- Location
- Stroud, Gloucestershire
- Main postcode district
- GL5
- Nearby (straight line)
- Gloucester (8 miles), Cirencester (10 miles) and Cheltenham (12 miles)
- Survey and quote
- Free, with a fixed written quote
A swing-lip dock leveller is a hydraulic ramp set into a pit at the dock edge, with a hinged steel lip along its front. When a trailer is docked the platform rises, the lip swings out, and the platform lowers until the lip rests on the trailer bed, forming a bridge for forklifts and pallet trucks. The lip is typically about 400 to 500 mm long.
Where does this fit at a dock in Stroud?
Operators in Stroud who have added electric pallet trucks to their fleet may find an existing leveller too short, making a longer platform worth considering. Mixed bays at a site in Stroud, where some trailers have tail lifts and others do not, may suit a combination of swing-lip and telescopic levellers.
Distribution warehouses in Stroud loading curtain-siders and box trailers every day are typical users of swing-lip levellers, which handle routine pallet loading well.
Here is what happens after you contact us about a site in Stroud. We arrange a free survey, measure up and send a fixed written quote. If you go ahead, we manage the whole job, including ordering, delivery and coordination with your site team. Specialist installation engineers working under our management do the fitting, at times built around your loading schedule, with out-of-hours work by arrangement. Testing and handover documents close the job.
What happens when a swing-lip leveller is fitted into an existing pit?
Fitting a swing-lip leveller into an existing pit normally takes one to two working days per bay, with the bay closed throughout. The work runs in a set order:
- The old leveller is isolated, lifted out and removed from site.
- The pit is cleaned and measured, and the edge steel checked for damage.
- The new leveller is lowered in, set level, and welded or anchored to the pit steel.
- The hydraulic power pack and control panel are connected, and any interlocks wired.
- Toe guards, lip and bumpers are checked, then the leveller is run through its full range.
From your side we need the bay emptied and taken out of service, clear access for lifting equipment inside or outside the building, and a suitable power supply, which for most hydraulic levellers is three-phase. If the pit needs repairs, these are done first and can add time, which we confirm in the quote.
How long should a dock leveller platform be?
A leveller platform should be long enough to keep the slope gentle across the full range of trailer heights you load, because the steepest gradient decides which handling equipment can use it safely. A longer platform spreads the same height difference over a greater distance.
- Know your trailer mix: with a dock typically around 1,200 mm high and trailer beds ranging from roughly 900 to 1,600 mm, the height difference can be considerable.
- Check your equipment: low-clearance electric pallet trucks cope with less gradient than a counterbalance forklift with good ground clearance.
- Common lengths: platforms are commonly made from around 2 to 3.5 m long, with longer units where trailers sit very low or very high.
- Width: a wider platform gives more room when pallets sit close to the trailer sides.
When replacing a unit, the pit size limits what can be fitted, so we measure the pit and record your trailer heights at survey before recommending a length.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What do we check at the survey?
- How drivers are prevented from pulling away too early
- Forklift and pallet truck loads crossing the leveller platform
- Condition of any existing leveller pit, kerb angles and pit drainage
- Clear opening width and height for each door
- Asbestos register and any other site hazard information
- Escape routes and pedestrian doors close to the bay
Options to discuss
Standard swing-lip leveller
A hydraulic pit leveller with a hinged lip of about 400 to 500 mm, suited to general distribution with curtain-siders and box trailers.
Interlocked controls
Control panels linked to the dock door, vehicle restraint or traffic lights so the leveller can only be operated when the dock is safe.
Regulations and approvals in England
Workplace safety in England is regulated by HSE. For a loading bay in Stroud, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.
Questions about swing-lip dock levellers in Stroud
Can you work outside our normal operating hours in Stroud?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
Is the site survey in Stroud free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
How long does installation take at a site in Stroud?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
How long does a replacement leveller take to arrive?
Lead times depend on size, specification and the manufacturer, and we confirm them in the written quote. The existing leveller can usually stay in use until the replacement is on site, so the bay is only closed for the installation itself.
Do levellers need a three-phase supply?
Most hydraulic dock levellers use a three-phase supply, although some smaller units run on single phase. When replacing like for like, the existing supply can often be reused if it is in good order. We check the supply at survey and include any electrical work in the quote.
Swing-lip dock levellers near Stroud
Nearby places we cover, measured from Stroud, include Gloucester (8 miles), Cirencester (10 miles) and Cheltenham (12 miles). Ask if your own town is missing.
Other loading bay services in Stroud
Full guide to swing-lip dock levellers · Everything we do in Stroud
Tell us what is happening at your Stroud dock, what equipment is there and when it is used, and we will suggest the right next step.