- Location
- Cheltenham, Gloucestershire
- Main postcode districts
- GL50 and GL52
- Nearby (straight line)
- Tewkesbury (7 miles), Gloucester (7 miles) and Stroud (12 miles)
- Survey and quote
- Free, with a fixed written quote
A swing-lip dock leveller is a hydraulic ramp set into a pit at the dock edge, with a hinged steel lip along its front. When a trailer is docked the platform rises, the lip swings out, and the platform lowers until the lip rests on the trailer bed, forming a bridge for forklifts and pallet trucks. The lip is typically about 400 to 500 mm long.
Why do sites in Cheltenham choose this?
Chilled food distributors in Cheltenham can specify insulated swing-lip levellers with pit seals to cut cold loss through the floor of the bay. Fitting out a new warehouse in Cheltenham with pre-formed pits makes swing-lip levellers a straightforward choice for most general loading from day one.
Should a recent insurance inspection at a site in Cheltenham have flagged leveller defects, a survey can show whether repair or replacement makes more sense.
Any project involving swing-lip dock levellers at a working site in Cheltenham takes planning. We survey free of charge, quote a fixed price in writing, and then agree a programme that keeps as much of the dock running as possible. Specialist installation engineers carry out the work under our management, out of hours if that suits you better. On completion we test each item, show your team how it operates and leave the documentation with you.
Do dock levellers have to be inspected by law?
Yes, dock levellers are work equipment and must be kept in a safe condition and inspected where deterioration could lead to danger. The law and the regulator depend on where the site is.
- Great Britain: the Provision and Use of Work Equipment Regulations 1998 (PUWER), enforced by HSE.
- Northern Ireland: PUWER (Northern Ireland) 1999, enforced by HSENI.
- Inspection interval: engineering insurers commonly inspect dock levellers under PUWER at 12-month intervals.
- LOLER: most levellers are treated as work equipment under PUWER, but one designed or used to lift people may fall under LOLER, or LOLER (Northern Ireland) 1999, with 6-monthly thorough examination. It depends on the equipment and how it is used; your insurer or competent person will confirm.
- Standard: BS EN 1398:2009 sets the safety requirements for dock levellers. It is current and under review.
Our inspection guide explains what an examiner looks at.
How long should a dock leveller platform be?
A leveller platform should be long enough to keep the slope gentle across the full range of trailer heights you load, because the steepest gradient decides which handling equipment can use it safely. A longer platform spreads the same height difference over a greater distance.
- Know your trailer mix: with a dock typically around 1,200 mm high and trailer beds ranging from roughly 900 to 1,600 mm, the height difference can be considerable.
- Check your equipment: low-clearance electric pallet trucks cope with less gradient than a counterbalance forklift with good ground clearance.
- Common lengths: platforms are commonly made from around 2 to 3.5 m long, with longer units where trailers sit very low or very high.
- Width: a wider platform gives more room when pallets sit close to the trailer sides.
When replacing a unit, the pit size limits what can be fitted, so we measure the pit and record your trailer heights at survey before recommending a length.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What we look at on site
- Control positions, isolators and any existing interlocks
- Drainage on recessed or sloping dock approaches
- Asbestos register and any other site hazard information
- Condition of any existing leveller pit, kerb angles and pit drainage
- Scope to convert ground-level doors into docks or add lift tables
- Wind exposure at the dock, which affects door and shelter choice
Options to discuss
Long-platform leveller
A longer platform that keeps gradients gentle where trailer heights vary widely or low-clearance electric pallet trucks are used across the bay.
Standard swing-lip leveller
A hydraulic pit leveller with a hinged lip of about 400 to 500 mm, suited to general distribution with curtain-siders and box trailers.
Which rules apply in England?
Lift tables and dock lifts in Cheltenham may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.
Questions about swing-lip dock levellers in Cheltenham
Which building and safety rules apply to a site in Cheltenham?
It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Cheltenham, we check what applies at survey and design to it.
How long does installation take at a site in Cheltenham?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
Will you deal with building control and planning for a project in Cheltenham?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
How long does a replacement leveller take to arrive?
Lead times depend on size, specification and the manufacturer, and we confirm them in the written quote. The existing leveller can usually stay in use until the replacement is on site, so the bay is only closed for the installation itself.
What capacity of leveller do we need?
The leveller needs to be rated for the heaviest combined load of forklift and goods that will cross it, allowing for the truck moving over it. General-purpose levellers are typically rated around 60 kN, with heavier ratings for heavy goods or large forklifts. We confirm the rating after looking at your equipment.
Swing-lip dock levellers near Cheltenham
Distances are measured from Cheltenham. Nearby towns we cover include Tewkesbury (7 miles), Gloucester (7 miles) and Stroud (12 miles), and other towns in the area are covered too.
Other loading bay services in Cheltenham
Full guide to swing-lip dock levellers · Everything we do in Cheltenham
For a written price on loading bay work in Cheltenham, request a quote and include photos of the bay if you can.
