A complete loading bay installation is the supply and fitting of every item a dock needs as one coordinated package: typically an insulated door, a dock leveller, a shelter or seal, bumpers, wheel guides, a dock light and traffic lights or interlocks. One party manages the design, sequence and commissioning, so the parts fit together and work as a single system.
Is this right for your site in Leicestershire?
Main contractors working on warehouse schemes around Leicestershire need pit drawings and embed details early, which a complete bay package provides at design stage. Developers building new distribution sheds in Leicestershire can hand the whole dock package to one specialist, reducing the risk of gaps between the door, leveller and shelter trades.
Ageing bays in Leicestershire where the door, leveller and shelter are all worn can be replaced together, avoiding three separate disruptions to the same dock.
The survey is free, the quote is written and the price is fixed: that is how every installation in Leicestershire begins. We then manage the work from start to finish. Fitting is carried out by specialist installers under our management, phased so the operation keeps moving, and nights or weekends can be booked by arrangement. On the final day we test the equipment with you and hand over the operating and maintenance information.
What happens on site during a complete bay installation?
On a new build, a complete bay is installed to the main contractor's programme once the pits, openings and supplies are ready. In an operating warehouse, bays are replaced one at a time so the rest of the dock keeps working.
- Isolation: each bay is closed to trailers and its old equipment isolated and removed.
- Security: the opening is kept secure, either by fitting the new door early or with temporary hoarding.
- Lifting and deliveries: levellers and door sections need a clear delivery area and safe lifting.
- Commissioning: the door, leveller, shelter and controls are tested together, including any interlocks.
We ask you to provide access and a delivery area, power and welfare arrangements on construction sites, permit-to-work and induction details, and an agreed order for releasing bays. At handover you receive commissioning and test records, operating instructions and maintenance requirements. Equipment comes with the manufacturer's warranty, and workmanship terms are set out in writing in the quote.
How much does a complete loading bay cost?
A complete loading bay typically costs £13,500 to £26,000 per bay, supplied and installed, excluding VAT. That covers the door, leveller, shelter or seal and core safety items, and assumes a sound structural opening and an existing or separately formed leveller pit.
What moves the price:
- Door type: an insulated sectional door costs less than a high-speed or cold store door.
- Leveller type: telescopic-lip levellers cost more than swing-lip.
- Shelter or seal: inflatable shelters sit at the top of the range.
- Safety package: restraints, traffic lights and interlocks add to the base bay.
- Number of bays: repeat bays on one project lower the cost per bay.
- Programme: phased or out-of-hours working in a live building adds cost.
New pits, pit repairs, concrete and groundworks are priced separately after survey. Following a free site survey, the written quote is the fixed price. VAT is added at the standard rate.
Towns we cover in Leicestershire
Each of the following towns in Leicestershire has its own page on complete loading bay installations, covering how we work and what to send us.
- Leicester
- Loughborough
- Hinckley
- Coalville
- Wigston Magna
- Melton Mowbray
- Market Harborough
- Oadby
- Earl Shilton
- Mountsorrel
- Castle Donington
- Lutterworth
Budget range for supply and fit. The written quote after a free survey is the fixed price. All guide prices.
Which rules apply in England?
Lift tables and dock lifts in Leicestershire may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.
Questions
Can you work alongside our main contractor on a new build in Leicestershire?
Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.
What warranty comes with new loading bay equipment?
New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Leicestershire site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.
Do you work with main contractors on new builds?
Yes. On new warehouses we work as the specialist dock package contractor to the main contractor's programme. We provide pit, dock face and electrical details early so the groundworks and building envelope are built to suit the equipment, then install and commission each bay.
Do all bays on a site need the same equipment?
No. Many sites keep most bays on a standard specification and fit one or two bays differently, for example with a telescopic lip for end-loading or a lift table for vans. Keeping a common door, control and shelter type where possible makes training and servicing simpler.
Other services in Leicestershire
Full guide to complete loading bay installations · All loading bay services in Leicestershire

