- Location
- Stevenage, Hertfordshire
- Main postcode district
- SG1
- Nearby (straight line)
- Hitchin (5 miles), Letchworth Garden City (5 miles) and Welwyn Garden City (7 miles)
- Survey and quote
- Free, with a fixed written quote
A swing-lip dock leveller is a hydraulic ramp set into a pit at the dock edge, with a hinged steel lip along its front. When a trailer is docked the platform rises, the lip swings out, and the platform lowers until the lip rests on the trailer bed, forming a bridge for forklifts and pallet trucks. The lip is typically about 400 to 500 mm long.
What matters for swing-lip dock levellers in Stevenage?
Operators in Stevenage who have added electric pallet trucks to their fleet may find an existing leveller too short, making a longer platform worth considering. Should a recent insurance inspection at a site in Stevenage have flagged leveller defects, a survey can show whether repair or replacement makes more sense.
Chilled food distributors in Stevenage can specify insulated swing-lip levellers with pit seals to cut cold loss through the floor of the bay.
We keep the process simple for sites in Stevenage. A free survey tells us what the dock needs; a fixed written quote tells you what it will cost and what is included. We then organise the installation, with specialist engineers under our management and a programme agreed around your shifts. Night and weekend work is available by arrangement. Before we leave, the new equipment is tested, demonstrated and handed over with its documentation.
What wears out on a swing-lip dock leveller?
The lip hinge, hydraulic hoses and seals are usually the first parts to wear on a swing-lip leveller, and planned servicing finds most of these problems before they stop a bay.
- Lip hinge: takes an impact every time the lip lands, and suffers badly if trailers reverse into a lip that has not been stored.
- Hydraulics: hoses, cylinder seals and power pack oil age and can leak.
- Velocity fuse: the safety valve that stops the platform dropping if a trailer pulls away must be tested.
- Toe guards and maintenance strut: must be intact and working. HSE guidance notes guards or skirting may be needed where something could be caught.
- Dock bumpers: worn bumpers let trailers strike the leveller and dock edge.
A leveller with a cracked lip hinge, a bent platform or repeated hydraulic leaks may be better replaced than repaired. Service and repair visits are chargeable and agreed before anyone attends.
How much does a swing-lip dock leveller cost?
A swing-lip dock leveller typically costs £5,200 to £8,800 per leveller, excluding VAT, supply and fit, assuming it goes into an existing, sound pit. New pits, pit repairs, concrete and groundworks are priced separately after survey.
Within that range, the price is driven by:
- Platform length: longer platforms give a gentler gradient but cost more.
- Width and capacity: wider decks and higher load ratings use heavier steel and cylinders.
- Lip length: a longer lip reaches further onto the trailer bed.
- Insulation and sealing: insulated platforms and pit seals for chilled buildings.
- Controls and interlocks: links to the door, restraint or traffic lights.
- Removal and access: taking out the old unit, lifting equipment for delivery and out-of-hours work.
If the pit edge steel is damaged or the pit is out of square, we tell you at survey and price the repair as a separate item, so the leveller price stays clear. The written quote is then the fixed price for the work described.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- Scope to convert ground-level doors into docks or add lift tables
- Drainage on recessed or sloping dock approaches
- Asbestos register and any other site hazard information
- Gaps around trailers where heated or chilled air escapes
- Wheel guide positions and yard markings for reversing vehicles
- Control positions, isolators and any existing interlocks
Options to discuss
Insulated leveller
An insulated platform with perimeter seals around the pit that reduces cold loss through the floor of the bay at chilled and frozen docks.
Long-platform leveller
A longer platform that keeps gradients gentle where trailer heights vary widely or low-clearance electric pallet trucks are used across the bay.
Which rules apply in England?
Workplace safety in England is regulated by HSE. For a loading bay in Stevenage, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.
Questions about swing-lip dock levellers in Stevenage
Is VAT included in your guide prices for swing-lip dock levellers?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Hertfordshire as everywhere else: for swing-lip dock levellers, it is £5,200 to £8,800 per leveller, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
Which building and safety rules apply to a site in Stevenage?
It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Stevenage, we check what applies at survey and design to it.
How long does installation take at a site in Stevenage?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
What capacity of leveller do we need?
The leveller needs to be rated for the heaviest combined load of forklift and goods that will cross it, allowing for the truck moving over it. General-purpose levellers are typically rated around 60 kN, with heavier ratings for heavy goods or large forklifts. We confirm the rating after looking at your equipment.
Can a new leveller fit our old pit?
Usually, yes. Levellers are made in standard sizes and many can be supplied to suit an existing pit, but the pit must be square, sound and deep enough. We measure the pit and check the edge steel at survey, and if adjustment or repair is needed we price it separately.
Swing-lip dock levellers near Stevenage
Distances are measured from Stevenage. Nearby towns we cover include Hitchin (5 miles), Letchworth Garden City (5 miles) and Welwyn Garden City (7 miles), and other towns in the area are covered too.
Other loading bay services in Stevenage
Full guide to swing-lip dock levellers · Everything we do in Stevenage
Whether it is a new bay or a fault on an existing one, call us or request a quote for your site in Stevenage.
