Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Dock levellers · Egham

Swing-lip dock levellers in Egham

Looking for swing-lip dock levellers in Egham? We cover sites throughout Surrey, from single loading bays to multi-door distribution buildings, and keep you informed at every stage of the work.

Guide £5,200–£8,800 per leveller ex VATFree site surveyTW20
Location
Egham, Surrey
Main postcode district
TW20
Nearby (straight line)
Staines (2 miles), Ashford (4 miles) and Windsor (4 miles)
Survey and quote
Free, with a fixed written quote
Swing-lip dock levellers, in short

A swing-lip dock leveller is a hydraulic ramp set into a pit at the dock edge, with a hinged steel lip along its front. When a trailer is docked the platform rises, the lip swings out, and the platform lowers until the lip rests on the trailer bed, forming a bridge for forklifts and pallet trucks. The lip is typically about 400 to 500 mm long.

How does this suit sites in Egham?

Operators in Egham who have added electric pallet trucks to their fleet may find an existing leveller too short, making a longer platform worth considering. Every leveller recommendation we make for a dock in Egham follows a measured survey of the pit, dock height and the trailers you actually receive.

Mixed bays at a site in Egham, where some trailers have tail lifts and others do not, may suit a combination of swing-lip and telescopic levellers.

We do not give a fixed price without seeing the site. A free survey in Egham lets us check the details that affect the job, and the written quote that follows is a fixed price for the agreed scope. We plan the work around your operation, arrange out-of-hours access if you need it and manage specialist installation engineers throughout. Handover includes testing, a demonstration and the paperwork you need for your records.

How much does a swing-lip dock leveller cost?

A swing-lip dock leveller typically costs £5,200 to £8,800 per leveller, excluding VAT, supply and fit, assuming it goes into an existing, sound pit. New pits, pit repairs, concrete and groundworks are priced separately after survey.

Within that range, the price is driven by:

  • Platform length: longer platforms give a gentler gradient but cost more.
  • Width and capacity: wider decks and higher load ratings use heavier steel and cylinders.
  • Lip length: a longer lip reaches further onto the trailer bed.
  • Insulation and sealing: insulated platforms and pit seals for chilled buildings.
  • Controls and interlocks: links to the door, restraint or traffic lights.
  • Removal and access: taking out the old unit, lifting equipment for delivery and out-of-hours work.

If the pit edge steel is damaged or the pit is out of square, we tell you at survey and price the repair as a separate item, so the leveller price stays clear. The written quote is then the fixed price for the work described.

How long should a dock leveller platform be?

A leveller platform should be long enough to keep the slope gentle across the full range of trailer heights you load, because the steepest gradient decides which handling equipment can use it safely. A longer platform spreads the same height difference over a greater distance.

  • Know your trailer mix: with a dock typically around 1,200 mm high and trailer beds ranging from roughly 900 to 1,600 mm, the height difference can be considerable.
  • Check your equipment: low-clearance electric pallet trucks cope with less gradient than a counterbalance forklift with good ground clearance.
  • Common lengths: platforms are commonly made from around 2 to 3.5 m long, with longer units where trailers sit very low or very high.
  • Width: a wider platform gives more room when pallets sit close to the trailer sides.

When replacing a unit, the pit size limits what can be fitted, so we measure the pit and record your trailer heights at survey before recommending a length.

Guide price, Egham
£5,200–£8,800 per leveller, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What we look at on site

  • Gaps around trailers where heated or chilled air escapes
  • Age and condition of the equipment already in place
  • Lighting inside trailers and at the dock face
  • Asbestos register and any other site hazard information
  • Condition of any existing leveller pit, kerb angles and pit drainage
  • Scope to convert ground-level doors into docks or add lift tables

Options to discuss

Long-platform leveller

A longer platform that keeps gradients gentle where trailer heights vary widely or low-clearance electric pallet trucks are used across the bay.

Standard swing-lip leveller

A hydraulic pit leveller with a hinged lip of about 400 to 500 mm, suited to general distribution with curtain-siders and box trailers.

Regulations and approvals in England

Sites in Egham fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.

Questions about swing-lip dock levellers in Egham

Do you remove and dispose of the old equipment?

Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Egham, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.

Can you work alongside our main contractor on a new build in Egham?

Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.

Do you cover Egham for swing-lip dock levellers?

Yes. We take on swing-lip dock levellers for businesses in Egham and across Surrey. We survey the site, provide a fixed written quote and manage the installation, with specialist installation engineers working under our management. Visits are arranged in advance at a time that suits your operation, and the same single contact stays with the job through to handover.

What happens if a trailer pulls away with the lip on its bed?

The platform drops until its safety system stops it. Hydraulic levellers have a velocity fuse that arrests the fall, but the event can still damage the leveller and endanger anyone on it, which is why dock traffic lights, restraints and key control are used to prevent early drive-away.

Do levellers need a three-phase supply?

Most hydraulic dock levellers use a three-phase supply, although some smaller units run on single phase. When replacing like for like, the existing supply can often be reused if it is in good order. We check the supply at survey and include any electrical work in the quote.

Swing-lip dock levellers near Egham

If your site is not in Egham itself, it may be near one of these: Staines (2 miles), Ashford (4 miles) and Windsor (4 miles). Pick the closest.

Other loading bay services in Egham

Full guide to swing-lip dock levellers · Everything we do in Egham

Call us or request a quote online to talk through loading bay work at your site in Egham.

Call freeGet a quote