- Location
- Chorley, Lancashire
- Main postcode district
- PR7
- Nearby (straight line)
- Leyland (4 miles), Darwen (7 miles) and Wigan (7 miles)
- Survey and quote
- Free, with a fixed written quote
A swing-lip dock leveller is a hydraulic ramp set into a pit at the dock edge, with a hinged steel lip along its front. When a trailer is docked the platform rises, the lip swings out, and the platform lowers until the lip rests on the trailer bed, forming a bridge for forklifts and pallet trucks. The lip is typically about 400 to 500 mm long.
What should sites in Chorley consider?
Operators in Chorley who have added electric pallet trucks to their fleet may find an existing leveller too short, making a longer platform worth considering. Distribution warehouses in Chorley loading curtain-siders and box trailers every day are typical users of swing-lip levellers, which handle routine pallet loading well.
Ageing levellers in older docks around Chorley can often be replaced like for like in the existing pit, avoiding new concrete work if the pit is sound.
Keeping the dock running is usually the first concern, so we plan around it. After a free survey of your Chorley site and a written quote at a fixed price, we agree when each bay can be released and whether any work should happen out of hours. Specialist installation engineers working under our management then fit the equipment, and we test it and hand over the documentation before the bay goes back into use.
How long should a dock leveller platform be?
A leveller platform should be long enough to keep the slope gentle across the full range of trailer heights you load, because the steepest gradient decides which handling equipment can use it safely. A longer platform spreads the same height difference over a greater distance.
- Know your trailer mix: with a dock typically around 1,200 mm high and trailer beds ranging from roughly 900 to 1,600 mm, the height difference can be considerable.
- Check your equipment: low-clearance electric pallet trucks cope with less gradient than a counterbalance forklift with good ground clearance.
- Common lengths: platforms are commonly made from around 2 to 3.5 m long, with longer units where trailers sit very low or very high.
- Width: a wider platform gives more room when pallets sit close to the trailer sides.
When replacing a unit, the pit size limits what can be fitted, so we measure the pit and record your trailer heights at survey before recommending a length.
Which trailers and loads suit a swing-lip leveller?
A swing-lip leveller suits everyday loading of standard trailers, where pallets sit a little way back from the rear of the trailer and the lip has room to land on the bed. It is a common choice for general distribution.
- Good fit: curtain-siders and box trailers loaded by forklift or pallet truck, with the lip landing behind the first row of pallets.
- Less suited: trailers loaded right up to the rear doors, because the lip needs clear bed space to rest on.
- Tail-lift vehicles: a folded tail lift can stop the lip reaching the bed.
- End loading: loading the last row of pallets at the very rear is awkward with a fixed-length lip.
Where these situations are common, a telescopic-lip dock leveller places its lip exactly where it is needed. Many sites fit both types across their bays, matching each bay to the vehicles it receives.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- How drivers are prevented from pulling away too early
- Wheel guide positions and yard markings for reversing vehicles
- Control positions, isolators and any existing interlocks
- Yard gradient and the slope of the approach to the dock
- Lighting inside trailers and at the dock face
- Dock height and the mix of trailers you load
Options to discuss
Insulated leveller
An insulated platform with perimeter seals around the pit that reduces cold loss through the floor of the bay at chilled and frozen docks.
Long-platform leveller
A longer platform that keeps gradients gentle where trailer heights vary widely or low-clearance electric pallet trucks are used across the bay.
What do the rules in England mean for the work?
Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Chorley. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.
Questions about swing-lip dock levellers in Chorley
Is the site survey in Chorley free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
Do you cover Chorley for swing-lip dock levellers?
Yes. We take on swing-lip dock levellers for businesses in Chorley and across Lancashire. We survey the site, provide a fixed written quote and manage the installation, with specialist installation engineers working under our management. Visits are arranged in advance at a time that suits your operation, and the same single contact stays with the job through to handover.
What warranty comes with new loading bay equipment?
New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Chorley site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.
Can a swing-lip leveller be used as a ramp to the yard?
No, a leveller should only be used to bridge a docked trailer. The lip and toe guards are designed to work with a trailer bed in place, and the platform is not built as a ramp down to yard level. Where you need ground-level access, a separate door or a lift table is the safer answer.
Do levellers need a three-phase supply?
Most hydraulic dock levellers use a three-phase supply, although some smaller units run on single phase. When replacing like for like, the existing supply can often be reused if it is in good order. We check the supply at survey and include any electrical work in the quote.
Swing-lip dock levellers near Chorley
The same survey, quote and repair service is available in towns around Chorley, such as Leyland (4 miles), Darwen (7 miles) and Wigan (7 miles).
Other loading bay services in Chorley
Full guide to swing-lip dock levellers · Everything we do in Chorley
Speak to us about your Chorley loading bay. We will ask the right questions, then set out the next step clearly.
