Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Dock levellers · Chippenham

Swing-lip dock levellers in Chippenham

We look after swing-lip dock levellers for warehouses and factories in Chippenham, planning the work around deliveries and collections so that the dock stays as available as possible.

Guide £5,200–£8,800 per leveller ex VATFree site surveySN15
Location
Chippenham, Wiltshire
Main postcode district
SN15
Nearby (straight line)
Calne (5 miles), Melksham (6 miles) and Devizes (9 miles)
Survey and quote
Free, with a fixed written quote
Swing-lip dock levellers, in short

A swing-lip dock leveller is a hydraulic ramp set into a pit at the dock edge, with a hinged steel lip along its front. When a trailer is docked the platform rises, the lip swings out, and the platform lowers until the lip rests on the trailer bed, forming a bridge for forklifts and pallet trucks. The lip is typically about 400 to 500 mm long.

How does this suit sites in Chippenham?

Ageing levellers in older docks around Chippenham can often be replaced like for like in the existing pit, avoiding new concrete work if the pit is sound. Mixed bays at a site in Chippenham, where some trailers have tail lifts and others do not, may suit a combination of swing-lip and telescopic levellers.

Every leveller recommendation we make for a dock in Chippenham follows a measured survey of the pit, dock height and the trailers you actually receive.

Keeping the dock running is usually the first concern, so we plan around it. After a free survey of your Chippenham site and a written quote at a fixed price, we agree when each bay can be released and whether any work should happen out of hours. Specialist installation engineers working under our management then fit the equipment, and we test it and hand over the documentation before the bay goes back into use.

Do dock levellers have to be inspected by law?

Yes, dock levellers are work equipment and must be kept in a safe condition and inspected where deterioration could lead to danger. The law and the regulator depend on where the site is.

  • Great Britain: the Provision and Use of Work Equipment Regulations 1998 (PUWER), enforced by HSE.
  • Northern Ireland: PUWER (Northern Ireland) 1999, enforced by HSENI.
  • Inspection interval: engineering insurers commonly inspect dock levellers under PUWER at 12-month intervals.
  • LOLER: most levellers are treated as work equipment under PUWER, but one designed or used to lift people may fall under LOLER, or LOLER (Northern Ireland) 1999, with 6-monthly thorough examination. It depends on the equipment and how it is used; your insurer or competent person will confirm.
  • Standard: BS EN 1398:2009 sets the safety requirements for dock levellers. It is current and under review.

Our inspection guide explains what an examiner looks at.

How much does a swing-lip dock leveller cost?

A swing-lip dock leveller typically costs £5,200 to £8,800 per leveller, excluding VAT, supply and fit, assuming it goes into an existing, sound pit. New pits, pit repairs, concrete and groundworks are priced separately after survey.

Within that range, the price is driven by:

  • Platform length: longer platforms give a gentler gradient but cost more.
  • Width and capacity: wider decks and higher load ratings use heavier steel and cylinders.
  • Lip length: a longer lip reaches further onto the trailer bed.
  • Insulation and sealing: insulated platforms and pit seals for chilled buildings.
  • Controls and interlocks: links to the door, restraint or traffic lights.
  • Removal and access: taking out the old unit, lifting equipment for delivery and out-of-hours work.

If the pit edge steel is damaged or the pit is out of square, we tell you at survey and price the repair as a separate item, so the leveller price stays clear. The written quote is then the fixed price for the work described.

Guide price, Chippenham
£5,200–£8,800 per leveller, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What does the free survey cover?

  • How often each door cycles during a typical shift
  • Whether planning, building control or a building warrant may be needed
  • Age and condition of the equipment already in place
  • Dock height and the mix of trailers you load
  • Gaps around trailers where heated or chilled air escapes
  • Condition of any existing leveller pit, kerb angles and pit drainage

Options to discuss

Long-platform leveller

A longer platform that keeps gradients gentle where trailer heights vary widely or low-clearance electric pallet trucks are used across the bay.

Insulated leveller

An insulated platform with perimeter seals around the pit that reduces cold loss through the floor of the bay at chilled and frozen docks.

Planning, building control and safety law in England

Lift tables and dock lifts in Chippenham may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.

Questions about swing-lip dock levellers in Chippenham

Is VAT included in your guide prices for swing-lip dock levellers?

No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Wiltshire as everywhere else: for swing-lip dock levellers, it is £5,200 to £8,800 per leveller, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.

How long does installation take at a site in Chippenham?

It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.

Can you work alongside our main contractor on a new build in Chippenham?

Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.

What happens if a trailer pulls away with the lip on its bed?

The platform drops until its safety system stops it. Hydraulic levellers have a velocity fuse that arrests the fall, but the event can still damage the leveller and endanger anyone on it, which is why dock traffic lights, restraints and key control are used to prevent early drive-away.

What capacity of leveller do we need?

The leveller needs to be rated for the heaviest combined load of forklift and goods that will cross it, allowing for the truck moving over it. General-purpose levellers are typically rated around 60 kN, with heavier ratings for heavy goods or large forklifts. We confirm the rating after looking at your equipment.

Swing-lip dock levellers near Chippenham

Close neighbours of Chippenham with their own pages here: Calne (5 miles), Melksham (6 miles) and Devizes (9 miles). Choose one to see coverage details for that town.

Other loading bay services in Chippenham

Full guide to swing-lip dock levellers · Everything we do in Chippenham

Whether it is a new bay or a fault on an existing one, call us or request a quote for your site in Chippenham.

Call freeGet a quote