able to be interlocked with dock doors and traffic lights.
Planning, building control and safety law in England
Lift tables and dock lifts in Egham may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.
Questions about edge-of-dock levellers in Egham
Can you work outside our normal operating hours in Egham?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
What warranty comes with new loading bay equipment?
New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Egham site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.
What details do you need from us to quote for edge-of-dock levellers?
To get started, send the site address in Egham, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.
Do edge-of-dock levellers need servicing?
Yes, they should be serviced and inspected like any leveller. Mechanical units need their springs, hinges and lip checked and lubricated, and hydraulic units also need hoses and the power pack inspected. Service visits are chargeable and agreed before anyone attends.
How long does an edge-of-dock leveller take to install?
Usually half a day to a day per bay, as there is no pit to form. Concrete or edge steel repairs add time, and hydraulic units also need connecting to power. We plan the work so the rest of the dock keeps operating while each bay is fitted.
Edge-of-dock levellers near Egham
Looking beyond Egham? Our pages for Staines (2 miles), Ashford (4 miles) and Windsor (4 miles) describe the same loading bay services and how to get in touch.
Other loading bay services in Egham
Full guide to edge-of-dock levellers · Everything we do in Egham
Speak to us about your Egham loading bay. We will ask the right questions, then set out the next step clearly.
