- Location
- Wick, Highlands
- Main postcode district
- KW1
- Nearby (straight line)
- Thurso (19 miles)
- Survey and quote
- Free, with a fixed written quote
A swing-lip dock leveller is a hydraulic ramp set into a pit at the dock edge, with a hinged steel lip along its front. When a trailer is docked the platform rises, the lip swings out, and the platform lowers until the lip rests on the trailer bed, forming a bridge for forklifts and pallet trucks. The lip is typically about 400 to 500 mm long.
What should sites in Wick consider?
Ageing levellers in older docks around Wick can often be replaced like for like in the existing pit, avoiding new concrete work if the pit is sound. Fitting out a new warehouse in Wick with pre-formed pits makes swing-lip levellers a straightforward choice for most general loading from day one.
Mixed bays at a site in Wick, where some trailers have tail lifts and others do not, may suit a combination of swing-lip and telescopic levellers.
The survey is free, the quote is written and the price is fixed: that is how every installation in Wick begins. We then manage the work from start to finish. Fitting is carried out by specialist installers under our management, phased so the operation keeps moving, and nights or weekends can be booked by arrangement. On the final day we test the equipment with you and hand over the operating and maintenance information.
What happens when a swing-lip leveller is fitted into an existing pit?
Fitting a swing-lip leveller into an existing pit normally takes one to two working days per bay, with the bay closed throughout. The work runs in a set order:
- The old leveller is isolated, lifted out and removed from site.
- The pit is cleaned and measured, and the edge steel checked for damage.
- The new leveller is lowered in, set level, and welded or anchored to the pit steel.
- The hydraulic power pack and control panel are connected, and any interlocks wired.
- Toe guards, lip and bumpers are checked, then the leveller is run through its full range.
From your side we need the bay emptied and taken out of service, clear access for lifting equipment inside or outside the building, and a suitable power supply, which for most hydraulic levellers is three-phase. If the pit needs repairs, these are done first and can add time, which we confirm in the quote.
How much does a swing-lip dock leveller cost?
A swing-lip dock leveller typically costs £5,200 to £8,800 per leveller, excluding VAT, supply and fit, assuming it goes into an existing, sound pit. New pits, pit repairs, concrete and groundworks are priced separately after survey.
Within that range, the price is driven by:
- Platform length: longer platforms give a gentler gradient but cost more.
- Width and capacity: wider decks and higher load ratings use heavier steel and cylinders.
- Lip length: a longer lip reaches further onto the trailer bed.
- Insulation and sealing: insulated platforms and pit seals for chilled buildings.
- Controls and interlocks: links to the door, restraint or traffic lights.
- Removal and access: taking out the old unit, lifting equipment for delivery and out-of-hours work.
If the pit edge steel is damaged or the pit is out of square, we tell you at survey and price the repair as a separate item, so the leveller price stays clear. The written quote is then the fixed price for the work described.
The same published guide range applies across Scotland; access, out-of-hours working and site conditions are confirmed at the free survey.
Survey checklist for your dock
- Wind exposure at the dock, which affects door and shelter choice
- Headroom above the opening and which track type will suit it
- How often each door cycles during a typical shift
- How drivers are prevented from pulling away too early
- Traffic routes for vehicles and separation of pedestrians
- Control positions, isolators and any existing interlocks
Options to discuss
Interlocked controls
Control panels linked to the dock door, vehicle restraint or traffic lights so the leveller can only be operated when the dock is safe.
Long-platform leveller
A longer platform that keeps gradients gentle where trailer heights vary widely or low-clearance electric pallet trucks are used across the bay.
Planning, building control and safety law in Scotland
Lift tables at Scottish sites are lifting equipment under LOLER, which means thorough examination at least every 12 months, or every 6 months if people are lifted, depending on the equipment and its use. For a site in Wick, your insurer or competent person will confirm the interval, and we check what applies at survey.
We cover Wick by arrangement. The survey and written quote stay free: for remote and island sites we often start from your photos, drawings and a video call, then confirm measurements on site. Travel and any accommodation needed for the installation are shown as separate lines in the fixed quote.
Questions about swing-lip dock levellers in Wick
Can you work alongside our main contractor on a new build in Wick?
Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.
Can you work outside our normal operating hours in Wick?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
What details do you need from us to quote for swing-lip dock levellers?
To get started, send the site address in Wick, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.
Do levellers need a three-phase supply?
Most hydraulic dock levellers use a three-phase supply, although some smaller units run on single phase. When replacing like for like, the existing supply can often be reused if it is in good order. We check the supply at survey and include any electrical work in the quote.
Can a new leveller fit our old pit?
Usually, yes. Levellers are made in standard sizes and many can be supplied to suit an existing pit, but the pit must be square, sound and deep enough. We measure the pit and check the edge steel at survey, and if adjustment or repair is needed we price it separately.
Swing-lip dock levellers near Wick
We also cover towns near Wick, including Thurso (19 miles). Each has its own page with the same services and process.
Other loading bay services in Wick
Full guide to swing-lip dock levellers · Everything we do in Wick
Send a few photos of the dock and a short description of the problem, and we will come back to you about your Wick site.
